Teks Konple Dokiman an
Teks ki soti nan dokiman orijinal la pou endeksasyon.
[page 1]
. * HAITIAN CITIES: ACTIONS FOR TODAY
WITH AN EYE ON TOMORROW
ETr* Ve —f NS
BRU Su (6
[page 2]
[page 3]
HAITIAN CITIES: ACTIONS FOR TODAY
WITH AN EYE ON TOMORROW
Nancy Lozano-Gracia
à Marisa Garcia Lozano
Editors
THE WORLD BANK
[page 4]
© 2017 International Bank for Reconstruction and Development / The World Bank
1818 H Street NW
Washington DC 20433
Telephone: 202-473-1000
Internet: www.worldbank.org
This work is a product of the staff of The World Bank with external contributions. The findings,
interpretations, and conclusions expressed in this work do not necessarily reflect the views of The
World Bank, its Board of Executive Directors, or the governments they represent.
The World Bank does not guarantee the accuracy of the data included in this work. The bound-
aries, colors, denominations, and other information shown on aTny map in this work do not imply
any judgment on the part of The World Bank concerning the legal status of any territory or the
endorsement or acceptance of such boundaries.
Rights and Permissions
The material in this work is subject to copyright. Because The World Bank encourages dissem-
ination of its knowledge, this work may be reproduced, in whole or in part, for noncommercial
purposes as long as full attribution to this work is given.
Any queries on rights and licenses, including subsidiary rights, should be addressed to World Bank
Publications, The World Bank Group, 1818 H Street NW, Washington, DC 20433, USA; fax: 202-522-
2625; e-mail: pubrights@worldbank.org.
Cover photo: © Ingrid Nelson. Further permission required for reuse.
Cover design: © Ingrid Nelson. Further permission required for reuse.
[page 5]
TABLE OF CONTENTS
ACKNOWLEDGEMENTS i
ABBREVIATIONS ii
OVERVIEW 1
“We are like a reed; we bend but we don’t break” 2
Urbanization in Haiti: Unserviced cities growing in a fragile and risky 3
environment
Planning: A shift toward resilient urban planning is needed to address current S
infrastructure deficits and prepare for future urban growth
Connecting: Better within-city connectivity and accessibility are achievable through 8
improved motorized transport and enhanced coordination between land use and trans-
port investments
Financing: Strengthening municipal finances is essential to close the urban infra- 12
structure and services gap, and to accommodate the growing urban population
“Live today, but think about tomorrow - Wè jodi a, men sonje demen” 15
References 19
CHAPTER 1. LAYING DOWN THE FACTS ON HAITIAN URBANIZATION 23
Urbanizing while grappling with widespread fragility and disaster risk 25
Urbanizing under an unfavorable labor market and high levels of poverty 34
Urbanizing under crowding conditions and with no supporting infrastructure 40
Reviewing the challenges ahead 44
References 45
SPOTLIGHT 1: WHAT IS URBAN AND WHAT IS AT RISK 49
References 58
[page 6]
CHAPTER 2 —- MOVING FROM RECONSTRUCTION TO RESILIENT URBAN PLANNING 63
FOR A BRIGHT FUTURE
Why resilient urban planning? 63
Cities in Haïti are marked by basic service deficits and high exposure to natural 64
disaster risks
Weak land administration, inappropriate regulation and information gaps hamper 72
effective decision making and exacerbate planning challenges
Despite recent efforts, governance challenges remain a hurdle to long-term resilient 78
urban growth
Instruments that can help initiate change today, with an eye on building stepping 82
stones for tomorrow
References 94
SPOTLIGHT 2: PATTERNS OF LAND USE WITHIN CITIES 99
References 107
CHAPTER 3: SHAPING LABOR MARKETS: CONNECTIVITY, JOBS AND RISKS LL
Connectivity in Haitian urban areas 111
Urban transport in Haïti is slow and unaffordable to many 113
Structure of the urban areas of Port-au-Prince and Cap-Haïtien: Where are the people? 120
Where are the opportunities?
Fragmented labor markets - Few commuters not travelling far 129
Transport interventions that focus on speed and resilience can reduce spatial 136
mismatch
Matching people and jobs - Overcoming the challenges 142
References 149
SPOTLIGHT 3. INTER-CITY CONNECTIVITY: WHY IT ALSO MATTERS FOR HAITI'S 151
PRODUCTIVITY
References 158
CHAPTER 4: FINANCING HAITIAN CITIES 165
The process and progress of decentralization in Haiti 165
Incomplete decentralization and a weak legal framework for municipal finance con- T4
found responsibilities
[page 7]
Limited sources of municipal revenue hamper the capacity to provide services 176
Lack of transparency and limited reliability of the transfer systems exacerbate 190
financial constraints
À path to strengthening municipal finances 194
References 199
ANNEXES 201
[page 8]
[page 9]
ACKNOWLEDGEMENTS
The Haiti Urbanization Review was prepared by a team led by Nancy Lozano-Gracia (Senior
Economist GSU10-Task Team Leader), and consisting of Sarah E. Antos (IT Officer, Data and
Information Management, ITSOP), Paolo Avner (Urban Economist, GSUGL), Andrea Colombo
(Consultant, GSU10), Chandan Deuskar (Consultant), Marisa Garcia Lozano (Consultant, GSU10),
Alexandra Panman (Consultant), Jonas Ingemann Parby (Senior Urban Specialist, GSU10), Joseph
Denis (Consultant, GSU10), Claudia Soto (Disaster Risk Management Specialist, GSU10), and
Benjamin P. Stewart (Geographer, GGSCE). Claudia P. Pacheco Florez (Program Assistant, GSU10)
provided overall administrative assistance. The work in Chapter 3 constitutes a collaboration between
the World Bank, Flowminder Foundation, the WorldPop Project, and Digicel Haïti. The Flowminder
team included Guilherme Augusto Zagatti, Miguel Gonzalez Canudas, Chris Brooks, Maximilian
Albert, Elisabeth zu Erbach-Schoenberg, Alessandro Sorichetta, Simon Dutka, Priya Burci, Andrew
Tatem, Erik Wetter, and Linus Bengtsson.
The team is grateful for peer review input from Roger Gorham (Transport Economist, GTIo4),
Augustin Maria (Senior Urban Development Specialist, GSU11), and Michel Matera (Senior Urban
Specialist, GSU13).
Additional contributions were provided by Roland À, Bradshaw (Senior Disaster Risk Manage-
ment Specialist, GSU10), Lauren Nicole Dauphin (Consultant, GGSCE), Katie L. McWilliams
(IT Officer, Data and Information Management, ITSOP), Emilie Perge (Economist, GPVo4),
and Franck Taillandier (Senior Urban Transport Specialist, GTIo8). The team benefited from
the technical guidance from Catalina Marulanda (Practice Manager GSU12) and Pierre Xavier
Bonneau (Program Lead LCC8C). Valuable comments and guidance were provided by Judy Baker
(Lead Urban Economist, GSU10), Trevor Monroe (Senior Operations Officer, GTKM1), and Raju
Singh (Program Lead LCCS8C. The report was prepared under the overall guidance of Ming Zhang
(Practice Manager, GSU10). The team also recognizes the support of the Country Director for Haiti,
Mary À. Barton-Dock.
The overview was edited by Communications Development Incorporated, and editorial
support for the entire report was provided by Jean-Dany Joachim. The books design is credited
to Ingrid Nelson.
The policy discussion in this report has benefited from discussions with high-level government
officials and development partners including representatives from: Comite Interministeriel d’Ame-
negament du Territoire (CIAT), Centre National de l'Information Géo-Spatiale (CNIGS), Institut
Haïtien de Statistique et Informatique (IHSD), Ministère de l’Intérieur et des Collectivités Territori-
ales (MICT), Ministère de la Planification et de la Cooperation Externe (MPCE), and Ministère des
i
[page 10]
Travaux Publics, Transports et Communications (MTPTC). Special thanks go to Michèle Oriol and
Rose-May Guignard from CIAT for their overall guidance and contribution to this work.
The work in this report has been made possible thanks to the financial contribution from three
grants: support from the Global Facility for Disaster Reduction and Recovery (GFDRR) TF0A2693;
a grant from the World Banks Jobs Umbrella Trust Fund, which is supported by the Department for
International Development/UK AID, and the governments of Norway, Germany, and Austria, the
Austrian Development Agency, and Swedish Development Agency SIDA, TF0oA2893; and a grant
from the Innovations in Big Data Analytics program, under the Global Data and Text Analytics
Operations unit in the Global Themes Vice Presidency of the World Bank.
ii
[page 11]
ABBREVIATIONS
ASEC Assemblée de la Section Communale
(Communal Section Assembly)
CAP Cap-Haïtien
CASEC Conseil d'Administration de la Section Communale
(Communal Council)
CDD Community-Driven Development
CFPB Contribution Foncière des Propriétés Bâties
(Tax on built properties)
CIAT Comité Interministeriel d'Aménagement du Territoire
(nter-Ministerial Committee for Territorial Development)
CNIGS Centre National de l'Information Géo-Spatiale
(National Center for Geospatial Information)
DGI Direction Générale des Impôts (General Tax Office)
DHS Demographic Health Surveys
DINEPA Direction Nationale de l'Eau Potable et de l’Assainissement (National
Drinking Water and Sanitation Directorate)
DRM Disaster Risk Management
EC European Commission
ECLAC Economic Commission for Latin America and the Caribbean
ECVH Enquête sur les conditions de vie en Haïti
(Survey of living conditions in Haiti)
ECVMAS Enquête sur les Conditions de Vie des Ménages Après Seisme (Survey of
households’ living conditions in Haiti)
EDH Electricité d’Haîiti (Electricity of Haiti)
FGDCT Le Fonds de gestion et de développement des collectivités territoriales
(Local Government Development Fund)
FY Fiscal Year
GDP Gross Domestic Product
GHSL Global Human Settlements Layer
GUF Global Urban Footprints
GVA Gross Value Added
HTG Haitian Gourde (currency)
IADB Inter-American Development Bank
ii
[page 12]
IHSI Institut Haîtien de Statistique et Informatique (Haitian Institute of
Statistics and Information)
IMF International Monetary Fund
ILO International Labor Organization
JRC Joint Research Centre
LAC Latin America and the Caribbean
MARNDR Ministère de l'Agriculture, des Ressources Naturelles et du Dévelopment
Rurale (Ministry of Agriculture, of Natural Resources, and Rural
Development)
MDE Ministère de l'Environnement (Ministry of Environment)
MEF Ministère de l'Economie et des Finances
(Ministry of Economy and Finance)
MSPP Ministère de la Santé Publique et de la Population
(Ministry of Health)
MICT Ministère de l'Intérieur et des Collectivités Territoriales (Ministry of
Interior and Local Authorities)
MECE Ministère de la Planification et de la Cooperation Externe (Ministry of
Planning and External Cooperation)
MTPTC Ministère des Travaux Publics, Transports et Communications
(Ministry of Public Works, Transport and Communications)
ONACA Office National du Cadastre
(National Agency for Cadastre and Land Registration)
PaP Port-au-Prince
PDNA Post-Disaster Needs Assessment
PEM Public Financial Management
PRAFIPUM Programme d’Amélioration des Finances Publiques Municipales
(Program for the Improvement of Municipal Public Finance)
UN WUP United Nations World Urbanization Prospects
USAID United States Agency for International Development
USD United States Dollars
WDI World Development Indicators
WHO World Health Organization
iv
[page 13]
[page 14]
[page 15]
« «
 Se —. Sales et < hr À 7
a en EVE EN Se.
FE ER RE ON PE GT RE ES RSR EVER TS
ES Le ee Loue di $ CES = Ÿ- DL 2% EE. - UE
s” Fr = Ex NS Le er et = Le d ss ; ans
— As ° © ra AE Es A, : > # ° 54 “à mn + De,
LEE 7 Te MTS VE. * Si. 2 A PShe
FV A APE er = se + TF4, oies an
Pi RCA RSS ÉRR
tn, a De : ee N 2 Fe '
£, d'à TŸ A7 L ' ° n .
dre RNA 4 Ex * * 2 t ..% » r + «
F'AdE à Lara À «ire, i-. LR \ 4, NA
ER: OR MERS à SR DT eu LS
«1530 NS \ : 72 es À , 0 ‘ 4 x Tes Fe ñ Ês.4
e 34. s " 112 * #8 k * pe ‘ s À # 52 & RES PE
\$ FR Ses TORRES > 2 AT » FRE ANSE
, 41 pl v D > 7 À y, 18 VIA Ph + >, * L 8 42 LR
EN ue PERS PS, 22. y FR | Va. » me pe dt ARTE $
V'EET 5 Fe GA US ER, CERN S 5? em, DRE À w, Er EME Xe
RS AN ENS 2 XONE ARE: © AMOR L 2 MR TU à 0 Qt
[page 16]
NORTHERN PART OF-CAP-HAÏTIEN, NORD:
PHOTOGRAPHED BY:REMI KAUP, 2006
SOURCE: WIKIMEDIA, CREATIVE COMMONS:LICENSE:
[page 17]
Today, more than half of Haïti’s population calls cities and towns their home, in a major shift
from the 19505 when around 90 percent of Haitians lived in the countryside. Urbanization is usually
paired with economic growth, increased productivity, and higher living standards, but in Haiti it
has taken a different course. Potential benefits have been overshadowed by immense challenges,
all of which require immediate action.
To better understand the factors that constrain the sustainable and inclusive development of
Haitian cities, this Urbanization Review organizes the challenges along three dimensions of urban
development: planning, connecting, and financing. Planning reviews the challenges in supporting
resilient growth to create economically vibrant, environmentally sustainable, and livable cities.
Connecting focuses on the obstacles of physically linking people to jobs and businesses to markets,
while financing focuses on identifying the key capital, governance, and institutional constraints
that are hurdles to successful planning and connecting. Along these lines, the analysis suggests
three main challenges for Haïtian cities:
PLANNING: Resilient urban growth is hindered by wide gaps in basic services, increasing exposure
to natural disasters, and ineffective land use planning.
CONNECTING: Poor connectivity within Haitian cities hampers integrated labor markets and access
to economic opportunities.
FINANCING: The ability of local governments to plan, service, and connect cities and towns is
heavily constrained by limited resources at the municipal level.
To respond to these challenges, the Urbanization Review proposes three broad strategies (encap-
sulated in the Summary Matrix, Table O.1):
PLANNING: À shift toward resilient urban planning is needed to address current infrastructure
deficits and prepare for future urban growth. This includes investing in basic service deficits, lever-
aging information for decision making, and strengthening property rights.
1
[page 18]
CONNECTING: Better within-city connectivity and accessibility are achievable through improved
motorized transport and enhanced coordination between land use and transport investments.
This entails investing in and improving efficiency, increasing affordability, and strengthening
coordination of land use and transport investments.
FINANCING: Strengthening municipal finances is essential to close the urban infrastructure and
services gap, and to accommodate the growing urban population. This requires consolidating,
harmonizing, and enforcing existing frameworks; building capacity and expanding financial
opportunities; and expanding and leveraging the local revenue base.
“WE ARE LIKE À REED; WE BEND, BUT WE DON'T BREAK"
Proverbs are integral components of Haitian culture and speech. Along with metaphors, imagery,
and storytelling, they are a traditional form of communication used to pass down knowledge and
wisdom from one generation to another. Though the findings and messages of the Urbanization
Review are technical, they resonate with a well-known Haitian proverb that reflects Haitians’
day-to-day struggles and hopes for a brighter future. Nou se wozo; nou plive nou pa kase—Haitian
Creole for “We are like a reed; we bend, but we don’t break.” This proverb captures Haïiti’s long
history of resilience in the face of slavery, colonialism, political oppression, widespread destruc-
tion from natural hazards, social exclusion, inequality, and poverty—all which have shaped the
country's urbanization, a process that determines its current challenges to development, but most
importantly, the opportunities that lie ahead.
Historically, fragility* in Haiti has been driven by political violence and instability (World Bank
2015b).? Such instability has weakened state institutions, the rule oflaw, and the investment climate,
leading to violence and distrust in public authorities (Singh and Barton-Dock 2015). Despite some
improvements in governance indicators, the country ranks the lowest in Latin America and the
Caribbean (LAC) in control of corruption.
While Haitis fragility can be traced to the Duvalier regime (1957-1986), subsequent political
and institutional instability have exacerbated volatility in the country’s recent history. Between
1986 and 2014, Haïti witnessed eighteen changes of government and over twenty major cabinet
changes. In the second half of the 2oth century, factors such as faulty agricultural policies and
overexploitation of land deteriorated the rural economy and fueled a massive migration into urban
areas of peasants seeking security, opportunities, and access to services, particularly in Port-au-
Prince, the capital. But the provision of basic services did not expand to meet the new population
pressures and cities were unable to meet the demands of the incoming population.
:The World Bank Group classifies Haiti as a “fragile” state due to its low Country Policy and Institutional Assessment ratings
for economic, social, and public sector polities and institutions. Broadly, fragility is defined as the weakness of institutions
and vulnerability to instability, conflict, and violence.
2In less than thirty years (1986-2014) the country was led by a succession of eighteen short-lived governments and suffered
repeated delays in elections, which led to Parliament’s dissolution in 2015.
2
[page 19]
The destructive impacts of the earthquake in 2010, coming on the heels of a devastating
hurricane season in 2008, and followed by the even more devastating Hurricane Matthew in 2016,
further depleted the resources to generate greater prosperity throughout the country, with most
efforts geared toward recovery and reconstruction.
Despite these obstacles, as the proverb says, Haitians “bend but don’t break.” While facing
political instability and immense losses from disasters, the country has also taken important
steps toward development. Key milestones on the social and economic fronts have been achieved,
including a reduction in extreme poverty and expansion of education and health services. Today,
90 percent of children attend school, and infant mortality decreased by 9 percent between 2005
and 2012. The country’s major cities are now all connected to the main road network, tourism has
increased, and access to finance—in particular micro credits—has expanded (World Bank 2015b).
There is a renewed sense of optimism for the future.
Haiti is now at a decisive point in its history, as the country shifts from a focus on reconstruction
to long-term development and forward-thinking planning. As another proverb states, We jodi a, men
sonje demen, or “Live today, but think about tomorrow.” This proverb is a manifestation of Haiti’s
culture, one that stands strong and determined to act today, with tomorrow in mind. The Haiti Urban-
ization Review aims to contribute solutions for living through the problems faced by cities today
and provide recommendations to help build the “thinking” about solutions for a better tomorrow.
URBANIZATION IN HAITI: UNSERVICED CITIES GROWING IN A FRAGILE AND RISKY
ENVIRONMENT
Around the world, urbanization has often had a positive effect on economic growth. The strong
link between urban levels and income has been well-documented. Historical data between 1996
and 2015 for over 180 countries show incomes rising as the share of population living in urban
areas increases. Densities found in cities promote productivity and offer opportunities to improve
people’s livelihoods and quality of life, eventually helping lift many out of poverty. For firms and
workers in cities, proximity makes skills matching and job searching more efficient. For govern-
ments, basic public services and infrastructure can be provided at lower cost due to economies
of scale. The relationship between urbanization and economic growth, however, is not always
linear. High densities of people alone are not enough to create the agglomeration economies
often attributed to cities. When densities are poorly managed, externalities such as congestion,
pollution, and high crime rates can overshadow the benefits of urbanization.
In Haiti, urbanization has not gone hand in hand with economic growth. Gross Domestic Product
(GDP) per capita remained stagnant and in fact dropped from USD 757 in 19963 to USD 727 in 2013,
even when urban rates increased from 33 to 58 percent. Unlike similar countries in LAC, Haïti has
not benefited from urbanization. Widespread fragility and costly natural disasters may have under-
mined the benefits of the urbanization process. À closer look at the country’s system of cities, the
deficits in urban infrastructure and services, and the limitations in governance and urban financing
at the local government level helps explain why Haïti has urbanized without economic growth.
3 At constant 2010 prices.
3
[page 20]
Since 2000, Haïti has urbanized rapidly, albeit later than many of its LAC peers. In 1950,
roughly 10 percent of the country’s population lived in urban areas, but from this decade until
the 1980s, the number of urban dwellers increased at four times the rate of the rural population.
In the 1980s, the urban population increased at a faster rate than the total population, reaching
30 percent by the mid-1990s. According to national official statistics, 52 percent of the popula-
tion in 2015 resided in urban areas. The United Nations (UN) World Urbanization Prospects put
this figure at 57 percent for the same year, with an average annual urbanization rate of 5 percent
between 2000 and 2015. In 15 years, Haiti’s urban population grew 3.6 percentage points faster
than the average Caribbean country and doubled in size from just over 3 million people to nearly
Figure O.1.
100%
* OT
CU ERERERERENEINERENENENSENER
PRE SERELISTIERERERESNENIENE
MS ERRRERERERERENEILILIEEIRENNÉ
x MHITEITITENITENIIEENETTEET
40% = = = ne OO EEE
30% |
. ERSREREE HE ù
. ERERERER [] []
” ERERERERERENENEREEREEE
EN High Density Urban EN Rural Grid UN WUP
Clusters Clusters Cells Urbanization Rate
Source: Deuskar, Stewart, and Lozano-Gracia (2016) based on WorldPop (2015), European Commission thresholds for urban
areas, and UN World Urbanization Prospects (2015).
4
[page 21]
6 million. Each year, as many as 133,000 Haitians are becoming city dwellers (World Bank 2015b).
Ten years from now, the number of urban dwellers is expected to increase by almost another 2
million people, and could surge to around 11 million by 2050, for a 76 percent urban rate.
Satellite imagery to update what is urban in Haiti suggests that the urban population may
be higher than suggested by official statistics. Definitions of urban areas in Haiti are outdated
and have used unclear criteria. To address this limitation, this report uses a different measure
of “what is urban” based on gridded population estimates and population density thresholds.
By producing an urban vs. non-urban classification at high resolution (100m x 100m cells) and
identifying urban built-up areas, the analysis suggests that Haiti has an urban population of over
6 million people, or about 64 percent of the total population —a marked difference from the 52
percent reported by official figures based on projections from the latest census. This makes Haiti
the fourth most urbanized country in LAC, just after Puerto Rico, Trinidad and Tobago, and
Mexico, instead of ranking 2oth based on the United Nations World Urbanization Prospects (UN
WUP) data (Figure O1).
PLANNING: À SHIFT TOWARD RESILIENT URBAN PLANNING IS NEEDED TO ADDRESS
CURRENT INFRASTRUCTURE DEFICITS AND PREPARE FOR FUTURE URBAN GROWTH
Haitian cities are not supported by adequate urban infrastructure and basic services, under-
mining productivity and livability. Rather than benefiting from high densities, cities in Haïti
today are overcrowded places with wide gaps in infrastructure and services. Resilient urban
growth is hindered by these gaps and by increased exposure to natural disasters, and by ineffec-
tive land use planning. As many as 35 percent of urban residents do not have access to improved
water, and the share of families with water connections inside their dwelling or with access to
a public tap fell sharply between 2000 and 2012 (respectively, from 24 to 3 percent, and from
65 to 21 percent). Two-thirds of urban residents lack improved sanitation, and an estimated 8
percent of urban residents practice open defecation. Haiti has the lowest collection rate of solid
waste services in LAC (12.4 percent), ranking far behind the next lowest country in the region,
Paraguay (57 percent), and behind low-income African countries such as Senegal, Benin, Mali,
and Ghana, with collection rates of 21, 23, 40, and 85 percent, respectively (Hoornweg and
Bhada-Tata 2012).
Cities are also growing in an uncoordinated and unregulated manner, heightening their
exposure to natural disaster risks. Haïti is one of the world's most exposed countries to multiple
natural hazards. Over 93 percent of its surface and more than 96 percent of its population are at
risk of two or more hazards (World Bank and ONPES 2014). Between 1976 and 2012, hydro-me-
teorological events cost the economy nearly 2 percent of GDP a year (World Bank 2016). The
7.3 Richter-magnitude earthquake in 2010 inflicted massive economic losses, representing 120
percent of GDP (World Bank 2015a). Built-up areas are particularly vulnerable, as they are
disproportionately concentrated in high seismic hazard zones (60 percent), and around half
are considered at risk for flooding. How urban areas expand in the country, and how buildings
and infrastructure are built, are vital when vast amounts of land are exposed to different types
of natural hazards.
5
[page 22]
Further, weak land administration, information gaps, and inappropriate regulation hamper
effective decision making and exacerbate planning challenges. Information on land is limited
and out of date, affecting the overall quality of land administration in Haiti, which scores the
lowest in LAC according to the 2017 Doing Business index. Out of 190 countries, Haiti ranks
18oth on ease of registering property and 166th on obtaining a construction permit.4 Construc-
tion permit fees represent 15 percent of the total cost of construction, far higher than the average
2.5 percent in LAC and 7.6 percent in Sub-Saharan Africa.$ Costs and time constraints are
associated with informal and unplanned development, and it is calculated that 60 percent of
Haitian households do not have any formal document of property ownership (USAID 2010).
The lack of a national land cadastre is a major obstacle to effective property rights, which are
pivotal to carrying out large-scale urban housing or infrastructure investment programs. Efforts
are underway to introduce such a cadastre, but the process is highly challenging due to the
fragmentation of the land registry system.
Governance challenges remain the overarching hurdle to long-term resilient urban growth.
Since 2010, the government has focused on reconstruction activities. Recently, however, it is
undertaking a broader effort, transitioning to comprehensive forward-looking urban planning.
The government is promoting decentralization to increase local governments’ role in urban
planning through the Strategic Development Plan of Haïti, which emphasizes territorial reform
as a gateway to achieving the country’'s development objectives. Strategic plans have been
developed to guide decision making across different levels and sectors of government. However,
their effective implementation to shape Haïiti’s urban areas faces two major constraints: plans
may exist in law, but are not implemented in practice; and, where plans are developed, there
is a gap between expectations set out by the plans and the financial and technical capacity to
implement them.
Resilient urban planning is central to Haïiti’s social and economic development. Forward-
thinking planning must be embraced to steer urban growth in the direction of rising incomes
and economies of agglomeration, and away from congestion and heightened exposure to risk.
The shape and form that cities take can have real impacts on productivity and livability. Smart
and targeted investments are needed to reap the benefits of urbanization and control the associ-
ated economic, social, and environmental costs that it may bring. Planning for resilient devel-
opment is about supporting coordinated action to help shape urban growth so that it supports a
country’s (and its cities’) development objectives, while managing natural disaster risk to protect
hard-won advances in living conditions. As the pressure of urban population growth intensifies,
laying the foundations for cities to work through better planning will be required.
The shift toward resilient urban planning requires actions in the following three areas to
address current infrastructure deficits and prepare for urban growth.
4 Refer to the “Doing Business 2017 - Equal Opportunity for All” report to see how Haïti ranks in other indicators that shed light
on the country’s business environment.
5 In less than thirty years (1986-2014) the country was led by a succession of eighteen short-lived governments and suffered
repeated delays in elections, which led to Parliament's dissolution in 2015.
6
[page 23]
Invest to address the basic service deficits
Big gaps in urban services such as water, sanitation, and solid waste collection call for
large investments immediately. In the short term, Haïti can invest in basic services by lever-
aging community engagement and by improving service management and delivery through
local government capacity building. Community engagement and participatory approaches
are key to successfully upgrade access to services in areas where development has taken place
in an unregulated manner, as they are linked to improved confidence in government and
long-term sustainability of urban development. Haiti’s experience in community-driven devel-
opment (CDD) projects attests to their potential, but their design could be improved to better
address particular urban challenges such as high levels of violence, criminal activity, and social
exclusion. In the near future, the government can consolidate basic service delivery by building
on “what works”; in other words, improvements in basic services can be viewed as a ladder by
which each modernization effort builds capacity and paves way for new and more advanced
initiatives led by local governments. The national government can help build capacity and
improve local service provision by providing the right incentives (such as grants, subsidies,
or transfers to municipalities based on specific outcomes or performance in service delivery).
Leverage information to facilitate coordinated decision making
To manage unregulated growth and minimize the risk exposure of Haitian cities, households,
firms, and local governments need to be provided with relevant land use planning and risk infor-
mation. Specifically, resilient planning in cities can be achieved by disseminating risk analysis
insights to support decision making, placing trunk infrastructure for basic services ahead of devel-
opment, and integrating hazard risk knowledge into transparent urban infrastructure investment
decision making. Information on risk in urban areas must be made publicly available to support
non-structural measures for protecting people from risk, such as emergency planning and infor-
mation-based campaigns to encourage flood risk mitigating behavior. Following the 2010 earth-
quake, Haïti developed tools to strengthen disaster risk management information in planning,
such as multi-hazard risk assessments, seismic zonation mapping, and location of exposed assets.
Technological innovation can provide new opportunities to engage citizens and disseminate infor-
mation on risks. In Tanzania, unmanned aerial vehicles —drones—were used to map floodplains in
Dar es Salaam, the country’s largest city. The information was used to plan and predict how water
would move in the event of a flood. This cost-effective approach could be considered in Haïti.
It is a more expensive and complicated task to provide basic services to unplanned areas
than it is to put in place trunk infrastructure ahead of development. Planning ahead will save
financial resources. Although plans can be an effective tool in anticipating urban growth, local
actors sometimes lack the funds or incentives to implement the decisions. In this case, simple,
disseminated plans can be highly effective in guiding new development. Compliance with plans
can be encouraged by making clear and credible information available to households and firms
so that they can make better, informed decisions. Such is the case of Tunis, Tunisia where, rather
than restricting urban expansion into unplanned areas, households were provided with clear infor-
mation on future infrastructure expansion plans, which helped to secure rights of way for future
7
[page 24]
investment (World Bank 2014). To minimize risk exposure, important win-wins could be achieved
by integrating flood risk management with broader development objectives, such as in the northern
corridor. The north and northeast areas of Haïti experience population growth pressures, deficits
of basic services and transportation, and significant flood risk. Inaction in these places will lead to
increasing numbers of people at risk.
Strengthen property rights and promote institutional reform for improved governance
Resilient planning is a long-term effort that demandés institutional reform and strengthening,
but stepping stones can be put down today. The government can begin with specific actions,
including strengthening property rights with dispute-resolution mechanisms and promoting
municipal cooperation in Haïiti’s largest cities. The establishment of a single and accurate record
of land ownership is vital for resilient development, but there are many challenges to cadastral
reform and the establishment of an effective land registration system. In Haïti, legal uncertainty
over property rights stands out as one of the main hurdles, and any effort to establish formal land
titles depends on the broader institutional structure for property rights. Initial efforts, however,
can be made by strengthening alternative dispute-resolution mechanisms to help solve the
backlog of unresolved property rights disputes, which may facilitate the creation of an official land
registry. Also, building frameworks for municipal cooperation becomes increasingly important in
light of Haitïs continued progress toward political and fiscal decentralization. Effective service
provision is a priority for institutional reform, yet coordination across municipal, and even
departmental, boundaries is necessary to avoid duplication of activities or contradictions in
policies. This can be achieved by developing coordination frameworks to promote cooperation.
CONNECTING: BETTER WITHIN-CITY CONNECTIVITY AND ACCESSIBILITY ARE ACHIEVABLE
THROUGH IMPROVED MOTORIZED TRANSPORT AND ENHANCED COORDINATION BETWEEN
LAND USE AND TRANSPORT INVESTMENTS
Today, poor connectivity within Haitian cities hampers integrated labor markets and access to
economic opportunities. Accounting for within-country variation, accessibility to economic oppor-
tunities in Haitian cities is poor. Public transport in urban areas is unaffordable to many, limiting
their access to economic opportunities, especially among the poorest households.$ Tap-Taps are the
most widely used form of public transportation in Port-au-Prince, covering 56 percent of the market.7
Although regulated by the Ministry of Social Affairs, Tap-Tap fares are unaffordable to many poor
households. Based on current fare costs, if a Tap-Tap journey was repeated twice a day, five days
a week, transport expenditures would represent anything between 25 and 73 percent of per capita
expenditures in the lowest quintile. The proportion of households that spent nothing on transport
in 2011-2012 Was 57.1 percent, according to the Haïitian Household Expenditure Survey (IHSI 2012),
meaning that just under 60 percent of households used no motorized transport whatsoever. Haiti is
“Most information on urban transport patterns in the metropolitan area of Port-au-Prince was extracted from a report “Urban
Transport in Port-au-Prince” prepared by Kopp and Prud’homme (2011) for the Inter-American Development Bank.
Tap-Taps are converted pick-ups often imported from the United States and Canada, and can seat 10-14 people but often
accommodate up to 20. These informal minibuses are the dominant collective transport service in urban areas.
8
[page 25]
Figure O.2.
Commuters as Percentage of Population
Work Locations Port-au-Prince Home Locations
RS TS
7 4 … ] Fr - 75.00%
i PE {
Î i EE
! à ; si > nl 64.29% £
l | =
+ Fe # Ls3.57%
Ci | , ( L 42.86% ©
4 | £ £
: &
1 - 32.14%
: F2 F2
. … ; ÿ
&
- 21.43% ©
“ - 10.71%
Source: Authors’ elaboration using Digicel data.
in the process of eliminating subsidies on fuel prices, which could worsen the affordability of public
transport without compensatory measures. Though well-intended, because they are highly regres-
sive, the removal of these subsidies may result in higher costs to Tap-Tap owners if they must absorb
the fuel cost increases. Any increase in transport fares intended to offset extra costs would exacer-
bate the unaffordability and further exclude the poor from accessing economic opportunities.
This report is the first to use mobile phone call records to understand commuting patterns and the
degree of spatial mismatch between jobs and homes in Haïti. À good understanding of how workers
move in and around the largest cities, where the job centers are and how accessible they are for
different segments of Haitian urban society, and what the most critical road segments are to ensure
that job accessibility not be affected by a disaster, can provide valuable information for evidence-
based decision making. Absent up-to-date censuses and travel surveys, accessibility to opportuni-
ties in Haitian cities was measured using mobile phone data. Call data records$ were utilized to
track locations of users throughout the day, and even at night. This information was plotted into
maps, which showed where jobs were geographically concentrated in the two main urban centers of
Port-au-Prince (Figure O.2) and Cap-Haïtien. The overall picture is one of concentration toward the
city center during daytime, where most jobs are located, and inversely one of diffusion toward the
outskirts during the evening.
8 Digicel, the main mobile phone subscription provider in Haiti (with close to 80 percent of the market), granted the team
access to a sample of de-identified call records. This technique was used to overcome data scarcity in Haïti.
9
[page 26]
An analysis of commuting patterns shows that labor markets are fragmented in Haïti. Port-au-
Prince and Cap-Haïtien suffer from low employment accessibility as measured by commuting
patterns. Data show that only a small share of people in both cities travel to work and the distances
traveled by these commuters are short. Only 42 and 40 percent of the population are considered
commuters in Port-au-Prince and Cap-Haïtien, respectively, traveling beyond their home cluster
(1km radius). These patterns are indicative of local job matching, meaning that access to a large
array of economic opportunities is low. While short commutes are not negative in themselves, they
may reflect the difficulty and unaffordability of traveling.
Motorized travel is slow and lengthy in Port-au-Prince, mainly due to a combination of lack
of road infrastructure, poor road maintenance, and suboptimal use of public street space. Based
on travel logs of various vehicles, speeds in Port-au-Prince are as low as 10.9km/hour on average.
Public transport travels at slower speeds, with Tap-Tap users reporting an average on-board
travel time of 44 minutes for an average commute distance of 5.9km, suggesting average speeds
for Tap-Taps of 8km/hour. Part of the problem is lack of road space, but Kopp and Prud’homme
(2011) argue that congestion can mainly be attributed to the suboptimal use of street space and
poor road maintenance. Encroachment of the public realm occurs when sidewalks are used by
merchants for commercial purposes, forcing pedestrians to walk in the traffic lane. In addition
to pedestrians’ use of roads, road space is also compromised by parked vehicles. Together,
these factors lead to considerable loss of speed and heightened safety risks for pedestrians.
Cities should become integrated labor markets that provide opportunities to residents,
allowing them to choose jobs from larger pools and thus leading to increased welfare (Bertaud
2014). Integrated labor markets exist when it is possible for an individual to reach a large share
of the employment opportunities within a city at a reasonable cost or within a reasonable period.
Large and integrated labor markets support improved matching by increasing the number and
diversity of employers and job seekers, which makes the best of their skills and aspirations. When
access is good, firms also benefit from the proximity to product and labor markets that the density
of cities allows. Conversely, when accessibility is limited the likelihood of finding a good match is
smaller, because firms and households must select from a smaller pool of workers and employment
options. Jobs outside high-density economic clusters tend be scarcer, more informal, and lower
paying. Low accessibility levels also pressure families to locate closer to jobs, which can turn out to
be a disadvantage given that land and housing are more expensive, in turn forcing these families
to live in basic conditions and fueling the growth of central slums found, for example, in many
African cities (Antos, Lozano-Gracia, and Lall 2016).
Connectivity and accessibility are necessary—but not sufficient—conditions to achieve
efficient urban labor markets. Creating jobs and achieving efficient labor markets demand a
multidimensional solution to overcome many obstacles, ranging from the lack of a financial and
banking system to create businesses, to low education levels, and a costly regulatory framework.
Improving accessibility will not solve all these issues, but failing to address urban accessibility
will impede progress in productivity and livability.
To address connectivity challenges in Haïitian cities, actions along the following three lines
are essential.
10
[page 27]
Improve travel speeds and quality of service through more investments and enhanced efficiency
in urban areas
There are various avenues to increase speeds for motorized transport in urban areas, which could
improve accessibility and help cities become better matchmakers. Investing heavily in roads and public
transport is certainly a way to do this, although such an option would require large financial resources
and is unlikely to be very effective before the chronic challenges on the current network are addressed.
Therefore, a more immediate solution is to focus first on improving the operation and maintenance of
the current network. These two options are not mutually exclusive, but the most effective sequencing
would be to start by improving the current network. Less expensive alternatives, such as improved
traffic management, road space allocation, and road maintenance can yield significant results.
Improving road space requires freeing up road lanes for circulation rather than to accommodate street
parking or pedestrians. At the same time, sidewalks must prioritize pedestrian mobility over street
vendor activity? and ensure comfort and safety of those commuting by foot. Road maintenance—
repairing potholes and uneven road surfaces—can save vehicle maintenance costs and travel time. A
first step would be to replenish Haitis existing road maintenance fund. In the longer term, collective
transport lanes could be a promising approach to reduce travel times in urban areas.
Increase the affordability of collective transport for inclusive matching of opportunities
Reductions in operating costs could help lower transport fees and improve affordability, via several
means. First is to increase speeds on the road network, through interventions on the network and by
rationalized Tap-Tap routes to allow Tap-Tap drivers to complete more round trips in a given time.
This option would increase the revenues and margins of Tap-Tap operators and could lead to lower
fares, and is the most promising.
Another approach would be making Tap-Tap vehicles - often operated for more than 25 years
(Kopp and Prud’homme 2011) - more fuel efficient to lower the volume of fuel required. Public
interventions to scrap old, fuel-inefficient, informal minibuses and subsidize the purchase of more
efficient vehicles were adopted in Senegal and the Dominican Republic, and the lessons learned
from these experiences could help in Haiti. The urban area of Dakar (Senegal), for example, created
incentives for informal car rapide (minibus) operators to buy more fuel-efficient minibuses from
2003 to 2008, providing subsidized loans that covered around 75 percent of the purchase cost of the
vehicle (Kumar and Diou 2010). In exchange, car rapide owners had to retire their old vehicle and
formalize their activities. Using the lessons from Senegal, a suitable model for the Haïitian context
could be designed, such that it can be negotiated with local operators.
An ongoing technical assistance of the World Bank is exploring different mechanisms to offset
fuel-cost increases, and the results will inform whether scrapping old Tap-Tap vehicles is a viable
option. In the longer term, carefully targeted transport subsidies could be directed toward the poorest
households to ensure they obtain or retain access to opportunities.
° Digicel, the main mobile phone subscription provider in Haiti (with close to 80 percent of the market), granted the team
access to a sample of de-identified call records. This technique was used to overcome data scarcity in Haïti.
11
[page 28]
Strengthen coordination of land use and transport investments for improved access and
increased resilience
Interventions aimed at coordinating land use and transport reduce the disconnect between
residential areas and employment opportunities and help build resilience in the wake of natural
hazards. Two main ways of improving accessibility to opportunities in urban areas have been
identified: increasing speeds and reducing distances. The first calls for investing in the connective
network and making motorized transport more affordable, while the second entails reducing the
fragmentation of the urban footprint by incentivizing density of people and opportunities and
better integrating land use and transport. At present, population densities in Port-au-Prince and
Cap-Haïtien are high, so there is limited room to reduce the distance between people and economic
opportunities by increasing densities further. However, modifying the spatial layout to encourage
land use clustering can increase accessibility within a given period. There is also considerable
room to advance accessibility by planning for urban expansion while reducing exposure to natural
hazards. Both cities show examples of urban development, either in safer but poorly connected
areas or closer to economic opportunities but in riskier locations. It is important to avoid these
trade-offs and carry out investments that prioritize both measures.
À first step in building a strategy for increased resilience against natural disasters is under-
standing which road sections are the most critical links in the network. Based on a criti-
cality analysis, the most urgent road segments for intervention in Port-Au-Prince’s network
are the Route Nationale 2 that connects downtown to Carrefour and beyond to the west,
RN1 connecting the downtown and north areas of the capital, an isolated link between
downtown and Pétionville, and a couple of links connecting Canaan to the rest of the network.
FINANCING: STRENGTHENING MUNICIPAL FINANCES IS ESSENTIAL TO CLOSE THE URBAN
INFRASTRUCTURE AND SERVICES GAP, AND TO ACCOMMODATE THE GROWING URBAN
POPULATION
Given its current rapid urbanization, Haiti faces big challenges in strengthening public finances.
Today, the ability of local governments to plan, service, and connect cities and towns is heavily
constrained by limited resources at the municipal level. Over the past two decades, the gap between
the funding capacity of Haiti and the pace of urban growth has led to a constant deficit of urban
infrastructure and services in cities and towns. The progressive decline of international aid further
widens the funding gap. According to World Bank (2016), Haiti faces critical challenges, including
adapting to financial reductions, raising more revenue internally, and making better use of existing
funds. Despite improvements in the country’s fiscal revenue, from less than 10 percent of GDP in
2004 to 12.6 percent of GDP in 2014, Haiti remains the poorest performer in revenue mobilization in
LAC (World Bank 2016). This greatly hinders the country’s ability to carry out much-needed devel-
opment spending in infrastructure, health, education, and other key sectors. As cities expand in size
and population, the challenge to finance sustainable and inclusive urban development grows.
Municipal governments are unable to provide adequate infrastructure and services due to incom-
plete decentralization and a weak legal framework for municipal finance. The Constitution of
1987 (including the 2012 amendment) and the Presidential decrees of 2006 establish the fiscal and
12
[page 29]
financial autonomy of communes, the decentralization of public services provision, and the institu-
tionalization of municipal revenue. But while the decentralization framework is in place, effective
devolution of key expenditure and revenue functions to municipal governments has not yet taken
place. À fragmented municipal finance framework hampers the ability of local governments to raise
revenue to finance service provision. Thus improving local government capacity for public financial
management remains key to successful devolution of responsibilities to communes and to effective
fiscal decentralization. Only 0.6 percent of GDP is currently spent at the communal level, and total
municipal revenue makes up only 1.7 percent of total revenue. It is important to address the inconsis-
tencies in devolution and decentralization so that function follows finance.
Limited and unpredictable sources of municipal revenue undermine capacity for planning,
budgeting, and delivery of much-needed services in urban areas. Local governments have four
main sources of revenue: transfers from the central government; taxes collected on behalf of the
communes by the General Tax Office (DGI); duties and royalties collected by the communes; and
other external sources (such as development partners). However, local governments are dispro-
portionately dependent on national transfers, mainly the Local Government Development Fund
(FGDCT). Except for Port-au-Prince, Pétionville, and Delmas, it is the main source of income for
communes, typically ranging between 80 and 95 percent. The transfer system, however, lacks trans-
parency and is unreliable. Only half of the funds designated for the communes are transferred,
and a significant share is transferred to inactive or nonexistent structures. Additionally, national
transfers reduce the incentives for improving public financial management in local governments,
as these are neither linked to improved performance in service delivery nor are they entirely needs-
based. The financial capacity of local authorities is further curtailed by their limited tax collection
capacity. Municipalities often only collect a fraction of their revenue potential. Own-source revenue
is highly concentrated in major cities, with the five communes of the Port-au-Prince metropolitan
area collecting 80 percent of all Haitian communes’ own resources.
Better planning, connecting, and servicing cities and towns in Haiti require substantial inter-
vention to review, revise, and scale their financing arrangements. Enhancing transparency in fiscal
transfers, developing more dynamic sources of local revenue, and strengthening municipal finances
are crucial steps in guiding urban growth away from crowding and toward healthy and productive
densities. Present levels of resources fall extremely short of current demand for services. There is an
urgent need to improve the volume, predictability, timeliness, and management of finances, and to
identify additional mechanisms for generating own-source revenue. This requires a systematic effort
to adjust and implement reforms aimed at improving national and local government management
and the oversight of resources. Since May 2014, the government has developed a comprehensive
public financial management reform strategy and action plan aimed at ensuring a financial system
that promotes transparency, accountability, fiscal discipline, and efficiency in using and managing
public resources by growing revenue from taxes and tariffs, thus increasing local government
autonomy. However, limited progress has been made to date.
The following paragraphs highlight the key actions needed to strengthen municipalities’ finances
and their capacity to provide much-needed local services.
13
[page 30]
Consolidate, harmonize, and enforce the legal and regulatory framework for municipal
Jfinancing
Policy options should first focus on fixing the gaps in the institutional, regulatory, and financing
framework for local governments. Haïiti’s urban development is taking place in a context of incom-
plete decentralization and an unclear legal framework for municipal financing. A regulatory
framework that provides clarity of roles and resources is crucial for effective decentralization. Steps
in this direction include reviewing the normative framework of municipalities, as stated in the
decrees of 2006, and identifying actions for implementation; formalizing the taxation functions and
responsibilities of municipal governments; and reviewing legislation and regulations, particularly
those related to property tax and business tax. Together, these actions seek to clarify the respon-
sibilities, systems, incentives, and accountability relationships for the financing and delivery of
services, and the capacity of local governments to manage and allocate increased funding. Recent
reform work has opened the door to opportunities to deepen decentralization efforts. À draft law
on the financial autonomy of communes and communal sections is on the legislative agenda.
Strengthen the system for municipal finance to build capacity and accountability, and expand
financial opportunities
À stronger municipal financial system is needed to increase the financial autonomy of local govern-
ments. As mentioned, cities are heavily constrained by limited revenue sources and are highly reliant
on transfers from the national government. The solution may differ between small and large cities. For
smaller cities, efforts can be focused on enhancing the management, oversight, and transparency of
the FGDCT, including fund mobilization, allocation, transfer, expenditures, and accounting, and using
the fund as an opportunity to build local capacity for implementation. Larger cities, on the other hand,
must prioritize building capacity for own-resource revenue collection, management, and spending.
Expand and leverage the local revenue base
Municipalities need more revenue autonomy through access to strong and broader sources of local
revenue. The financing system in place is not working to the advantage of local governments: not only
are revenue levels too low to meet the demand of public services and infrastructure, but the options
to increase revenue are flawed and leave little room for accessing adequate financial resources. For
municipalities to generate and collect own-source revenue, efforts must be geared toward strength-
ening the planning and budgeting capacity of municipalities, including forecasting of revenue. To
improve the financial management capacity of local governments, the Ministry of Economy and
Finance (MEF) and the Ministry of Interior and Local Authorities (MICT) could develop a local
government public financial management manual, which sets the basic standards and procedures
in budgeting, accounting, reporting, procurement, and audit. This improvement could be achieved
through capacity-building programs that focus on four main areas: strengthening the administrative
capacity of the municipal financial units; strengthening the capacity of municipalities in project
management for timely disbursements of FGDCT funds allocated to them; increasing municipality
revenue mobilization capacity including enhancing technical competencies of staff; and providing
municipalities with incentives to explore alternative financing mechanisms.
14
[page 31]
“LIVE TODAY, BUT THINK ABOUT TOMORROW" (WÈË JODI A, MEN SONJE DEMEN)
The challenges discussed in this report need action today. But, as the proverb says, policymakers
need to think about tomorrow. Not everything can happen today, so defining what must take place
now and how that will open the way for much-needed changes is essential.
Table O.1 summarizes policy recommendations and puts forward specific actions that can be
taken in the short, medium, and long terms, distinguishing between high-, medium-, and low-pri-
ority actions, as well as identifying the institutions leading the actions. Most actions require the
engagement of more than one institution, thus underscoring the importance of collaborative
efforts in achieving urban development that benefits all.
15
[page 32]
=
<
I
Z
FH
F
Ë É
Z ES
Ÿ 5€ -
cm
< Œ ô
Z SÉ 28
" - È LS a
. È 2p8 8
= a
< S QE2 LE Re
Ÿ S CÉE S£ 0 à
Z È ZE o D Ë ©
£ £ ® u (s] Ô = à
œ R El Â2
F 5 S 5 © Ë see
ü 22 E 5 > () or a
Z ET 5 à Ë S&S ka À
ER L a ÈE 3 O oO
Z E © œ er = D £
6 2: à ë Bu Se 2E
Ÿ 3 È 5 à TE 5 dE e
Ÿ œ Si WI 2 Ô S
Z = an à = < à
2 4 à = 5 | =
Z æ À Z ® 85
© = © 00
3 - > KE T SE
> - U à re Z
… & Z 8 +2 =
un 4 £ Z sS F nu
Z © S Lu o
© 5 EË 4 : u 3
Ê œ EE 5 un
© 5 S & $
< 2 . 8 —
Ê 5 $ Z Ë =
Z m 2 ÿ ë œ Z
lu Z @ & a a 6 2
Z Ë Eh ë SE =
£ a > À dE L °
© Z ss 52 ÿ 5
ü = $ RÉ 2 è
Fe a È EE PE . 2
[2 J àÈ BD SÉS Et © un
& ÿ 3 É3E EE a 3
ÿ _ = $ Pas ee PE : |
J È gÈs 505 LE 2 =
© F = D © à ë 286 ES
8 ë à È =: LE AE Be EE |
° £ © bas PE SES iQ £
LL 4 I © DS E ei 252 22 ê .
© — FE LS F 2 E à Se & & =
U Ÿ £e ss ü CA 2x 5 E:
x 2 S £ EE Ê DE FER LÉ 8 S
= È < SvE EE Eu è 2 « È -
& 1 è U EE CEE 2 #9 Se SE a} ©
E ñ Ë mr SEÈ se BHE LE E L 5 o ©
< El cn] 2 Ë DES Sa3E Fe Bo 5 5 © 5] £
5 3 2 © ü ÉÈÉ SSÈE SE2 sg DE £ a E
$ 9 5 a S Ég CRE Ég &8 à FE 8 |$ 2
7 = 8 à wi CE FFE 53 PAS ÈE 5 | ë
& A œ 5 558 FE ga © z à 3 = Ê
3 eo Le] ro En 8 8 S2s ce] =] El
5 > 5 - BÉE EVE FE CE ÊÈ 2 s |
ii Z ë& = £È ie SU sé8 DE 2 [2 =
- = 8 + Ë RE ÊRE 529 8e z 2 |
2? > Es ÉSos ÉFEE SS8 ÊSE £ Ÿ CE 2
mn E 2 S Zz DS ÉÉFE FE SÈS FE É É ne
œ & Z Ë © 8 ÉPFÉ EE 32 S ÿ pa Ë
© cl > È fs 8.2 S25 Ê2s 2% FE LE 30
= el © = El LE 5e EG TE ÉË gs il
ë 2 $ 4 _ 35 ” EE 5 8 5 5É 2 à a
ps S Z 0% 33 EEE LS CE o à
€ ui 52e a CE 3£ 5 9
$ 22 ÈÉ EEE 32 “E 58
e] = D LL
ei © 5 qu EE EE EË Te
« C1 œ RE EE î |
us 5 & PE SÈES CE
ES È < EEE RE D £
583 ÊDmEÉ CE
S © 5 ÉFÉÉ EE
E = EE mé
si = AE Æ
» 9
K È3£ EE EE
iii. EE 225
JE HE 2ES
RE EEE LUE
5 SE FE dés
Es FI 6 2 ER
oui ee]
dE 8 Ê SRE
55 s ÈS ÈXE
rés soi o 8
SSS RE S
FRS FES
È TE
+. =
HI FE
Fire Ni.
EE ii.
É È Si
El si
HS
HE
HAE
He
S
RS
ER
[page 33]
ss
=
U «
24
Zz À
A £°
ë a
A :- +
8 5 5 Ô o 8
O EF 2 S
an ë *£ < :
ju < C} Ë = =: -
ie : : Ë Ê: a EE O 8
Ê É = Le) SE
Ê
É art E &
| SA ÊE É
à 3 | | |
à TE | |
5 LES | |
: 4
: a ZT | |
E = |
>= |
9 25 | :
X => 6 | | |
n È Q= | | |
& 3% E |
a S $ wa | | |
2 L< HE F
+ FIL : - |
no 5 |
ÿ IÈ )
D ve fl
= ë à |
È | |
> Ê È | ù
[a È + _ GS i
> © £ FE | |
£ EE 28 28 2 Ë de
8 à SE ra 3 £ a à ie
Lu &S HS en > £ o à s _ % de
D SE DS 25 = So Êg à = fe
Z à à à £ LE — A & 0.2 © Ë Hi
4 ÉE È 52 El 2 Ko £ £È
Z : SE 5e 54 1ÊcE SEE Îles À : Fi
È 1 Fe Æ Las v T à 5£ £ 2 SES
ñ ÿ JE 550 ut 280 L£es ss £ É Et
FE & à EE SE © s a A EE Ë o © SRE sn
ES 25 658 EX FE EE HF à 4
el ES 2 To 2v8 8 a EE Sie ÉTÉ SE de
X 2e 6 86% SSË 5 Ô LE 593% FE ÉÉ À ne
< $ 2 = D Ë S2- he 59 L'o S 8,88 8 ® PE £S25Sé
zx o à = FR a 0 ÿ 6 À ep ° D ÉE 228 ÉE ÉÉ
o © U £ go Ê-o 5 DE 855 FC BE me FE +
| HE FE S55 és RE S 0.2 PE 25 Es c'
8 = € ME FREE AE ER ET 55 |Sé Hi
8 SS o DE SEE 2e DES 508 Lie à 545 112
| : Ë 2) dE) 2)
< £S el EE S8$ ge ARE PE EEE 5% SE ss
U 5% Lu 2 6 05 0 à SELS E0T 5 o Ô o à Evo © à ne,
2 à n 4.2 SE = © R>0 LE o S à 0 à ÉT8 Ë rs
Z 3e un 2 à Ÿ à à El ce RTE S208 LES + : L :
| î al He ER PRÉ 5028 2 we de) p 4 à Ÿ Z
È à DAS Z'o à 2° Sé2s 222 SÉO 56 2 :
& SE ME 3251958 DE Rse 2288 25 584 265 à ASIN S)
Æ SES CHE > 2 Te Lei ae æ TE ÉE : He
- i É E HE So % As) TO À bb © _ ER
À à È A 0 ÉFFÉ © o % À 0 sg °re È .
| 4 SÈe FPE TI 245 208 à =
8 à A > PURE CRE SÈS Sie ;
: Zz RES ÊSE EE FE ii
& © £ 0 à ” a
È = SE L :
Ë < F5 3e + L | |
, a
Fa 2 DÉS HE 4
ë se D=0T S£ES + :
S 8 & à 2 So da <i
É HE ÉSHE ER © £ à
22 PBÉÈS Bèse 322 : :
62 a ESS 82< 253 1
S Los LE i
& à $0%5S 3Ë 2 4
D œ DÉS RÉCE 8-0 8 à £ 1
EE CÉRTE sé E .
He SHSpS ERE o © SEo
Va225 ERP : ie
5802 ÉÉFE :
® $0328 EEE |
fi RS £ S8
| 5e c 2 © 08
CRETE D :
ES 2 è SRS£E + i
SËss%S E <> S .
| :
FES È 1
RRÉTÉ Ë à 1: 1h
m] SS2SSE SE EH :
RRRSE: s à SJ LSre 2:
E] SÉSSis È € SE È 5 $ EE
QUE à SSSsS = 5 TELE
o DEEE Ÿ à ÉTÉ PS s4220
| : : FE vo * © ©
Hi 4e SiSiie E à S6 BA
5 $ SS > Sissis n ÉPFÉE
S ÈS FESSES SÉ diese
à & S SES S Ë DE
Fi:i52: Z à JE
à à SSSSS SE .
FSSES 4 .
+ £2Z
CESR É
ù [2e]
2 PÉE
2 È RONEZ
AREUG
O
[page 34]
ss
È a
È mx
A 2°
=
È vES 5 5 5 a
à JS = ERA G Ée a
F = re] Ar ® 20
= 5 = à 30 R2S col
È LE Su En OËZ JE 8 Ÿ
à ju < S B = DRE SEE À 5
È uZzZE S SSE SE E me
& a Be EE RGIKG
= O go RE 20140
5 So SR ETS) CI ÊE
è A Ô À =
© > Lo)
bo ËE 3 Ê
©
= Œ = 8
5 OZ %
8 ET = £
3 AMI ce} ©
LS] = L s A
S _
Ë Z L S 2
È s El fe
8 Z = LA 2
ë 0 3 # à
S m5 E 2
8 eZ un a 5
= io, ee rs £
= FIL s ei) g
S ne (2) = 5 ES
S Le] Q
È a 5 205
ë 2 |- Ë 2e
$ MM EAELS
un £$ © T E 554
W À LES È EP
E CS 3 d 3 s 23 r]
CE 22e 2e 2 |.8 Sia8i
Le 25 £ E S D 5 2 LS
Z à BE 0 4 5 .|2S 2.2 SES
« © 52% n EE & 9 æ À CE SES
< 52 HE EE RCE a xa [= CR) A
FE à X 0 à 3 À Ë à E ce SSAS ;2à CEE
un S 5< 0 272 5 8 go en 2 8 “ 52 BERTYS
« © a © So 5 d £ © & © _B%x LE we 5 À ESBEs
ZI À A È GIELEN ME 25 |S5 =$s lis TE Sxse
U Ë SE ER sal=T Ê 8 PRO) 5 © EEE BÉ5SSE
Z Ra > ER ES DE £ES< 0 & Es) 2 FÉÉRE
Z OS u EVE Soie NO FRS SE 0 de ES SSsés <5035
CE: Z o Ÿ 8 2.2 CE De CE of 55 SES À £s£2s
Z S v 8 D A NS FE D 20 © = MER
Z à 6 MRÉE ESS I FE 3 5 PES ER Etepeatel
Z à © FFE Ses 85 Vas ES FE BS2E Fssos
Fr S U RE SE S sslce © 2585 LE Da 2>»>r>>
À < TE S2El< ST 22 ae £ 6 sS 30 ÉBESE
ë = EE AS ÊS DE F5 352 So SSSÉ a3225
È » EE 253 |2e IE EE FE ARE . 43335
Ë ÿ SESs ÆEHES SPÈlTE RE 8 cÈFE + à 22
8 à 2482 SÉÈS Éo RÊE 0 5 SaE De 92 5% R 2 O
3 û LS20E a = 5 v © — © 2: 0 S GS mA FA RER
S RES 2% 1258) ES E 38 1252 5 sos à LS à
e 822% ERCN ER 5 "à. © SÉalise Ex ROEE S <mo ©
= À E 3 © 59 RE 2 0 202 5 ES #0 SLSsE = SEEES
8 CN PAR! & SET TG > 328$ 15 ICE 5 SS=
‘8 2 SIAP pos LAS 0 Ë E d_ #0 2
È n E 3É6 Fée 30 ÉR 6 ® S
È 2AEE 3% A aUÉS ©
F1 DT à SR Te) © À = JET à
PA g 0 E 2 © 2 an sÈE >
$ z EE SBRELES è E
2 © E ZX ER EË È ü
ps = 6 & 5 À à Ê
Ÿ k É DS. LS por
$ < DE: £
Ë a RE E8®# = sa
è SLÉS DISEA Se Q
= Z LR 9 à 2 5 ce
ë, ii SES Las RE £
5 = DRE Es ps SA &
: DE SEE 2Sés ES je.
‘8 62 ses PRE >= B6s
d Ÿ S5s2 se Li S2É£
= [2 £ = 0 4 S QE
Lu H36£ cages o © EE
= © œ Q En rsNS MST) © E à ©
È SEPE Hm3XxE z à = 0%
DE É ETS F THE
= Ê D & m £ EE
ÆE 5 5 a £ © © a ©.%
is] Poe à à ses
ëÈ 8 SEE 5 © © 208
ë 5 3 à 284
3 è £ 5 o 25e
è - SE à des
Ê è è È nu = À S£9
5 Èè RS = © LS = à E0
ë LS SS S à à z À Fos OS
a e FETES 8 À DES © © Z 850
SSSSRS S È 5 à © OÉLRE
mu EE CES Ë 5 S 2 E ? à Las
5 SES 3 © SE P à S0ÈSE
EE °°° ë £ $ CE ÈrS PS 24220
u 82 È 5 à & È S k SÉSET
= FRITES È à SEZ E Ë Sress
FÈÈRE ES ESS ZuS SRE
8 S £ 5 Ë à v à ÉRÈEE
= © Z 8 AGÉES
SES = à OT£EZ
SÈS 2 À _
ÈS < à
u © =Û
me
MÉMAGESE
[page 35]
REFERENCES
Antos, S. E., N. Lozano-Gracia, and S. V. Lall. 2016. “The Morphology of African Cities.” Policy
Research Working Paper 7911, World Bank, Washington, DC.
Bertaud, À. 2014. “Cities as Labor Markets.” Working Paper #2, Marron Institute on Cities and the
Urban Environment, New York University, New York.
Deuskar, C., B. P. Stewart, and N. Lozano-Gracia. 2016. “Defining Urban Areas in Haiti.” Working
Paper, World Bank, Washington, DC.
Hoornweg, D., and P. Bhada-Tata. 2012. “What a Waste: À Global Review of Solid Waste Manage-
ment.” Urban Development Series Knowledge Paper No. 15, World Bank, Washington, DC.
IHSI (Haitian Institute of Statistics and Informatics). 2012. Survey on the Living Conditions of
Households after Earthquakes (database). Port-au-Prince: IHSI.
Kopp, P., and R. Prud’homme. 2011. Urban Transport in Port-Au-Prince. Washington, DC:
Inter-American Development Bank. www.rprudhomme.com/resources/Rap+2011+Port+au+P
rince+$28BID$20.pdf.
Kumar, À., and C. Diou. 2010. “Renouvellement Du Parc d'autobus a Dakar : Avant - Apres.” 11.
Sub-Saharan Africa Transport Policy Program (SSATP) Discussion Paper. Washington, DC:
World Bank.
Singh, KR. J., and M. Barton-Dock. 2015. Haïti: Toward a New Narrative: Systematic Country
Diagnostic. Washington, DC: World Bank.
UN World Population Prospects. 2015. United Nations, Department of Economic and Social
Affairs, Population Division. 2015. World Population Prospects: The 2015 Revision, Key
Findings and Advance Tables. Working Paper No. ESA/P/WP.241.
USAID. (2010). Land Tenure And Property Rights In Haiti The Importance Of Land Tenure And
Property Rights Issues and Post-Earthquake Recovery In Haiti. Property Rights And Resource
Governance Briefing Paper 6.
———. 2014. Tunisia Urbanization Review: Reclaiming the Glory of Carthage. Washington, DC: World
Bank.
———. 2015a. Building Regulation for Resilience: Managing Risks for Safer Cities. Washington, DC:
World Bank.
———. 2015b. Haiti: Country partnership framework for the period FY16-FY19. Washington, DC:
World Bank.
———. 2016. Better Spending, Better Services: À Review of Public Finances in Haiti. Washington, DC:
World Bank.
———. 2017. Doing Business 2017: Equal Opportunity for AI. Washington, DC: World Bank.
World Bank and ONPES (Observatoire National de la Pauvreté et de l’Exclusion Social). 2014.
Investing in People to Fight Poverty in Haiti: Reflections for Evidence-based Policy Making.
Washington, DC: World Bank.
WorldPop. 2015. Database. Southhampton, UK: GeoData Institute, University of Southhampton.
www.worldpop.org.
19
[page 36]
[page 37]
CHAPTER1
LAYING DOWN THE FACTS ON HAITIAN
URBANIZATION
Andrea Colombo
[page 38]
Lu il Le nus — ee RE
u CARS AR
… sd Lit ù ‘ £
ES nt Fo. OM, LI di jf
ee Pis u “ SE +#
hs 3 A =, 4 5 AL AE RTET Per or ds
NL 4 Li. r. y LAN J d -- 5:
… A ii = 4 : LL = Et ai pa … à
À De 4 ÎrrRE mète REP, !: £ | le ”
— trip Les nn EE ——— un a 1 ETS As
4 L'SMRNEST ED. + PT PA td FR Li ES
, PAR et UT eme » mo Hit. UN He À =
me M | D EUX: Laine Se
…. re 8" ip ML, Tres
Le r æ _ = ”s Ê L "| -
3 « g + Le _- PRICE oi PER : $ a L —
y e = V2 7: + PHOTOGRAPHED BY ERIK BARKER,
À # Fi LE cd » rs a CE: a ED À J LMI COMN ÔNS bc “
RAR a 0 SR bas:
[page 39]
CHAPTER 1 — LAYING DOWN THE FACTS
ON HAITIAN URBANIZATION
Around the world, urbanization has been the level of urban population increased to 58
accompanied by growth, with incomes rising percent, but the countrys GDP per capita
as the share of population in cities increases. remained stagnant, and in fact dropped to
Historical data between 1996 and 2015 for USD 727. By way of comparison, in the Latin
over 180 countries suggest a positive relation- American and the Caribbean (LAO) region,
ship between Gross Domestic Product (GDP) Honduras and Guatemala had urban levels
per capita and levels of urbanization (Figure similar to Haiti in 1996, but their GDP per
1). Generally, as countries become more capita increased respectively by 41 and 28
urbanized, their economies tend to perform percent as they became more urbanized
better. The links between GDP growth and (Figure 1). Fragility and economic shocks
urbanization have been highlighted broadly from natural disasters have played a large role
by previous work, and international evidence in hampering the benefits of urbanization
shows that most countries reach middle-in- in Haïti. Among fragile countries, Haïti and
come status only after a significant popula- Côte d'Ivoire show similar patterns of urban-
tion shift into cities (WDR 2009). The density ization without growth (Figure 1). However,
found in cities provides fertile ground for the experience of Côte d'Ivoire also suggests
economies of scale and higher productivity, that as stability is built, cities, if well managed,
increasing opportunities that may eventually can be leveraged as engines of growth.
help lift many people out of poverty.! Contrary Understanding current urban challenges
to international trends, Haiti has urbanized is a key step into long-term planning for
without GDP growth. According to the World economic success. What is different in
Development Indicators (WDI), 33 percent of Haitian cities? Why are they not engines of
Haitians lived in urban areas in 1996. In that growth? What are the key bottlenecks that
year, the country's GDP per capita averaged prevent transforming Haitis story of urban-
at USD 757 (in constant 2010 prices). In 2013, ization into one of growth and prosperity?
See, for instance, Annez and Buckley (2009) and the World Bank’s World Development Report (2009).areas.
This chapter benefited from comments by Nancy Lozano Gracia, Claudia Soto, Olivia D'Aoust, and Paolo Avner. The analysis
of the size and expansion of Haitian urban areas draws from Deuskar, Stewart, & Lozano-Gracia (2016) and was made
possible thanks to the assistance of Sarah E. Antos and Katie L. McWilliams. Thanks to Emilie Perge for providing data
from ECVMAS 2012 and ECVMAS 2013 for the analysis of Haitian households.
23
[page 40]
A POSITIVE CORRELATION BETWEEN GDP PER CAPITA AND
URBANIZATION LEVELS PREVAILS ACROSS THE WORLD, BUT NOT
FOR HAITI (1996-2010)
100% -
° ©
® _
l >
= = EE P-é
75% La o &
nn ! CY 4
è 6° - =
F nn É ° |° D |
à pa
: [ses À L |
È S = : DC
> © S = © © o
£ 50% = =- # = -
& co à F E | a
S © ©
oi a =
à — #S © o
& o [=
5
S se o e ©
© 25% S O
Ë # LL - -°
a S — ©
So … œ 2)
= o
0% Lt | Lt | L | Lt |
100 1,000 10,000 100,000 1,000,000
GDP per capita (in USD constant 2010 prices)
© Haiti © Guatemala © Côte d'Ivoire = Rwanda © Honduras
Source: World Development Indicators, own calculations.
24
[page 41]
This chapter aims to answer these questions and security concerns have added further
by looking at the trends of urbanization and constraints to sustainable and productive
examining the key characteristics of cities urbanization. Between 1986 and 2014, Haiti
across Haiti, accounting for the elements of witnessed eighteen changes of government
fragility and disaster risk. First, the chapter and over twenty major cabinet changes.
focuses on Haitis urban growth in terms of Empirical research has shown that such insti-
population and land, as well as the challenges tutional volatility is detrimental to growth;
related to how urban areas are defined. It then recent estimates suggest that Haiti would have
provides an overview of the system of cities grown 1.2 percent faster if it had achieved
in the country, looking at their economic and an average level of stability across years (See
labor market characteristics. The chapter Aisen and Veiga 2013, and Singh, Bodea and
moves on to discuss some of the challenges of Higashijima 2016). Further, growing levels
urban poverty in its monetary and non-mon- of crime and violence, particularly in urban
etary forms, with a focus on lack of basic agglomerations, hamper investment and
services and infrastructure. It concludes by growth as businesses are usually forced to
linking the challenges of Haitis urbanization shut down or move operations elsewhere due
to three policy pillars that are the subject ofthe to high security costs.
remaining chapters: Planning, Connecting, Exposure to multiple natural disasters
and Financing. throughout most of the territory has made the
road toward development steeper and gravely
URBANIZINGWHILE GRAPPLING WITH WIDE- limited Haitis economic growth potential.
SPREAD FRAGILITY AND DISASTER RISK Most of Haiti’s territory is exposed to at least
One cannot narrate Haïiti’s story of urban- one kind of disaster (Figure 2), with cities at
ization without considering the country’s state larger risk for disaster loss given that they
of fragility.? Like other fragile states, Haïti has increasingly concentrate people, assets, and
grappled with deep poverty and inequality, infrastructure. Between 1971 and 2013, the
economic decline and unemployment, insti- economy was hit - to various degrees - by
tutional weakness, and violence (World Bank the occurrence of disasters almost every year
2007). For many years, poor governance led to (Singh and Barton-Dock 2015). It is calculated
minimal investments in basic infrastructure that hydrometeorological events have caused
and deterred an environment favorable for the country an average of USD 150 million
growth. Haitis long history of government per year in losses and damages, or 1.7 percent
neglect of basic services provision and poor of GDP (1976-2014). While localized floods
expenditure on key infrastructure explains have a limited economic impact (less than 2
today’s state of cities: unplanned, unser- percent of GDP), Hurricane Jeanne in 2004
viced, and overcrowded. Political instability and major cyclones registered in 2008 (Faye,
2The World Bank Group classifies Haiti as a ‘fragile’ state due to its low Country Policy and Institutional Assessment (CPIA)
ratings for economic, social, and public sector polities and institutions. Broadly, it is defined as the weakness of institutions
and vulnerability to instability, conflict, and violence. For more information, see the Country Partnership Framework for the
Republic of Haiti for the Period FY16-FY19: https:/openknowledge.worldbank.org/handle/10986/23127
25
[page 42]
Gustave, Hanna, and Ike), caused losses and Fragility and natural disasters have also
damages equivalent to 7 and 14.6 percent of shaped the social capital in Haiti in different
GDP respectively: Seismic disasters are much ways. Social capital is traditionally measured
less frequent, but could result in larger human via indices of political activism, interpersonal
and economic losses.4 The 7.3 Richter-magni- trust, and trust in institutions.$ Post-earth-
tude earthquake that struck Haiti on January quake surveys in Haïti suggest an increasing
12, 2010, followed by at least fifty aftershocks, proportion of Haitians have become more
resulted in massive economic and human active in the political life of the country in
losses, with economic costs representing 117 the aftermath of the disaster.° Citizens have
percent of national GDP. become increasingly involved in community
During the first weeks after the earthquake, activities, with the proportion of residents
large population movements out of the capital participating in some kind of association
were reported by the United Nations Popula- within affected municipalities increasing
tion Fund.$ Using mobile phone network data, from 34.9 percent in 2008 to 45.6 percent in
it was estimated that 630,000 people present in 2010. The same survey suggests that Haiti may
Port-au-Prince (PaP) the day of the earthquake have one of the highest participation rates in
left the capital within 19 days after the disaster. the entire LAC region, with almost 80 percent
Overall, 20 percent of the PaP pre-earthquake of the surveyed population declaring to have
population moved out of the epicenter’s area, taken part in at least one civic association
seeking shelter in neighboring municipalities, twelve months before the survey. However,
including Les Cayes and Saint-Marc. Seven building trust appears to remain a challenge.
months after the disaster, 1.5 million people According to the Latin American Barometer,
were living in 1,555 temporary camps.f Three Haiti now has the lowest rate of interper-
and a half years later, 172,000 people were still sonal trust in the region. Between 2008 and
living in crowded conditions in 306 camps. 2010, the proportion of interviewees trusting
Those who had left the camps did not neces- their peers decreased from 41 percent to 33
sarily find permanent housing.? Today, there percent. Crime rates also increased consid-
remain many buildings that have yet to be erably in affected municipalities after the
reconstructed and tents in the center of PaP earthquake (26.4 percent in 2010, an increase
(see Spotlight 2). of 10 percentage points compared to 2008).
5 See Matera, M. Ishizawa, O.A., Van del Borght, R., Nsimba, E., Simon, L., Dorsaint, W., and Surin, R. (2016) for further infor-
mation on the fiscal impact of natural hazards in Haïti.
4 There is no unanimity about the death toll of the earthquake. The Haitian government reports a death toll between 200,000
and 316,000, while other sources (see, for instance, Kolbe, Athena R. et al. [2010] and Daniel, J. E., B. Khazai, and F. Wenzel
[2013]) suggest a number of victims anywhere between 100,000 and 160,000 victims.
sSee, for instance, UNFPA-Haiti (2010).
SFigures are reported by Saint-Macary and Zanuso (2016).
TEstimations are retrieved from the International Organization for Migration’s 2013 report.
8 See the seminal work by Putnam, Leonardi, and Nanetti (1994).
°The impact of the earthquake on the social capital in those municipalities affected by the 2010 earthquake was measured
through three waves of surveys conducted before and after the disaster within the Latin American Public Opinion Project,
Latin American Barometer, and USAID. For more detailed information, see Zéphyr, Cérdova, Salgado, and Seligson (2011).
26
[page 43]
Figure 2.
% 5x ü “ , Æ
Natural Hazards in Haiti vo se,
atural Hazaras In Haiti 7 ATLANTIC OCEAN .
—— ee, ST
DM High Risk of Flooding or Coastal Flooding i KE = =
EM High Risk of Landslides oo TU
High Risk of Seismic Activity 4 ee A, 4° Vs y — x
EE en: e “ NS + (re, Pen x
High sk of Drought à FOUR « A ÿ ‘ (Nord F f
— _ Active Major Faults { Be = NSP (Pres
— —k Trajectory of Cyclones = 5 "e a A 8 "a
% Epicentres of Major Earthquakes ee. RE ni:
(B.] AArtibonite 2 \
© Tsunami Observations ne À IS À ERP CE N
\} LE ns,
a À Rte 42% CaribbeanSea - - KO dE
CEE Ne HAS | . E
+- Férnrse FES, < - =
cs Ke
RO STE re % ce & =
1 RO Pier Liane Se : Sr:
’ =$2 s Lame ( de
DRE PE Vie Fe K KE à > Dominican
= > 8 dE, 2 à + « sl S: PR Republic
FAR SNS be À LC > SP
a &! Ds < Rs à |
"0 À LE Væ. x HA CE + PORT-Al pe
En De à à 7 a = 5
de ! je Fame MORE
FER à A tes ES Qu
ÿ ve ÉD A ra er cr
/ 1 On: ; D 4 ET EE %E
4 1 F2 $ 6 de cr
| 2 <e, br à
& ! ’ FAN: DS x < ae.
Eli ” re $ & ». Rs,
DIS SET LES \ aribhean Se x SR
Source: Atlas des menaces naturelles en Haïti (2015).
Urban growth: À story of rural push and high In the mid-1980s, 80 percent of Haiti’s popula-
Jfertility rates tion remained in rural areas, but the number of
In 1950, less than 10 percent of Haïitis total residents in cities and towns was increasing at
population of just over 3 million lived in urban four times the rate of the rural population since
areas. In the next twenty years, the number of the 19505. By 1982, over a million Haïtians
urban dwellers grew on average 5 percent each were living in urban areas. Most urban popula-
year, and eventually doubled in number at the tion growth took place in Port-au-Prince, with
start of the 19705, reaching just over 700,000.1° as many as 70 percent of urban residents living
+ Figures are extracted from the 1971 and 1982 census and can be retrieved from IPUMS. For 1950 demographic data, see World
Bank (1985). 20 See Tobin (2013) and Box 1 for more details. 21 Data on country-level fertility rates were retrieved from the
World Development Indicators. For more details on the Haitian fertility rate at the subnational level and in urban areas, see
Chahnazarian (1992).
27
[page 44]
BOX 1 - POLITICAL AND ECONOMIC DRIVERS OF HAITI'S URBANIZATION:
A HISTORICAL ACCOUNT
The first seeds of the cultural dichotomy between urban and rural people (in Creole, moun lavil, literally
“downtown people,” and moun deyo, literally “people from the outside”) were sown at the dawn of Haitïs
independence from the French Republic in 1804. As the country’'s agricultural sector transitioned from
relying on a large-scale plantation economy to a small-hold and leasehold production, farmers improved their
living standards and began to aspire to an urban life and political representation. Elites in cities curbed their
ambitions by blocking rural populations’ access to urban areas, controlling people’s movement on roads, and
limiting investment in any kind of connecting infrastructure.
The 1915-1934 US occupation reversed this trend. During this period, Haitis transport infrastructure was
modernized, the ancient regime institutions were abolished, and Haiti underwent an initial urbanization push.
Port-au-Prince increasingly assumed the leading role as the country's capital.
According to the first census conducted in 1950, more than half of the residents in Port-au-Prince were
born elsewhere, and their number grew by approximately 2,000 people per year. By 1982, 70 percent of urban
residents lived in the country's capital. During the second half of the twentieth century, impoverished farmers
regularly chopped down trees to obtain their cooking fuel (charcoal). Deforestation and soil erosion followed,
causing the loss of fertile topsoil, and worsening the productivity of rural lands. Further, erosion increased
vulnerability to landslides and floods, which nowadays often disrupt the country’s economy. The massive
migration from rural to urban areas-especially to Port-au-Prince-in the 1960s and throughout the 1980s has
institutional and economic roots, as described above. The reluctance of cities to welcome rural migrants (a
hesitancy also observed in the history of other Latin American countries)! ! impacted the potential leverage
of increasing densities to boost urban productivity. As more Haitians flocked into PaP, the provision of water,
sanitation, electricity, and other basic services did not expand accordingly, as further discussed in this and the
following chapters. In 1998, two-thirds of the population of Port-au-Prince was estimated to be concentrated in
teeming slum districts.!?
Sources: Tobin (2013), Yarrington (2015).
Feler & Henderson (2008) discuss the case of Brazil, where during the dictatorship, undesired migrant households were
prevented from accessing basic services, eventually shaping the geography of Brazilian cities.
2See World Bank (1998) for more details about the living conditions in slums in Haiti back in the Nineties.
28
[page 45]
in the capital in 1982. The early primacy of 2000 and 2015. These statistics may, however,
PaP dates back to the early second half of the underrepresent the size of the urban popula-
twentieth century when factors such as faulty tion in Haiti. As outlined in Spotlight 1:
agricultural policies, over-exploitation of land, “What is Urban and What is at Risk?” there
and a general cultural and political bias toward are a number of difficulties in estimating the
cities deteriorated Haitis rural economy. population from census data in Haïti.
With over 80 percent of government revenue Today, as much as 64 percent of the popula-
drawn from direct taxation of farmers, while tion of Haïti may be urban, making it the
policies favored urban commercial develop- fourth most urbanized country in the LAC
ment and assembly plants especially around region. In this report, we employ an innovative
Port-au-Prince. Haitians flocked to the capital methodology for measurement that draws on
in search of better economic opportunities and gridded population estimates and population
higher living standards. density thresholds (see Spotlight 1). The results
Estimates suggest that by the mid-1990s, are comparable with other countries across the
30 percent of Haitians lived in cities. LAC region, irrespective of differences between
Approximately 1.4 million people lived in countries in the way they define ‘urban’ in
the capital, and 100,000 people lived in the their national census. Using this approach,
second largest city, Cap-Haïtien (CAP). we estimate the urban population of Haiti
Existing literature and household surveys to be around 6,179,000 people. According to
trace the latest urbanization trends back to these estimates, it is one of the most urbanized
demographic dynamics. For instance, in the countries in the region, following only Puerto
19908, Haiti’s fertility rate was twice as high Rico, Trinidad and Tobago, and Mexico.
as the average in the LAC region (5 births per Regardless of the definition of “urban” used,
women), and in Port-au-Prince, women gave urbanization trends are set to increase in the
birth to four children on average.4 coming years. According to official statistics,
The combination of these demographic Haitis urban population grew at a rate of 3.6
changes pushed Haiti well over the 50 percent percentage points faster than the average
urbanization mark at the beginning of the Caribbean country and nearly doubled its
21st century. According to national statistics, urban population, from just over 3 million
52 percent of the population lived in urban in 2000 to nearly 6 million in 2015. Ten years
areas in 2015.5 The United Nations World from now, the urban population is expected to
Urbanization Prospects (UN WUP) indicate a increase by almost another 2 million people
higher number - 57 percent - and an average and could surge to around 11 million by 2050,
annual urbanization rate of 5 percent between for a 76 percent urban rate.
3 See Tobin (2013) and Box 1 for more details.
#4 Data on country-level fertility rates were retrieved from the World Development Indicators. For more details on the Haitian
fertility rate at the subnational level and in urban areas, see Chahnazarian (1992).
5 Institut Haitien de Statistique et d'Informatique (IHSI) 2015 population estimates.
The challenges arising from using these conflicting definitions for comparison between countries or for global aggregation of
data are not unique to Haiti and have been widely discussed in previous work (Satterthwaite et al. 2007; World Bank, 2009;
Dijkstra and Poelman, 2014).
29
[page 46]
URBAN SIZE, SHARE OF OVERALL URBAN POPULATION, AND SHARE
OF URBAN POPULATION IN HIGH DENSITY CLUSTERS FOR SELECTED
ARRONDISSEMENT
233 OO, CO CO CO
e
2,5, COCO CO À
$
ë e
È 2 à OC CO, CC CO À
d
Ë
3 5, OO À
5 e
S e
5 2,000,00 0
CSI
Ê . e e
Z OO, OO à
CR
2 à © 2 © 2 »X D 2 9 © 2 ms + 4
2 Ex
Urban Population @ Share of Urban Pop in High-Density Clusters
Share of Overall Urban Population
Sources: Own computations based on Landscan gridded population data, and Deuskar, Stewart, and Lozano-Gracia (2016).
An evolving urban landscape: Changes in followed by Nord (66 percent) and Artibo-
population and built-up areas nite (57 percent). Haitian départements are
Haitÿ’s territory is divided into ten regions divided into 42 provinces (arrondissements).
(départements), the largest being Ouest and The capital’s arrondissement comprises eight
Artibonite, located in the west and center- municipalities and is home to 2.7 million
north of the country, respectively. The Ouest residents - comprising 45 percent of the
département, where the capital Port-au-Prince country's urban population and 29 percent of
is located, is the most urbanized (87 percent), the total population (Figure 3).17
7 The metropolitan area encompasses the municipalities of Carrefour, Cité-du-Soleil, Delmas, Gressier, Kenscoff, Petionville,
Port-au-Prince, and Tabarre.
[page 47]
EVOLUTION OF URBAN POPULATION DISTRIBUTION BY CLASS
OF CITIES
50%
1%
40% D
30% D
25% ob ——_—_—_—_—_———————— oo"
20% EE —____——————_
15% CN
10%
5% 28 —————
0%
PaP [200k-300k) [100k-200k) [sok-100k) [zok-sok) [1k-10k)
EN :990 2000 201$
Sources: Own calculations based on Landscan gridded population data and night light data for 1996, 2000, and 2015. Only
agglomerations in which light emission was registered in at least one of these three years were included.
Haiti has a diversified portfolio of cities. cities between 100,000 and 300,000 inhabi-
For this report, we further extract informa- tants. This is represented visually in Figure
tion about urban population and the extent 3. Details of the methodology used for this
of cities using nighttime lights. The results analysis and a full list of classification of
indicate that 40 percent ofthe population in cities can be found in Spotlight 1.
cities is located in the metro area of Port-au- The composition of city categories has
Prince. The second and third largest areas shifted significantly since 2000. Cities have
are Cap-Haïtien in the Nord département, moved significantly between city categories
and Léogane in the Ouest département. based on important changes in popula-
Cap-Haïtien has 320,000 inhabitants, tion size between 2000 and 2015. At the
representing 6 percent of the urban popula- turn of the century, only Cap-Haïtien had
tion and 5 percent of the overall population. more than 200,000 inhabitants, but was
Léogane has an urban population of 317,000 joined by Gonaïves fifteen years later. The
inhabitants. Gonaïves, Saint-Marc, and number of cities with more than 100,000
Dessalines follow with 261,000, 240,000, inhabitants increased as well from three to
and 214,000 inhabitants, respectively. Over seven, including the cities of Ouanaminthe
19 percent of the population is located in and Port-de-Paix. Several new “medium-
[page 48]
GROWTH RATE OF BUILT-UP LAND AND MARGINAL INCREASE, BY
ARRONDISSEMENT (1975-2011)
S e
E 2 D
È
È 2120
F
$ Es
5
A 8% ES SE
E
Aa 6% ES COS CE ES CE
o
è
ë
ô 0% DNS DR uns
É © s à 5 $ Ou 8 À ES s
Ô à à à Z à E 2 7 8 Ÿ à
2 É 2 ES 9 £ rh &
2 Cr …
<O
£
Artibonite Nippes Nord Nord-Est Ouest Sud Sud-Est
1975—1990 1990—2000 2000—2011 @ Marginal Increase 2000—2011(sq.km.)
Source: Deuskar, Stewart, and Lozano-Gracia (2016), based on WorldPop
size” cities appeared.'8 The weight of each people and more than 1,500 people per
class of cities in the urban system has also sq. km. In Port-au-Prince, density levels
changed. Figure 4 represents the evolution reach as high as 32,500 people per sq. km,
of the share of urban population by category between 1 and 2 kilometers away from the
of city, from 1990 to 2015. Marché en Fer (Iron Market). This is much
The majority of urban residents in higher density than the center of African
all cities live in high-density neighbor- cities with similar levels of per capita
hoods. All cities in the portfolio have over income, such as Nairobi which has 21,700
60 percent of their population living in inhabitants per sq. km in the center of the
high-density neighborhoods, defined as city (see Spotlight 2 for further discussion
within-city areas with more than 50,000 of land use within the city).
38 Since no new smaller cities were added, the number of small cities slightly decreased from twelve in 2000 to nine in 2015.
1 See Box 2 for more details about the clustering methodology and the definition of differently dense urban clusters.
[page 49]
Port-au-Prince dominates the urban Just as population concentrates in and
system. The administrative, economic, and around Port-au-Prince, so does Haïiti’s
political primacy inherited from the Duvalier economic activity. The metropolitan area
regime makes Port-au-Prince the major pole of has the highest economic density in the
attraction for job and business opportunities. country, with an estimated GDP of USD 5
As more and more Haïitians migrated to the billion - 41 percent of the country’s overall
capital, many settled on the outskirts of the output in 2006. Delmas and Croix-des-Bou-
metropolitan area. We estimate that in 2015, quets are the next largest contributors to
111,000 Haitians live in highly dense neigh- the country's GDP. Other large cities like
borhoods from the neighboring arrondisse- Cap-Haïtien, Gonaïves, Port-de-Paix, and
ment of Croix-des-Bouquets. In fact, certain Saint-Marc together contribute an estimated
areas of Croix-des-Bouquets form, along 11 percent to GDP (USD 1.3 billion). Les
with the arrondissement of Port-au-Prince, Cayes (large city) and Jacmel (medium-size
the “Greater Port-au-Prince” (“Greater PaP”). city), in the south, also show some concen-
This urban conglomerate (a de facto city), tration of economic activity, underscoring
although not framed within official adminis- the potential role of connections between
trative boundaries, provides jobs and services remote rural areas and larger cities in the
to almost 3 million urban residents.?° Haitian urban system. Both population and
Itis crucial to acknowledge the real extent economic density, however, contributed
of the metropolitan area of Port-au-Prince little to boosting Haïiti’s economic growth.
when planning for services and infrastruc- The next sections will highlight some of
ture provision for all the workers that might the socio-economic obstacles that prevent
potentially commute every day to the capital. the country from leveraging its cities’ high
From 1975 to the early 1990s, the “Greater densities and benefiting from urbanization.
PaP” expanded faster than the national In addition to Port-au-Prince, our estima-
average (6 percent annually); in 1900, it tions suggest that there are five other large
covered over 100 sq. km, more than double urban clusters in Haiti. The arrondissements
the surface from 15 years before. In line with of Cap-Haïtien (Nord) and Léogane (Ouest)
the national trend, growth of built-up land are the next largest in terms of urban popula-
in the metropolitan area slowed down in tion. Cap-Haïtien has 320,000 inhabitants,
the following twenty years, but grew higher representing 6 percent of the urban popula-
in magnitude (8 sq.km on average annually) tion and 5 percent of the overall popula-
than any other urban agglomeration in Haiti. tion, with as many as 74 percent living in
Figure 5 shows the growth rate of built-up high-density neighborhoods.
areas for selected arrondissements in each of
the départements, together with the value of
their marginal increase?!
2 At a more aggregate-level, the Ouest département - where the metropolitan area is geographically located - hosts 55 percent
of the total urban population and 40 percent of the overall population.
2 For details on the methodology, see World Banks background note for the Haiti Urbanization Review (2016).
33
[page 50]
URBANIZING UNDER AN UNFAVORABLE Lo
LABOR MARKET AND HIGH LEVELS OF of the construction industry after 2010, and
POVERTY 9 percent of urban residents in 2012 were
employed in the construction business.
Haitis economy has been recovering Industrial activities in urban areas play a
slowly since the 2010 earthquake, when it secondary role in the economy, but have great
shrank by 5.5 percent. In 2015, annual GDP potential for future growth. Manufacturing
growth was estimated to be 1.2 percent, accounts only for 8 percent of the country’'s
higher than the LAC average, but more than 3 GDP (estimations from the Economist Intel-
percentage points lower than the average Low ligence Unit 2016). However, export-oriented
Income Country (Singh and Barton-Dock garment businesses can leverage on recent
2015). Inflation has been reduced to single investments in the Port-au-Prince and
digits and external debt shrank following Cap-Haïtien seaports, which now handle 90
debt cancellation. But the diminishing percent of Haiti’s international trade.24 The
inflow of post-earthquake foreign aid, as well SONAPT industrial park, located within 5 km
as political instability at the beginning of from Port-au-Prince’s main port, is one of
2016, led to the depreciation of the country’s the largest garment clusters in the country.
currency.? Most recent economic growth, Other smaller garment factories are on the
between 2005 and 2015, has been mainly outskirts of smaller cities like Ouanaminthe
driven by the rise in sectors leveraging urban- (Grupo M, 6,500 workers) and Cap-Haïtien
ization forces, namely industry and services. (S&H Global, 2,500 workers). Nevertheless,
According to survey data, the urban employment in the manufacturing industry
economy is dominated by the tertiary is still relatively low, accounting for 4
sector: 38 percent of the 1.4 million workers percent of workers in PaP and 3 percent in
in cities have a job in commercial activi- smaller cities.?
ties.3 Consumer services in Port-au-Prince Outside the capital, agriculture-related
account for one-sixth of the capital Gross jobs are still widespread. The agricultural
Value Added. Beyond trading, 40 percent of sector, highly vulnerable to shocks and
urban workers - especially in Port-au-Prince scarcely contributing to the country Gross
- are employed in other service sector activ- Value Added, still employs most workers (45
ities, such as transport, education, finance, percent) nationwide. The primary sector
and tourism. Post-earthquake home recon- is the largest in Grand'Anse (66 percent of
struction and some advances in government the labor force), Centre (62 percent), and
infrastructure projects sustained the growth Sud-Est (59 percent). Agricultural employ-
2 Data and estimations from The Economist Intelligence Unit, Country Report (December 2016).
3 Data is obtained from the 2012 “Enquête sur les Conditions de Vie des Ménages Après Seisme” - ECVMAS survey. These
figures match to some extent the 2016 estimations by the Economist Intelligence Unit and the 2012 approximations by
Oxford Economics.
#4 Investments in port infrastructures have pushed Haiti among the 10 (out of 32) best Latin American countries and 2nd (out
of 29) best among the poorest countries in “trading across borders.” See the 2015 World Bank report “Country Partnership
Framework for the Republic of Haiti for the Period FY16-FY19.”
3% On the low employment rates in the apparel industry, see also International Monetary Fund (IMF), 2015; Hornbeck, 2011.
34
[page 51]
ment, though, is not confined to rural areas. on rural employment can be traced to a few
It involves 15 percent of the labor force from specific phenomena related to age groups and
smaller urban agglomerations and rural gender. First, the employment increase was
towns. These urban clusters could therefore very pronounced among the younger cohort
be functioning as a gateway to mediate the of rural individuals (15-25 years old). Second,
flow of labor and products between rural female employment rates in rural areas
hinterlands and urban centers.26 increased across all age groups. However, the
expansion in employment rates among young
Unemployment, underemployment, and men and women, and for women of all ages,
little productivity is almost entirely explained by an increase
According to recent estimates, 75 percent in individuals reporting being unpaid family
of the working age population in Haiti is workers working a few hours a week - reducing
part of the labor force.?7 Almost 4 out of five the real increase in rural employment (Scot
Haitians are either employed or willing to and Rodella, 2016).
start a job on short notice if offered one. Despite an overall decline, unemployment
National unemployment rates have declined remains an urban issue. Survey data from 2012
steadily since 2001, from 27 percent to 12 indicates that 40 percent of the urban labor
percent in 2012. Àt present, unemployment force does not have a job. The probability of
in Haiti is much higher than LAC's average being employed in cities was between 4 and
of 6 percent, but comparable to other nations 5 p.p. lower than it had been in 2001, while
in the Caribbean region? On the other hand, the same likelihood in rural areas was almost
the number of underemployed people has 20 p.p. greater. The urban labor market can
increased since 2007. In 2012, eight out of nonetheless rely on a younger labor force than
ten workers in the country earned less than the rural one: in 2012, 57 percent of residents
the national minimum wage (250 gourdes in cities and towns were between the ages of 15
per day - approximately, USD 6 at the 2012 and 49 years. Across urban areas, workers in
exchange rate). smaller cities are 3 percent more likely to find
Rural areas, more than cities, have contrib- an occupation than those living in Port-au-
uted to the fall of unemployment. In 2012, Prince, conditional on their characteristics.
the probability of being employed in rural Underemployment and informality are
areas was almost 20 percentage points (p.p.) two other characteristics of the urban labor
greater than in 2001. The increasing figures market. The most recent statistics suggest
2 Working in non-farm activities is correlated with a significantly lower probability of being poor, highlighting the importance
of fostering non-primary jobs even in traditionally rural areas (Scot and Rodella, 2016).
#7 The labor force is the supply of workforce available for producing goods and services in an economy. It includes people who
are currently employed and people who are unemployed but seeking work, as well as first-time job-seekers. Not everyone
who works is included, however. Unpaid workers, family workers, and students are often omitted, and some countries do not
consider members of the armed forces. Figures are elaborated by the International Labour Organization (ILO).
# In particular, the Bahamas and Belize (14 percent each) and Barbados (12 percent). See Scot and Rodella (2016) for further
details.
#Underemployment is defined as the share of workers receiving less than the minimum wage.
35
[page 52]
BOX 2 — À SNAPSHOT OF HAITI'S ECONOMIC SECTOR COMPOSITION
The service sector contributes 57 percent to the Gross Value Added (GVA). From 2005 to 2015, it grew by
2 percent annually. Construction services surged given an increasing demand for homebuilding and earth-
quake and hurricane reconstruction. Consumer services account for around 30 percent of the national GDP.
Other important tertiary subsectors are: wholesale trade, transport and communication services, public
services, and financial and business services, in order of relevance.3° Between 2000 and 2015, the secondary
sector increased by 4 percent annually, with manufacturing growing at an average annual rate of 2.6 percent.
Yet industry accounts for only 21 percent of the GVA and has progressively shrunk over the years. In 1990, it
represented 18 percent of Haiti’s GDP, but decreased following a United States embargo that lasted from 1991
to 1994 (Singh and Barton-Dock 2015).3! However, the increasing request for apparel assembly, primarily
from the US, boosted manufacturing and industry, especially in urban areas. Textiles represent 88 percent of
the country exports (20 percent of GDP) and are expected to expand further into markets in North America,
thanks to the HOPE II Act.#?
Agricultural production accounts for 22 percent of the GVA, but has been stagnant for the past fifty years
and declining after 2010. The 1991-04 embargo hampered access to important agricultural inputs and contrib-
uted to the decline of productivity in the sector. High fragmentation of land, legally insecure land rights, credit
shortage, low levels of technology, and soil deterioration have also constrained agricultural productivity (Singh
and Barton-Dock, 2015; WTO, 2015). Food production is constantly put at risk by natural disasters: in the past
years, droughts have affected around 50 percent of crops (USAID, 2011). Deficiencies of the primary sector
together with an increasingly urbanized population force Haïti to import 55 percent of the country’s food
needs. This number explains Haïiti’s trade imbalance: the country imported 50.6 percent of its GDP in 2016.
Sources: Tobin (2013), Yarrington (2015).
that, on the demand side of the market, the not registered or do not keep formal accounts
share of non-agricultural workers without - decreased by 8-10 percent between 2006
written contracts and social protection and 2012. However, this trend reflects the
amounts to 80 percent in the capital and increase in the share of workers employed
90 percent in other cities (See Box 3 for an in the public sector and nongovernmental
example of women in the informal economy). organizations (NGOs), rather than a decrease
On the supply side, the probability of workers in the share of informal employees. In fact,
being employed in the urban private informal in 2012, the labor force employed in small
non-farm sector - i.e., unincorporated enter- informal enterprises was 50 percent in PaP
prises, mostly household business, that are and 65 percent in other cities, respectively.34
Ibid.
# World Development Indicators and the Economist Intelligence Unit forecasts.
# Other products exported are metals (3.1 percent of overall export, mostly iron and copper) and essential oils (2.2 percent).
Data extracted from UN Comtrade and referred to 2014.
# Ibid.
# Figures are based on the authors’ analysis of the 2012 ECVMAS survey. See Scot and Rodella (2016) for further details.
36
[page 53]
Às Haiti becomes more urbanized, jobs indeed slowed down and has led the Haitian
are created in low-productivity non-tradable Central Bank to cut its 2016 GDP growth
services (like trade and construction) rather forecast.%7 More decisive policies should be
than in higher productivity tradable activi- adopted to shift the economic system toward
ties (like manufacturing and services). The more environmentally and socially sustain-
precarious growth of Haitian cities seems to able manufacturing and services. Otherwise,
be driven by domestic consumption, rather future shortages of the exceptional resources
than production. Although hard evidence of income that Haiti relies on, might plunge
(and data) is not yet available, consumption the country and its urban areas even further
in turn might be driven by remittances and into poverty.
foreign aid. In fact, survey data suggests that,
as of 2012, over 35 percent of urban house- Vulnerability and chronic poverty remain a
holds and 20 percent of rural households challenge, but poverty in cities has declined
receive remittances. Monetary transfers are Extreme poverty has declined in Haiti in
often large in value and their contribution the first decade of the 20005, especially in
to total income (an average of 24.5 percent urban areas. At the national level, extreme
in the country) is larger than that of in-kind poverty decreased from 31 percent in 2000
gifts (12.2 percent). Foreign aid contributed to 24 percent in 2012. Most of its reduction
to increasing labor demand for post-2010 took place in the metropolitan area (from
earthquake reconstruction and to the 20 to 5 percent) and in smaller cities (from
growth in the share of construction services 21 to 12 percent). Despite this progress,
to local GDP - especially in Port-au-Prince. Haiti remains the poorest country in the
Based on evidence from other countries, LAC region and one of the poorest in the
such as Nigeria and Angola, consump- world. Today, around 59 percent of Haitians
tion-driven urbanization curbs cities’ live in poverty. Nearly 6.3 million Haitians
productivity even further. Moreover, it cannot meet their basic needs and 2.5
ties them to the volatility and precarious- million cannot cover their food needs.4°
ness of external sources of income, like Around 695,000 poor people live in Port-au-
remittances and foreign aid. While future Prince (16 percent in extreme poverty)
remittance inflows are difficult to forecast, and 1.4 million reside in smaller cities (24
aid flow has been in decline and is expected percent in extreme poverty) (Figure 6).
to continue to fall, negatively affecting one Recent work using data from two
of the country's main economic activities Demographic Health Surveys (DHS) for
(ie. construction).36 In the past years, the 2006 and 2012 further suggests that living
growth of the construction industry has standards improved the most in urban
3 Gollin, Jedwab, and Vollrath (2016) and Jedwab (2013) discuss the rise and issues of consumption in cities.
% In the aftermath of the 2010 earthquake, international donor assistance represented nearly 17 percent of GDP, but fell to 7
percent in 2014 (World Bank 2016).
# Based on the Economist Intelligence Unit’s 2016 forecasts.
4See Singh and Barton-Dock (2014).
37
[page 54]
BOX 3 — "MADAN-SARA": À WELL-ORGANIZED CHAIN OF INFORMAL WORKERS
Key protagonists of Haitian informal trade are the “madan-sara.”4 “Madan-sara” - named after a local
migratory bird - buy in bulk from producers or intermediaries in rural areas to sell wholesale in urban centers.
They are therefore a crucial intermediary connecting producers in remote areas with large markets in cities.
In September 2015, The New Yorker covered the stories of Haitian business-women periodically jumping on
crowded boats for a six-hour overnight journey between Marigot - in the South - and Anse-à-Pitres, along the
border with the Dominican Republic.
Once or even twice a week, a “madan-sara” reportedly pays around USD 5 (250 Gourdes) to travel to Anse-à-
Pitres. She then crosses the border to the Dominican Republic and trades goods, e.g. clothes for other primary
goods. She then pays around USD 5 per carrier bringing the merchandise back to the Haïitian side of the border,
and USD 30 per bag of freight loaded onto the boat back to Marigot. Back home, she would also hire Tap-Tap
drivers to carry the goods into storage. For each successful trip, each of these women can make about 10,000
HTG - nearly USD 200.
Source: Jelly-Schapiro, 2015.
areas.# While the proportion of rural house- Despite an overall reduction, chronic
holds that were poor or very poor remained poverty remains widespread in Haiti.44
unchanged between this six-year period, Using panel data with information on
about 80 percent of the urban households consumption levels registered in urban
reported to be somewhat better off. The data areas in 2012 and 2013, and ad hoc income
suggests that households in the Port-au- thresholds, Figure 7 shows: (a) the share of
Prince metropolitan area, for instance, had the poor population; (b) the proportion of
better access to consumption goods and people who, although not poor, are vulner-
services and to improved housing.# able and likely to fall back into poverty; and
#To our knowledge, there are no official statistics in this sense. However, local newspapers and magazines - like Le Nouveliste
and Woy magazine - often report “madan-saras” to be usual victims of road accidents.
# The Demographic Health Surveys (DHS) and households’ surveys used above also ask questions about households’ poverty,
although measured according to two slightly different methodologies. The DHS conducted by USAID do not collect infor-
mation about income and capacity of consumption of households, but rather on the characteristics of their houses and their
access to consumption goods and services. The resulting wealth index is then used to classify households along five quintiles
of wealth: poorest, poorer, middle, richer, and richest. The wealth index built by the DHS, however, do not capture the main
determinant of poverty in developing countries: the spending capacity of families. Moreover, it does not track the same
households across waves; through the DHS it is therefore difficult to understand how many households have been stuck in a
poverty trap and the proportion of those that emerged from poverty or reverted into it.
#$See Singh and Barton-Dock (2014) for a more extensive analysis.
# Chronic poor are those households identified poor both in 2012 and 2013; this means that their consumption was always
below the poverty line. The transitory poor are those households who spend only one period (either 2012 or 2013) in poverty.
See Perge and Scot (2016) and the literature mentioned therein for a more detailed discussion about these definitions.
38
[page 55]
FIGURE 6. POVERTY INCIDENCE BY FIGURE 7. PROPORTION OF
PLACE OF RESIDENCE (PROPORTION HOUSEHOLDS BY POVERTY STATUS IN
AND ABSOLUTE NUMBERS) 2012 AND 2013
80% 5% es
8 7% 40% ms
©
= 60% es 0 ——————
à — — ——
& 50% ns 30%
£ 5
è COS, 25%
à ,
‘8 30% ee 20%
E : —— _—
&
Fa 20% = es = 15%
5 _
È
©
À 10% | nt 5% L_
0% un = 0%
Poverty Extreme Poverty Poor Vulnerable Non-Vulnerable
(income p.c.<G817) (income p.c. < G 41.6) in ‘13 in ‘13 in ‘13
EN Metro Other Rural EN Poorin ‘13 Vulnerable in ‘13
Area Cities Areas . k
Non-Vulnerablein ‘13 @ Abs. values in 2012
Source: Own calculations based on ECVMAS 2012 and Source: Perge and Scot (2016) based on ECVMAS 2012 and
thresholds computed by Perge and Scot (2016). ECVMAS 2013.
(c) the share of non-vulnerable individuals.# is in line with the trend prevailing in the
In 2013, the proportion of poor residents LAC region.4 At the same time, 40 percent
decreased from 40 to 34 percent with respect of individuals in urban areas are vulnerable
to the previous year. However, 22 percent of to poverty, higher than what was observed
residents that were poor in 2012 remained at the national level (28 percent).4 This
so the following year; this figure is half than fact highlights the fragile conditions that
what was observed at the national level and still affect those that have to some extent
4 See Perge and Scot (2016) for more technical details.
46 As in Vakis, Rigolini, and Lucchetti (2015). Notice, however, that the poverty line used in that study is the USD 4 a day (2005
PPP), significantly higher than Haitis median poverty line.
4 Between 2012 and 2013, 14 percent of formerly poor persons increased their wealth and became less - but still - exposed to
poverty; 8 percent of non-vulnerable residents in 2012 became so in 2013.
[page 56]
overcome poverty; in particular, transi- URBANIZING UNDER CROWDING CONDI-
tory poor in urban areas face shocks linked TIONS AND WITH NO SUPPORTING INFRA-
to urban labor markets, such as company STRUCTURE
failure or loss of income from non-agricul- Poverty is not only defined in monetary
tural services. terms; lack of infrastructure can represent
Income inequality is stagnating and a major obstacle for urban households to
remains the highest in the region, although escape poverty traps.# This is particularly
improvements have been registered in cities. true in areas that combine the highest popula-
The Gini coefficient remained constant at tion density and where access to clean water,
about 0.6 between 2001 and 2012; since then, improved sanitation and electricity is limited
inequalities have persisted. Haiti remains or lacking. In such cases, density leads to
the most unequal country in LAC and one of overcrowding, unhealthy living conditions,
the most unequal in the world. In 2012, the and marginalization, rather than becoming
top ten percent of the population controlled an asset for growth. As further discussed in
almost 50 percent of the country’s resources. the next chapters, the infrastructure gap in
At the subnational level, between 2002 cities is large in terms of basic services and
and 2012, inequality decreased the most in other infrastructure such as roads.
urban areas (from 0.64 to 0.59), whereas it
increased in rural areas (from 0.49 to 0.56). Access to improved water and sanitation
The widening of inequality in rural areas only reaches a few
can be explained by repeated weather-re- More than one third (35 percent) of urban
lated shocks that undermined agricultural residents do not have access to an improved
production, and by inflation that fueled water source (WDI 2015), and trends show
higher prices of food; both phenomena that, due to recent urban growth, rates are
affect the rural poorest disproportionately.4$ declining.$ The 2012 DHS survey shows that
the proportion of families with water piped
into their dwelling or with access to a public
tap decreased from 24 to 3 percent and from
65 to 21 percent, respectively between 2000
and 2012. Similarly, in smaller cities and
towns, the proportion of households with
piped water into their dwellings decreased
from 20 to 2 percent over that period. In
4 See Singh and Barton-Dock (2014) for further details on poverty diagnostics in Haiti.
# Evidence on lagging access to infrastructure and basic services is drawn from own computations based on 2000, 2006, and
2012 Demographic Health Surveys.
s° Overall, only 58 percent of the Haitian population had access to drinkable water from an improved source. This figure places
Haïti 25 percentage points below the second worst-performing country in the LAC region (the Dominican Republic) and
among the 10 worst-performing low-income countries (slightly better than Eritrea, Niger, and Tanzania). Improved sources
of water include piped water into dwelling, to yard, or to the neighbor; public tap water; tube well or borehole; protected dug
well; protected spring; rainwater; bottled water or sold by company.
40
[page 57]
addition to this, there is important variation at night (Tilmans et al. 2015). Box 4 discusses
in access rates across and even within urban informal workers, referred to as bayakou, who
areas. While data to assess access to services help deal with the lack of adequate sanitation
within individual cities is hard to find, a infrastructure.
recent profile of Cap-Haïtien suggests that
access is geographically uneven, with only 20 Access to electricity is unequal across urban
percent of the country’s communes having areas
satisfactory levels of running water service With regards to electricity, only 38 percent
(UN Habitat Cap- Haïtien Profile 2012). of Haïtian households were estimated to have
Smaller cities also have lower overall water access in 2012. No other country performed
access rates - 55 percent in Milot, for example, as poorly as Haïti in the LAC region, where
and rural towns tend to have low household on average 96 percent of the population is
connection levels to the public network - as covered. However, when compared to low-in-
low as 5 percent (Habitat 2012 Milot Urban come peers elsewhere, Haiti is among the top
profile; Brault, Sanz, and Le Bansais 2014). ten in terms of access. Its access rate is similar
The challenges are further exacerbated by to Gambia (35 percent of the population
individual household constraints to ensure covered), Eritrea (36 percent) and Benin (38
that their water is safe; in smaller cities 45 percent). Within Haiti, electricity coverage
percent of families lack the tools to boil water is unequal: in 2012, half of the population
for cooking or washing hands (DHS 2012). living in small cities and towns had access
Current sanitation systems are inadequate to electricity, in contrast to nearly 90 percent
to serve the urban population. Two-thirds (66 of households in the capital. Coverage in
percent) of urban residents lack improved “secondary” urban areas, nonetheless, slowly
sanitation (WDI 2015).5* In urban areas, caught up in the past decade, while it had
shared facilities are common. The 2012 been gradually decreasing in Port-au-Prince.
DES indicates that 48 percent of residents Differences between urban and rural areas
in Port-au-Prince and 41 percent of house- are more striking, with access in rural areas
holds in second-tier urban agglomerations being as low as 15 percent.
use pit latrines with slab.5? At least 8 percent Despite coverage in urban areas being
of urban residents practice open defeca- above 50 percent, Haïti has one of the lowest
tion (WDI 2015), and research suggests that electricity consumption rates worldwide.
this figure may be higher given that urban At the beginning of 2010, despite heavily
residents that rely on public toilets may resort subsidized residential tariffs, the per capita
to open defecation to meet sanitation needs electricity consumption was equal to 51 kWh,
& Improved sanitation facilities include non-shared toilets flushing to piped sewer system, to pit latrine, and to septic tank, pit
latrines improved by ventilation or with slab, and composting toilet. The overall access rates in Haiti are 50 p.p. lower than
the average country in the LAC region and 5 p.p. lower than the average low-income country.
& Pit latrine with slab is a dry pit latrine whereby the pit is fully covered by a slab or platform that is fitted either with a squatting
hole or seat. The platform should be solid and can be made of any type of material (concrete, logs with earth or mud, cement,
etc.) as long as it adequately covers the pit without exposing the pit contents other than through the squatting hole or seat.
a
[page 58]
ACCESS TO WATER AND SANITATION
(A) Access to sources of drinking-water, by place (B) Access to sanitation services
of residence
2000 Nm 21000
ë 90% DS CN CS CS COR DS D ON 5 90% us un un un un ue nu
È ë
= 80% = = um nm Ë 80% on on
ë È
5 70% SR OS > 70% so on on on on
8 8
8 60% == & 60% me ee mm mm mn
8 8
CE = == = S 500 mm me me ee ee mn
= =
= =
5 40% & 40%
È $
30% S 30% = ==
Z 20% Ÿ 20% = = =
ë 5
£ =
$ 10% $ 10% =
0% 0%
‘oo ‘o6 ‘12 ‘oo ‘o6 ‘12 ‘oo ‘06 ‘12 ‘12 ‘oo ‘06 ‘12 ‘oo ‘06 ‘12 ‘00 ‘06 ‘12 ‘12
713 Other Rural Camps PaP Other Rural Camps
Cities Areas Cities Areas
Unimproved sources of drinking-water Unimproved sanitation
Bottled water or sold by company Shared improved sanitation
EM Improved sources of drinking-water EM Improved sanitation not shared
Source: DHS 2000, 2006, 2012
forty times lower than the LAC average. megawatts (MW), outdated and deteriorated
Under-consumption is notably driven by the equipment constrain the available capacity to
shortages in the supply, monopolized by the only 244 MW.
public provider, Electricité d’Haiti (EDH). Low access to electricity cripples local urban
For those who have a connection, electricity is productivity. In large urban areas, obtaining
available only at limited times during the day: an electric connection for businesses is very
about 15 hours in Port-au-Prince, and between costly. Since 2009, tariffs for industrial and
5 to 9 hours elsewhere, on average. While the commercial consumers (especially the indus-
installed capacity ranges between 250 and 400 trial and transportation sectors) cost USD 0.36,
3 Lucky et al. (2014) discuss the electricity market in Haïti in further details. Concerning the residential tariffs, Haiti has the
third lowest ones (USD 0.16 per kWh, on average) compared to other Caribbean country pairs: Trinidad (USD 0.5), Suriname,
Dominican Republic, Nevis, Belize, St. Lucia, Bahamas, Guyana, Barbados, St. Kitts, St. Vincent, Grenada, Dominica,
Jamaica, Antigua (USD 0.37). Data come from the World Development Indicators.
[page 59]
BOX 4 — BAYAKOU: À SCORNED YET VITAL JOB WHEN SANITATION INFRASTRUC-
TURE SANITATION IS LACKING
Among Haitian households without access to working sewers, only a few can afford to dig cesspools in their
backyards for collection and disposal of human waste. Once every year or so, these households hire informal
laborers known as bayakou to come in the middle of the night to empty these cesspools. Bayakou, then, play
a key role in the functioning of cities in the absence of sewerage infrastructure. Keeping human waste out of
water bodies and crops is crucial to avoid the spreading of infectious diseases; when lacking proper sanitation
services, bayakou are the only way to keep households safe.
To hire a bayakou, a homeowner must first negotiate with a middleman, who is in charge of arranging the
assignment. During the following nights, a team of two or three bayakou enters the homeowner’s backyard
and pours a bottle of floor cleaner into the cesspool in order to soften the excrement and cut the smell. Once
the floor-cleaning solvent has soaked, one member of the team climbs into the latrine and scoops out the
human waste with a bucket. Usually, workers carrying out this activity are not wearing any clothes, making
them exposed to possible cuts and injuries and thereby infections. There are no designated safe areas to dispose
of the human waste, so bayakou usually dump it on the ground, in ravines, or in rivers. This only transfers the
risk and exposure to disease from one area to another.
According to some estimates, a bayakou team can empty a fifty-cubic-metre cesspool in two to three nights.
In spite of its reputation and danger entailed, the job can be financially attractive to many: through the inter-
mediary, a bayakou can make just over 3,000 HTG (about USD53, using the official exchange rate of 1 HTG =
USD 0.016 as of August 31, 2017) per latrine - the equivalent of a month's salary sewing T-shirts in a garment
factory. To partially solve for bayakou’s precariousness and possible environmental costs, some aid groups have
entered the market and have been hiring them, introducing some minimum safety standards, and overseeing
their work directly. The National Drinking Water and Sanitation Directorate (DINEPA) has also been running
public health programs directed to training bayakou and testing small pumps.
Sources: Curnutte, 2011; Katz, 2014; Wilentz, 2010; and discussions with the Inter-Ministerial Committee for Territorial Devel-
opment and DINEPA.
on the higher end of the Caribbean distribu- Costly procedures to access to electricity
tion. The ineffective provision by EDH in its affects the business environment and job
grids, moreover, prompts many factories and creation in the secondary and tertiary sector.5s
businesses to generate electricity with their
own private diesel and polluting generators,
further inflating their production costs and
the import of fuels.54
# See Lucky et al. (2014) and the 2016 Doing Business index for more detailed data.
5 The secondary sector includes garment factories and other manufacturing activities. The tertiary sector is made of all
transport, touristic, and financial services, and - most of all - trade activities.
43
[page 60]
REVIEWING THE CHALLENGES AHEAD . . . Loue .
policymakers identify priorities for invest-
Today, as Haïtian policymakers begin ments from a jobs perspective. Hence, a
to shift their focus from addressing the good understanding of how workers move
challenges of reconstruction to planning for in and around the largest cities, how acces-
a brighter, more resilient and sustainable sible jobs are, and what are the most critical
future, a better understanding of the key road segments to ensure job accessibility is
bottlenecks that are driving crowding and not affected in the event of a disaster, can
the economic stagnation of cities in Haiti provide valuable information for evidence-
is needed. This chapter has highlighted based decision making. This is the focus of
the key challenges that the urban system Chapter 3.
faces today. First, it examined the difficul- But to address the key infrastructure
ties brought by high population density bottlenecks that cities face today, and
and limited infrastructure in Haïitian cities. prepare to build resilient cities for a brighter
Urban areas in Haïti today are crowded and future, strengthening cities’ financing mecha-
growing in an uncoordinated manner, with nisms will be essential. Chapter 4 explores
insufficient regard to risks. Second, despite the key bottlenecks that municipalities face
population density, cities are not generating in financing their needs. Cities must be
economies of agglomeration nor becoming equipped with the financial tools and means
centers of economic growth. Instead, infor- to ensure they can respond to the increasing
mality and poverty prevail. Third, cities demand for infrastructure and services.
are growing with limited service provision, Governance and institutional arrangements
which coupled with the growing population on the structure of local finances can either
densities, are consumed by the negative strengthen or weaken the tools that munici-
effects brought by the concentration of palities have at hand to respond to urbaniza-
people and prevent them from leveraging tion pressures. This final chapter provides an
the potential economic benefits that such overview of municipal finances in Haïti and
concentration can bring. charts a road of action that can help build
Better planning for resilient cities can local financial sustainability.
help address current deficits and prepare
for future urban growth. Chapter 2 explores
how land management and coordinated
decision making can help address the needs
of today while looking for ways to unleash
the potential of cities in the future. But
for economic activity to thrive in Haitian
cities, connecting people to jobs, and firms to
input and output markets, will be essential.
À better-integrated labor market can help
match talent and skills with enterprises’
needs. Identifying the key challenges
related to within-city connectivity can help
44
[page 61]
REFERENCES
Aisen, A., and F.J. Veiga. 2013. How does from Indian districts. The World Bank
political instability affect economic Economic Review.
growth? European Journal of Political Cayemittes, M., M. Fatuma Busangu, J. de
Economy, 29, 151-167. Dieu Bizimana, B. Barrère, B. Sévère,
Annez, P., and R.M. Buckley. 2009. Urbaniza- V. Cayemittes, and E. Charles. 2013.
tion and growth: setting the context. In Enquête Mortalité, Morbidité et Utilisa-
M. Spence, P. Annez, and KR. M. Buckley, tion des Services, Haïti, 2012. Calverton,
Urbanization and growth (pp. 1-45). Maryland, USA: Ministère de la Santé
Washington, D.C.: The World Bank. Publique et de la Population - MSPP/
Azevedo, J. P., G. Inchauste, S. Olivieri, J. Haïti , l’Institut Haïtien de l'Enfance -
Saavedra, and H. Winkler. 2013. Is labor IHE, and ICF International. Retrieved
income responsible for poverty reduction? from http://dhsprogram.com/publica-
À decomposition approach. World Bank tions/publication-FR273-DHS-Final-Re-
Policy Research Working Paper 6414. ports.cfm#sthash.bJDEmHEAa.dpuf
Bengtsson, L., X. Lu, À. Thorson, R. Garfield, Chahnazarian, À. 1992. Hausse récente de
and J. Von Schreeb. 2011. Improved la fécondité en Haïti: un nouvel engoue-
response to disasters and outbreaks by ment pour la vie en union? Population,
tracking population movements with 473), 583-616.
mobile phone network data: a post-earth- Christianen, L., J. De Weerdt, and Y.
quake geospatial study in Haiti. PLoS Todo. 2013. Urbanization and poverty
Med, 8(8). reduction: the role of rural diversifica-
Berdegué, J. À. J. Escobal, and À. Bebbington. tion and secondary towns. Agricultural
2015. Explaining spatial diversity in Latin Economics, 44(4-5), 435-447.
American Rural Development: Struc- Curnutte, M. 2011. À Promise in Haiti: À
tures, institutions, and coalitions. 73, Reporters Notes on Families and Daily
129-137. Lives. Vanderbilt University Press.
Brault, J-M., Z. Sanz Uriarte, and B.J. Le Daniell, J. E., B. Khazai, and F. Wenzel.
Bansais. 2014. Delivering' water supply and 2013. Uncovering the 2010 Haiti earth-
sanitation services in fragile states: profes- quake death toll. Natural Hazards and
sionalizing drinking water service delivery Earth System Sciences Discussions, 1(3),
in small towns of Haiti. Water and sanita- 1913-1942.
tion program field note. Washington, D.C.: Deuskar, C., B.P. Stewart, and N. Lozano-
World Bank Group. Gracia. 2016. Defining urban areas in
Busso, M., and L. Madrigal. 2013. Produc- Haiti. Mimeo. Washington D.C.: World
tivity and resource misallocation in Bank.
Latin America. The BE Journal of Macro- Dijkstra, L., and H. Poelman. 2014. À
economics, 13(1), 903-932. harmonised definition of cities and rural
Cali, M., and C. Menon. 2012. Does urban- areas: the new degree of urbanisation,
ization affect rural poverty? Evidence European Commission (No. 01). Regional
45
[page 62]
Policy Working Papers. bution of economic activity. The Open
Dorosh, P., and J. Thurlow. 2014. Can cities Geography Journal, 31).
or towns drive African development? Gollin, D., R. Jedwab, and D. Volirath. 2016.
Economywide analysis for Ethiopia and Urbanization with and without Indus-
Uganda. World Development, 63, 113-123. trialization. Journal of Economic Growth,
Dorvilier, F. 2010. Les causes de la crise de la 21(1), 35-70.
transition démographique en Haïti: une Green, M., and D. Hulme. 2005. From
analyse néo-institutionnelle. Centre de correlates and characteristics to causes:
recherches en Démographie et Sociétés, 1-28. Thinking about poverty from a chronic
The Economist Intelligence Unit 2016. Haiti poverty perspective. World Development,
Country Report. 33(6), 867-870.
Ellison, G., E.L. Glaeser, and W.R. Kerr. Henderson, J., A. Storeygard, and D.N. Weil.
2010. What causes industry agglomer- 2012. Measuring economic growth from
ation? Evidence from coagglomeration outer space. American Economic Review
patterns. The American Economic Review, 102(2), 994-1028.
100(3), 1195-1213. Hornbeck, J. F. 2011. The Haitian Economy
Feler, L., and J. Henderson. 2008. Exclu- and the HOPE act. Current Politics and
sionary policies in urban development: Economics of South and Central America,
How under-servicing of migrant house- 4G), 565.
holds affects the growth and composition Hsieh, C-T., and E. Moretti. 2015. Why do
of Brazilian cities. National Bureau of cities matter? Local growth and aggregate
Economic Research No. w14136. growth. National Bureau of Economic
Flowminder Foundation, Digicel Haiti, and Research Working Paper, No. w21154.
World Food Programme. 2016. Haiti: Hulme, D., and D. Shepherd. 2003. Concep-
Hurricane Matthew. Estimated Population tualizing chronic poverty. World develop-
Movements as of 22 November 2016. Mimeo. ment, 31(3), 403-423.
Freire, S., K. MacManus, M. Pesaresi, E. IMEF. 2015. Haiti. IMF Country Report No.
Doxsey-Whitfield, and J. Mills. 2016. 15/158, Washington D.C.
Development of new open and free Institut Haïtien de Statistique et d’Informa-
multi-temporal global population grids tique. 2015. Population totale, population
at 250 m resolution. Proceedings of 19th de 18 ans et plus, ménages et densités estimés
AGILE Conference on Geographic Informa- en 2015. Retrieved from http://www.
tion Science . Helsinki. ihsi.ht/pdf/projection/Estimat PopTo-
Gelting, R., K. Bliss, P. Molly, G. Lockhart, tal 18ans Menag2o15.pdf
and T. Handzel. 2013. Water, sanitation Jedwab, R. 2013. Urbanization without struc-
and hygiene in Haïti: Past, present, and tural transformation: Evidence from
future. The American journal of tropical consumption cities in Africa. Working
medicine and hygiene, 89(4), 665-670. paper . Washington, D.C.: George
Ghosh, T., R.L. Powell, C.D. Elvidge, K.E. Washington University.
Baugh, P.C. Sutton, and S. Anderson. Katz, J. (2014, March 12). Haitis shadow
2010. Shedding light on the global distri- sanitation system. The New Yorker.
46
[page 63]
Retrieved from http:/www.newyorker. Perge, E., G. Fleurantin, C. Kiyomi, M.
com/tech/elements/haitis-shadow-sani- Muller, and ©. Calvo-Gonzalez. 2016.
tation-system Haiti - Poverty and Equity Note #2. World
Kolbe, A.R., R.A. Hutson, H. Shannon, E. Bank.
Trzcinski, B. Miles, N. Levitz, M. Puccio, Philippe, F., and M. Culot. 2009. Household
L. James, J.R. Noel, and R. Muggah. solid waste generation and character-
2010. Mortality, crime and access to istics in Cape Haitian city, Republic
basic needs before and after the Haiti of Haiti. Resources, Conservation and
earthquake: a random survey of Port-au- Recycling, 54(2), 73-78.
Prince households. Medicine, conflict and Putnam, R. D., R. Leonardi, and R.Y. Nanetti.
survival, 26(4), pp.281-297. 1994. Making democracy work: Civic tradi-
Krugman, P. 1991. Increasing returns and tions in modern Italy. Princeton University
economic geography. Journal of political Press.
economy, 99(3), 483-499. Ravaillon, M., S. Chen, and P. Sangraula.
Lall, S. V. 2013. Planning, Connecting, and 2007. New evidence on the urbanization
Financing Cities—Now: Priorities for City of global poverty. Population and Develop-
Leaders. Washington D.C.: World Bank ment Review, 33(4), 667-701.
Publications. Rodrik, D. 2013. Unconditional convergence
Lucky, M., K. Auth, À. Ochs, X. Fu-Ber- in manufacturing. The Quarterly Journal
taux, M. Weber, M. Konold, and J. Lu. of Economics, 128(1), 165-204.
2014. Haiti Sustainable Energy Roadmap: Saint-Macary, C., and C. Zanuso. 2016. Build
Harnessing Domestic Energy Resources back better? Long-lasting impact of the
to Build an À ordable, Reliable, and 2010 Earthquake in Haiti. Working paper.
Climate-Compatible Electricity System. Satterthwaite, D. 2007. Adapting to climate
Washington, D.C.: Worldwatch Institute. change in urban areas: the possibilities
Maynard-Tucker, G. 1971. Unions, Fertility, and constraints in low-and middle-income
and the Quest for Survival. Social Science nations (Vol. 1).2"ded.
& Medicine, 43(9), 1181. Scot, T., and A-$S. Rodella. 2016. Sifting
Matera, M., O.A. Ishizawa, R. Van del Borght, through the Data: labor markets in Haïti
E. Nsimba, I. Simon, W. Dorsaint, and through a turbulent decade (2001-2012).
R. Surin. 2016. Diagnostic sur l’Impact Policy Research working paper no. WPS
Économique et Budgétaire des Désastres 7562. Washington, D.C.: World Bank
en Haïti. World Bank. Group.
Moomaw, R., and M.A. Alwosabi. 2004. An Singh, R. J., and M.A. Barton-Dock. 2014.
empirical analysis of competing expla- Haiti. Toward a new narrative: systematic
nations of urban primacy evidence from country diagnostic. Washington, D.C.:
Asia and the Americas. The Annals of World Bank Group.
Regional Science, 38(1), 149-171. Singh, R. J., and M.A. Barton-Dock. 2015.
Perge, E., and T. Scot. 2016. Vulnerability Haiti - Toward a new narrative: systematic
and Poverty in Haiti. Mimeo. Washington country diagnostic. Washington, D.C.:
D.C.: World Bank. World Bank Group.
47
[page 64]
Singh, R., C. Bodea, and M. Higashijima. nytimes.com/2010/11/26/opinion/26wi-
2016. Guns, books, or doctors? Conflict lentz.html
and public spending in Haiti: lessons World Bank. 1985. Haïti - Policy proposals for
from cross-country evidence. Policy growth.
Research working paper no. WPS 7681. ———. 1998. Haïti - The challenges of poverty
Washington, D.C.: World Bank Group. reduction.
Tobin, K. A. 2013. Population density and ———. 2007. Social Resilience and State
housing in Port-au-Prince: historical Fragility in Haiti. Washington, DC: World
construction of vulnerability. Journal of Bank.
Urban History, 39(6), 1045-1061. ———. 2009. World Development Report 2009:
Tilmans, S., K. Russel, KR. Sklar, L. Page, Reshaping Economic Geography.
S. Kramer, and J. Davis. 2015. Contain- ———. 2010. Haïti earthquake PDNA (Post-Di-
er-Based Sanitation: Assessing Costs and saster Needs Assessment) : assessment of
Effectiveness of Excreta Management damage, losses, general and sectoral needs.
in Cap-Haïtien, Haïti. Environment & Washington, DC: World Bank.
Urbanization 27(1): 89-104. ———. 2015. Country Partnership Framework
United Nations. 2014. World Urbanization for the Republic of Haiti for the Period
Prospects: The 2014 Revision. Department FY16-FY19. Washington, DC: World
of Economic and Social Affairs, Popula- Bank...
tion Division. ———. 2016. Better Spending, Better Services:
UNFPA-Haiti. 2010. Enquete sur les migra- À Review of Public Finances in Haïti,
tions internes: phase I: Aire metropol- Overview. Washington, DC: The World
itaine de Port-au-Prince, draft report. Bank Group.
Port-au-Prince: UNFPA-Haiti. WTO. 2015. Trade Policy Review: Haiti. World
USAID. 2010. Housing for Haïitis Middle Class. Trade Organization.
Post-Earthquake Diagnosis and Strategy. Yarrington, L. 2015. The Paved and the
Washington D.C. Unpaved: Toward a Political Economy of
USAID. 2011. Feed the Future Strategy for Infrastructure, Mobility, and Urbaniza-
USAID in Haiti (Fiscal Years 2011-2015). tion in Haiti. Economic Anthropology, 2(1),
Washington D.C. 185-204.
Vakis, R., J. Rigolini, and L. Lucchetti. Zéphyr, D., A. Cérdova, H. Salgado, and
2016. Left behind: chronic poverty in M.A. Seligson. 2011. Haïti en détresse:
Latin America and the Caribbean. World impact du séisme de 2010 sur la vie et les
Bank Publications. opinions des citoyens. Nous.
Walsh, B. M. 2000. Urbanization and the
regional distribution of population in
post-famine Ireland. Journal of European
economic history, 29(1), 109.
Wilentz, A. (2010, November 25). In Haiti,
waiting for the Grand Bayakou. The New
York Times. Retrieved from http://www.
48
[page 65]
SPOTLIGHT 1: WHAT IS URBAN AND WHAT
IS AT RISK
Sarah E. Antos*
Urban definitions can vary widely from one country to another. But how urban areas are defined
can impact a broad range of issues that span from our understanding of the evolution of a country
and its cities to the investment decisions that a country takes. Hence, understanding “what is
urban” and what is not is of great importance, as it can influence the decisions that are taken today
in terms of basic service provision, education, and health, among others.
But defining what is urban is not an easy task in a country like Haiti. While the census has
historically divided the country into urban and rural enumeration areas, the criteria used for
such classification are not clearly recorded in official documents. Even if such criteria were better
documented, they would be outdated today, given they were made during the last census in 2003.
Alternative methods that do not rely on population measures but rather on observation of built-up
area can be an alternative to circumvent these challenges. Lastly, comparison of urbanization
rates across countries is also challenging because each country uses its own criteria, so finding
a common definition across countries can help in benchmarking Haiti’s urbanization process to
that of its Latin American peers.
For this report, we apply three alternative methods to reach a better assessment of what is
urban today in Haïti. Details of the approach used in these three different methodologies are
provided in Box 1. The results are a definition of urbanization levels that is comparable with
other countries across the LAC region, irrespective of differences between countries’ own
national definitions of urban.”
Our analysis suggests that as much as 64 percent of the population lives in urban areas, making
Haiti one of the most urbanized countries in the LAC region. Using a cut-off point of 5,000 people
as the minimum threshold to identify an urban cluster, we estimate the urban population of
Haiti to be around 6,179,000 people. This is equivalent to 64 percent of the total population, and
is higher than the Institut Haïtien de Statistique et Informatique’s (IHSI) estimate for 2015 (52
percent) and slightly higher than the UN World Urbanization Prospects (UN WUP) estimate for
2015 (57 percent).
: The challenges arising from using these conflicting definitions for comparison between countries or for global aggregation
of data are not unique to Haiti and have been widely discussed in previous work (Satterthwaite, 2007; World Bank, 2009;
Dijkstra and Poelman, 2014).
*The spatial analysis was led by Sarah E. Antos but relied heavily on analysis performed by Nancy Lozano-Gracia, Chandan
Dueskar, and Benjamin P. Stewart. Furthermore, the section benefited from the valuable support of Lauren Nicole Dauphin
and Katie McWilliams as well as data generously provided by the DLR Earth Observation Center, the Global Facility for
Disaster Reduction and Recovery (GFDRR) and Haitis National Center for Geospatial Information (CNIGS).
49
[page 66]
Furthermore, more than half of this urban population (36 percent of the total population) lives
in high-density clusters. High-density clusters are groups of contiguous cells with more than
50,000 people and with more than 1,500 people per sq. km. Figure 2 provides a detailed overview
of the share of population in urban clusters, compared with other Latin American and Caribbean
countries, based on our estimations. The share of urban population as reported by the UN WUP
is also reported for comparison.
À look at the system of cities suggests that while Port-au-Prince dominates the Haïitian urban
system, there are six other sizeable cities in the country. À full list of classification of cities based
on the gridded population data is provided in Annex 1. The results indicate that 40 percent of
HAITI - URBAN AND HIGH-DENSITY CLUSTERS USING THE EUROPEAN
COMMISSION'S METHODOLOGY ON WORLDPOP DATA (2015)
! Legend
LC] Urban cluster à 4 ns, ”
BR tion density æ, ge x Mg te. fu
urban cluster à e + je
de
Bar » 6e La "
# +,
es “ i
LT ÆE 4 * x de
Source: World Bank analysis using WorldPop data
[page 67]
the population in cities is located in the metro area of Port-au-Prince. The second largest city
is Cap-Haïtien in the Nord département. Other large cities include and Léogane in the Ouest
département. Gonaïves, Saint-Marc and Dessalines, each with over 200,000 individuals. Over
19 percent of the population is located in cities between 100,000 and 300,000 inhabitants.
Medium and small-size cities, with respective populations of 50,000-100,000 and 10,000-
50,000, have shown positive growth since 1990, with some cities averaging between 8 and 9
percent of growth each year.
PROPORTION OF POPULATION IN HIGH-DENSITY AND URBAN
CLUSTERS (WORLDPOP VS. UN WUP URBANIZATION RATE)
00%
%EITIBTEOIIIIIIIIOIRIT
ON ERRREREREREINSRENENENSENEE
D FERRECISTIRENREELIRENINNE
MU EERERERERERENEEIEIREIRENEE
ERESSRRECIRRERERENENÉENRESE
AN EESSSSSENENENENENENENNNNE
PU ERRERERERERERERENRENENEEREER
PE ERRESRERERERERRSRRRERENENER
PU ERREREREREREREREEREERENENER
PN EIRRREREREREREREEEEENENENER
o = 48 6 > gs 2 R 5 2 É 5 SOL SOS 8 s 5 > 2 s €
25345011 02416 056 5 4 2:
CR SO à = 2 $S © £ © O 2 € S à $ £ à
- s © =
EN High Density EH Urban EM Rural Grid UN WUP
Clusters Clusters Cells Urbanization Rate
Source: Deuskar, Stewart, and Lozano-Gracia (2016) based on WorldPop (2015 data), European Commission thresholds for
urban areas, and UN World Urbanization Prospects (2015).
[page 68]
BOX 1 - THREE METHODS TO ESTIMATE URBAN AREAS
This work compares the results obtained from three alternative methods for identifying “what is urban”
in Haiti. The results of these three different measures or proxies for level of urbanization for most communal
sections in the country, allowing comparisons in cases where there are discrepancies between the three
methodologies. The steps followed for each of the methods used are outlined below.
The first methodology involves updating the IHSI classification of communal sections into five classes,
based on the proportion of each communal section’s population that is classified as urban in IHSPs 2015
population projections. The data is extracted from the IHSI publication, available online (Institut Haïtien de
Statistique et d'Informatique, 2015). This classification follows the scheme previously used by IHSI on 2003
census data, in which the level of urbanization of a communal section is defined either as très fort if 75-100
percent of its population is recorded as urban, fort (50-75 percent), moyen (25-50 percent), faible (10-25 percent),
or très faible (0-25 percent). The assignment of each communal section to an urban class provides the official
characterization of urban areas in Haïti. This is “what is urban” according to official statistics.
À second methodology uses WorldPop high-resolution census data to model population at a 100x100 meters
grid cell resolution.? These data rely on the 2009 demographic estimations by the IHSI, combined with a wide
range of other sources, including data on built-up areas, topography, and locations of hospitals and schools. We
then use the European Commission’s (EC) “degree of urbanization” approach, which applies population size
and population density thresholds to the above gridded population data. We first identify cells with a popula-
tion density higher than 300 people per sq. km, group them into clusters of contiguous cells, and define those
clusters with more than 2,000 or 5,000 people as “urban clusters,” depending on the threshold. Those with
more than 50,000 people and made of cells with more than 1,500 people per sq. km are labeled as “high-den-
sity clusters.” The third methodology uses data on built-up area, a proxy for urbanization that does not rely
on census data. We combine the Global Human Settlements Layer (GHSL) and the Global Urban Footprints
(GUF) layer. GHSL is produced by the EC's Joint Research Center (JRO) and is based on optical imagery
(LandSat); it provides an historical perspective over the proportion of the area of communal sections that were
built-up.3 The GUF is based on radar data from satellites, with 84m resolution, and is therefore more accurate.
Provided that the GUF is only available for circa 2011-2012, a combination of GHSL and GUF will provide a
conservative estimate of built-up areas in Haïti, rather than a comprehensive one. These results are sensitive
to the empirical methodologies, data, and assumptions used, and should therefore be taken with caution.
However, the analysis confirms that Haïti is significantly urbanized, and that estimates of “what is urban”
leveraging on high-resolution data can allow a more informed conversation about urbanization in Haiti. The
results from these methodologies should be taken as an effort to have a better understanding of what is urban
in Haïti and not as a final count of urban population. Ultimately, there is no substitute for a good census.
Sources: Tobin (2013), Yarrington (2015).
? Full metadata on the WorldPop Haiti layer can be found online at http:/www.worldpop.org.uk/data/WorldPop data/AllCon-
tinents/HTI-POP metadata.html.
3 Full GHSL dataset can be retrieved at http://ghslsys.jre.ec.europa.eu. GUF data can be browsed and requested at http://www.
dir.de/eoc/en/desktopdefault.aspx/tabid-0628/16557 read-40454/.
52
[page 69]
GROWTH OF BUILT-UP AREA IN HAITI, 1975-2015
2 OO
350
300
g 250
=
& 200
5 150
<
100
50
oO
1975 1990 2000 2015
Year Built-up Area was Measured
En Other Regions BH Artibonite ή Nord M Ouest
Note: Data from 2015 is from the 2015 GUF, while all other data is from GHSL trimmed with the 2015 GUF.®
Source: Authors’ calculations.
As the urban population has grown, so too has the extent of the built-up land area. The analysis
indicates that built-up area in Haïti roughly quadrupled between 1975 and 2015 (Figure 3). Between
1975 and 1990 only, the land area expanded an average annual growth rate of 5.1 percent, doubling
from 87 sq. km. The growth rate slowed, as would be expected given the larger base. The built-up
areas grew at an average rate of 1.4 percent a year between 1990 and 2000, and then at an average
of 0.8 percent a year until 2015 when the total urban land area reached 363.6 sq. km. The majority
of the built up area is concentrated in the Ouest départment. In keeping with population distribu-
tion, nearly 53 percent (192.5 sq km) of the total built-up area in the country was concentrated in
that départment as of 2015. Artibonite and the Nord follow with 152.6 sq. km. of built-up area (14.5
percent of Haiti’s built-up area) and 28.7 sq. km. (9 percent of Haïiti’s built-up area) respectively.
8 Marconcini, M. S. Üreyen, T. Esch, A. Metz, J. Zeidler, and D. Palacios-Lopez. 2017. “Outlining the urban side of the Earth -
the GUF+2015,” Scientific Data (in preparation).
[page 70]
But the way cities expand also has important implications for resilience: the analysis for
this report suggests that the majority of land in and around urban areas is highly exposed to
multiple hazards.4 Analysis of satellite data indicates that 94 percent of built-up areas in 2011
are considerably vulnerable to earthquakes.$ Nearly all of the land area of Haïti (97 percent) is
exposed to “medium” or “high” seismic hazard, but built-up areas are disproportionately concen-
trated in high seismic hazard zones.f Seismic hazard exposure is a particularly serious problem
in Nord-Est, Nord, and Ouest départements,7 but the majority of land in cities of all sizes - from
Port-au-Prince and Cap-Haïtien to smaller cities like Ounaminthe, Mirebalais, Fort-Liberté, and
Léogâne - are considered high risk. The widespread nature of this risk underlines the importance
of incorporating mitigation methods into all urban construction and infrastructure development.
This is discussed further in Chapters 2 and 3.
Exposure to erosion and landslides is increasing as urban growth continues to occur in high-risk
areas. Overall, we estimated that 58 percent of built-up areas are at risk from flood events ?, and 24.2
percent are exposed to elevated, serious, or very serious erosion." Total built-up area exposed to
4 Spatial data on exposure to natural hazards (earthquake, flooding, landslides, and soil erosion) was obtained from the Haiti Data
website (www.haitidata.org), an online repository of spatial information for Haiti. These layers are available only at one point in
time; thus, in this analysis we must assume that the level of exposure to hazards is static over the time period being evaluated. The
combined layer was then intersected with the various risk layers listed above to find the built-up area exposed to risk in each year. When
the input risk layer is a vector layer (flood, erosion), the resulting output layer has the same resolution as the combined built-up layer
(84m). When the input risk layer is a raster layer, the resulting output layer will have the lower resolution of the two layers used as input.
5 This raster layer shows the 2 percent probabilities of exceedance in 50 years of a given peak ground acceleration (PGA, color coded,
from o to 180 = 1.8g), taking into account the soil amplification. The 50-year period corresponds to the average life span of a
building. À 2 percent probability over 50 years is equivalent to an annual probability of 1/2,5000. The probable ground acceleration
levels have been converted into Modified Mercalli Intensities, in accordance with the criteria established by the USGS project
known as Shakemap (http://earthquake.usgs.gov/eqcenter/shakemap/). Potential damage ranges from zero to moderate for inten-
sities 1 to 5 (maximum PGA of 0.092 g), from strong to very strong for intensities 6 to 7 (maximum PGA of 0.34), and from severe to
extreme for intensities 8 and above. Categorization thus helps identify three areas of seismic hazard for Haiti: low, moderate, high.
The influence of Haitis most important identified tectonic fault is clear, particularly the Presquîle du Sud Fault, where intensities
might reach at least 9 degrees. Most of the territory is exposed to intensities of at least 6 degrees. It was created by the NATHAT
Project, in May, 2010.” http:/haitidata.org/layers/cnigs.spatialdata:hti hazardseismic intensitymodified2percentprob rastero062010
sWhile only 33 percent of the country faces high seismic risk and 65 percent faces medium risk, 60 percent of the built-up
areas are actually in the high-risk zones compared to 34 percent in medium-risk zones.
7Where 87, 79, and 76 percent of built-up areas face high seismic risk. Only 31, 13, and 60 percent of their total land areas are prone
to high seismic risk, which again indicates that their built-up area is disproportionately concentrated in the riskiest zones.
5 Three separate layers were used, showing “probable” and “propitious” (potential) flood zones as polygons, as well as “frequent” flood zones
(only for Port-au-Prince): (i) Probable flood zones: “This map layer shows Haïiti's region of probable (frequent) flooding. It was created by
NATHAT Project, using Google Maps, digital terrain models, and field observations, in May 2010”; (ii) Propitious flood zones: “This polygon
vector layer shows areas of propitious flood areas for Haïti. It was created by United Nations Institute for Training and Research (UNITAR),
in May 2010”; (ïi) Frequent flood zones: “This map layer models areas of frequent flooding for Port-au-Prince region. It was created by
United Nations Institute for Training and Research (UNITAR), in May 2010” (Not available for the rest of Haïti). See Haitidata.org.
°“This polygon vector layer shows Haitis areas most susceptible to erosion.…It is taken at a 1:300,000 scale. It was created by the ‘Secrétairerie
d'Etat au Plan’ and CNIGS in April, 1998.” http:/haitidata.org/layers/cnigs.spatialdata:hti environment erosion polygon 042008
: Three separate layers were used, showing “probable” and “propitious” (potential) flood zones as polygons, as well as “frequent” flood zones
(only for Port-au-Prince): (i) Probable flood zones: “This map layer shows Haïiti's region of probable (frequent) flooding. It was created by
54
[page 71]
PORT-AU-PRINCE EROSION AND FLOOD RISK
(A) Erosion risk and built-up areas in (B) Flood risk and built-up areas in
Port-au-Prince Port-au-Prince
Erosion Risk Fr! A Flooding Risk ip) ;
D Very Serious Par, EM Frequent JR : 4
Serious Re. sut Probable æ pee
Elevated % Potential TRS ;
I suitt-up (GUF 2015) CRE < z M suittup (GUF 2015) ET. 2
? v ;, LS ë mL . 7.
Se 2" oo rm 2 4 mn
PEAL PR ARTE. - ya PR RE 2 -
* _ NC ea
- Es, RD CL 2 po 1
9 En” / 10 Kilometers de ” À 2 4 o 5 10 Kilomoters
ee SEK, 21 TT SE + nt "1
Sources: NATHAT, DLR, JRC Sources: UNITAR, NATHAT, DLR, JRC
floods increased from 122 sq. km in 2000 to 211 sq. km in 2015. In 2000 51.4 sq. km were exposed to
elevated, serious, or very serious erosion, and in 2015 it has increased to 87.2 sq. km ofbuilt-up areas
exposed. The amouvnt of built-up area exposed to medium, elevated, or high landslide suscepti-
bility increased from 8.8 to 22.7 sq. km. Within the cities, landslides tend to occur in irregular
neighborhoods where buildings have been precariously constructed on steep slopes. Indeed, it is
worth noting that in Port-au-Prince, there have been 11 major liquification incidents since 1994.
Of those slides, only three did not take place in a zone deemed precarious by the National Center
for Geospatial Information (CNIGS) or in a neighborhoold classified as irregular by the imagery.
As the amount of built-up areas exposed to different natural hazards have steadily increased, so
has the number of people. In 2015, over 44 percent of the built-up area in the country is exposed
to at least one type of hazard, classified as “high exposure.” The total population at risk of “excep-
tional” floods in Haïti has increased approximately by 300,000 individuals, from 2.6 million to
NATHAT Project, using Google Maps, digital terrain models, and field observations, in May 2010”; (ii) Propitious flood zones: “This polygon
vector layer shows areas of propitious flood areas for Haïti. It was created by United Nations Institute for Training and Research (UNITAR),
in May 2010”; (ii) Frequent flood zones: “This map layer models areas of frequent flooding for Port-au-Prince region. It was created by
United Nations Institute for Training and Research (UNITAR), in May 2010” (Not available for the rest of Haïti). See Haitidata.org.
[page 72]
CAP-HAÏTIEN FLOOD AND EROSION RISK
(A) Erosion risk and built-up areas in (B) Flood risk and built-up areas in
Cap-Haïtien Cap-Haïtien
x Erosion Risk À Flooding Risk
+ 21 DIN Very Serious et à I serious to Very Serious
ar Serious EE Moderate to Serious
n Elovated + MM Suiitup (GUF 2015)
pe M suiit-up (GUF 2015) ÆS
« Et
-L 4 5 Ep: e_ dt ÿ CEA. P «it
PU. Pés . RC eV à EE : N PAR ru
Fo 1 + 2Kiomoter # AN. d- Ÿ 1; 2Kiomeer } s $
Sources: UNITAR, NATHAT, DLR, JRC Sources: CNIGS, DLR, JRC
2.9 million, between 2000 and 2015 (see Annex 2). With regards to erosion, the urban population
exposed to “elevated,” “serious,” and “very serious” erosion has increased from approximately
750,000 people to 1.12 million in the same 15-year period.
To better understand how urban growth intersects with risk exposure, an in-depth analysis of
landcover was conducted for Port-au-Prince and Cap-Haïtien. Imagery covering the city footprint
of Port-au-Prince and Cap-Haïtien was acquired at two different time periods. These high resolu-
tion (socm) scenes were then transformed into landcover maps. Further details on the classifica-
tion approach are provided in Spotlight 2.
The dominant risk in the Greater Port-au-Prince area is earthquakes, but flood risks and erosion
are also present. The majority of land (78 percent of built-up area in 2011) is exposed to high seismic
risk. Given that out of the total area within the boundaries of PaP, 66 percent is exposed to high
seismic risk, it is clear that built up intensity is higher in high-risk areas. This can be seen in Figure
4 (À). Built-up land is concentrated in flood-risk areas, given that one-third is at risk of floods (37
percent) compared with only 13 percent of the broader area. There is also a high proportion of
elevated erosion risk (27 percent of built-up area). The new areas of expansion in the north and east
of the city face flood risks (Figure 4 [B]). Overall, in PaP, 47 percent of the built-up area within s km
of the city center is exposed to at least one hazard (high exposure), while 59 percent of the built-up
land within 10 to 20 km of the city center is exposed. In Cap-Haïtien, the patterns are slightly
different: 73 percent of built-up areas within 3 km of the city center are in areas with high exposure
[page 73]
to at least one hazard, while only 14 percent of built-up land within 5 to 10 km of the city center
have the same level of exposure.
The analysis shows that residential growth in Cap-Haïtien continues to occur in high flood-
prone areas. Flooding is a recurrent problem in Cap-Haïtien, due to the frequency of overflowing
of the Haut du Cap river that traverses through the city and the river’s estuary (Bassin Rhodo).
Satellite images from December 12, 2005 and April 15, 2015 reveal high levels of inundation along
the southern and eastern side of the estuary. Despite this flooding at both time periods, construc-
tion of homes here continues. The figures below show the expansion of settlements into the Bassin
Rhodo estuary. Note that the dark land in the center of the 2015 image represents standing water,
and the white land in the south of both images represents areas that were previously inundated,
but now dry and left with dry dirt and sediment from the water.
Irregular growth is also occurring in areas that experience high exposure to erosion. Risk of erosion
in Cap-Haïtien is heavily concentrated in the north of the city. Figure 5 (A) shows the composition
of the buildings that have been built on land that is at high risk for erosion. Almost 50 percent of the
buildings located in high-risk erosion areas are located in an irregular neighborhood. This is propor-
tionally much higher than the cities’ overall percentage of 27 percent. The data can shed further light
on how urban areas change in response to natural disaster-induced shocks. It has long been expected
that disasters have shaped urban demography in Haiti. As discussed in Chapter 1, recent analysis
using mobile phone data has provided new insight on the number of people that were displaced in
the aftermath of the 2010 earthquake and Hurricane Matthew in 2016. Satellite data measurement
provides some new additional insights on these trends. For example, a comparison of images from
Port-au-Prince between 2007 and 2015 show that over such period, there was large new expansion in
the north, such as the area known as “Canaan” (discussed further in Spotlight 2). This area is itself
subject to high seismic risk.
Cities in Haïti are hence expanding and increasingly growing into risk areas. Information,
coordination, and investments are needed to guide development toward resilience. The expansion
of built-up areas presents both new opportunities and challenges for policymakers. On the one
hand, these areas can have positive dividends for growth, and firms and households can take
advantage of larger employment opportunities and access to goods (see Chapter 3). On the other
hand, there is a need for coordination among municipalities to manage this process effectively
and to take advantage of the potential economies of scale in providing basic services to these areas
(see Chapter 2). Further discussion of the pattern on growth within cities and agglomeration is
provided in Spotlight 2.
57
[page 74]
REFERENCES
Deuskar, C., B.P. Stewart, and N. Lozano-Gracia. 2016. Defining Urban Areas in Haiti. Mimeo.
Washington, DC: World Bank.
Dijkstra, L., and H. Poelman. 2014. À Harmonised Definition of Cities and Rural Areas: The New
Degree of Urbanisation, European Commission (No. 01). Regional Policy Working Papers.marcon
Institut Haïtien de Statistique et d'Informatique. 2015. Population totale, population de 18 ans et
plus, ménages et densités estimés en 2015. Retrieved from http://www.ihsi.ht/pdf/projection/
Estimat PopTotal 18ans Menag2o15.pdf
Marconcini, M., S. Üreyen, T. Esch, A. Metz, J. Zeidler, and D. Palacios-Lopez. “Outliningtheurban
side ofthe Earth - the GUF+2015”, Scientific Data (in preparation)
Satterthwaite, D. 2007. Adapting to Climate Change in Urban Areas: The Possibilities and Constraints
in Low- and Middle-Income Nations (Vol. 1). 2nd ed.
World Bank. 2009. World Development Report 2009: Reshaping Economic Geography.
58
[page 75]
[page 76]
[page 77]
MOVING FROM RECONSTRUCTION TO
RESILIENT URBAN PLANNING FOR A
BRIGHT FUTURE
Alexandra Panmian
Nancy Lozano-Gracia
and Claudia Soto*
[page 78]
: + "Fa. -
un ES : : ï
Te es 4 > ue” ; CP 7 .: S" Ra
à ep. # se 4À > ct T2 > z- æ
SMS CPR. Ne "9 PCR », 5
L. — .( he 7 et - on. Te è De Ed +
‘ . n eu - PRES ru = * pe” … 85% CPL © .
si 3 LL AD N— TE ME g
"} 7 - Hi} =
Fe 7 = Me «+ D. 22,2 J en s 2 ie & pers
Va jun Mébuce et, CL
— 1] 17 sas he nd |
—_ L nn“ .
- mé ! = n
MO ,, by en ni. = (
Re > vo! EL EP
een. - Rs RL —
* , De { , | =. “
+ Rares |
ra À ; es PORT-DE-PAIX, NORD-OUEST,
2 F =" . PHOTOGRAPHED BY DAVID MCINNIS, 2010
| FR Le = MMSOURCE: FLICKR, CREATIVE COMMONS LICENSE
> | à KQ 2
_ Led
Le + : —
[page 79]
CHAPTER 2 —- MOVING FROM RECONSTRUC-
TION TO RESILIENT URBAN PLANNING FOR
A BRIGHT FUTURE
WHY RESILIENT URBAN PLANNING? imagery. Às outlined in detail in Spotlights 1
Planning for resilient urbanization is about and 2, we use these new data to explore how
taking coordinated action to help shape urban areas have expanded over time, how land
urban growth, with the aim of supporting a use within cities has changed, and what the
country and cities’ development objectives and implications of these patterns of growth are for
managing natural disaster risk. As discussed exposure to natural hazard risk. We also review
in the previous chapter, the form that cities the current governance framework for urban
take can have very real impacts on urban planning in Haiti, noting important advances
productivity and livability. This form emerges made in recent years and the many challenges
from the interaction of decisions taken by that remain. The objective of this chapter is to
firms, households, and the government. Firms identify where the current weaknesses ofurban
decide where to produce, buy their inputs, and development lay and what is needed to build a
sell their outputs; households choose where brighter future for resilient cities.
to live and where to work; and governments There are three key findings and messages
make decisions that range from where to locate from this chapter. The first is that urban
infrastructure investments to defining zoning residents live in crowded, unserviced, and
regulations. Effective coordination of the unsafe housing and neighborhoods. There are
actions of these three actors is therefore key in many negative externalities associated with
shaping a city’s form and, through that, influ- these conditions, which can undermine the
encing its future. economic benefits of density. It is key for basic
In this chapter, we highlight social, environ- service infrastructure investment to catch up
mental, and economic dimensions of the with the reality of urban expansion.
current form of urban development in Haiti. Second, Haïitian cities are growing in an
The analysis draws on household surveys uncoordinated manner, with insufficient
and other existing data collection exercises, regard to natural disaster risk. New infrastruc-
complemented with insights from satellite ture can influence the decisions of households
“This chapter draws on background notes prepared by Chandan Deuskar, Benjamin P. Stewart, Nancy Lozano-Gracia, and Sarah
E. Antos. The authors are also grateful for comments from Roland Bradshaw and Harley Etienne (University of Michigan).
63
[page 80]
and firms on where to locate. Given that much strengthening government capacity. In this
of the land around Haitian cities is highly way, urban planning can help ensure that cities
hazardous, infrastructure investment decisions grow as economically vibrant, environmentally
have important implications for the number sustainable, and livable places. In line with the
of people and value of assets that are exposed Haitian proverb mentioned in the opening of
to natural disasters. It is therefore paramount the report, this chapter provides options that
that risk assessments, risk optimization strate- look at today’s problems, but with an eye on
gies, and land use planning are integrated into setting stepping stones for a brighter future.
urban investment decisions.
Third, Haitian cities are marked by weak CITIES IN HAITI ARE MARKED BY BASIC
land administration. Opaque information on SERVICE DEFICITS AND HIGH EXPOSURE
land ownership and poorly functioning land TO NATURAL DISASTER RISKS
regulation hampers efforts to deliver basic High levels of population density are not
services and integrate hazard risk into land supported by basic service infrastructure
use planning and building standards and can In Haiïtian cities, most residents live in
leave poor households vulnerable to eviction. crowded conditions. Although precise data
À well-functioning land market is also central on overcrowding is not available, on average,
to harnessing the agglomeration benefits of urban households of between 4 and 7 members
urbanization, as it is the mechanism through will share accommodation with only two
which land is allocated for its most productive bedrooms (DHS 2012). As outlined in Spotlight
uses. Long-term efforts to improve the quality 1, settlement patterns are comparatively dense,
of land administration are thus central to the even in smaller cities. This density, however, is
resilience of urban development. not supported by basic service infrastructure.
How can Haiti address these challenges? Urban areas have developed with inadequate
Fundamentally, improving resilient urban basic services. As discussed in Chapter 1, this
planning capacity is a question of governance. under-provision of basic services has come
Strong institutional frameworks are needed about as a result of specific historical, political,
to guide decision making among the many and financial conditions. It has important
players whose choices impact urban outcomes. implications for current and future living
The good news is that carefully prioritized and standards.
sequenced short-term projects can help build Current water supply and sanitation (WSS)
confidence in change and promote a virtuous systems are inadequate to serve the urban
cycle of governance (World Bank 2011b). This population. As highlighted in Chapter 1, more
chapter identifies a number of tools that can than one-third (35 percent) of urban residents
simultaneously help address immediate urban do not have access to improved sources of
challenges and also support long-term objec- water (WDI 2015), and trends show that rates
tives of building confidence in collective action, are declining.! Overall, only 58 percent of the
supporting state-society engagement, and Haïitian population had access to drinkable
: Improved sources of water include piped water into dwelling, to yard, or to the neighbor; public tap water; tube well or
borehole; protected dug well; protected spring; rainwater; bottled water or sold by company.
64
[page 81]
water from an improved source. This figure Senegal, Benin, Mali, and Ghana, with collec-
places Haïti 25 percentage points (p.p.) below tion rates of 21, 23, 40, and 85 percent, respec-
the second worst performing country in the LAC tively (Hoornweg and Bhada-Tata 2012). As
region (the Dominican Republic) and among indicated in Figure 1 (A), it also lags far behind
the 10 worst-performing low-income countries other countries in the Caribbean. Furthermore,
worldwide (slightly better than Eritrea, Niger, although information is scarce, it is thought
and Tanzania). Two-thirds (66 percent) of that collection rates vary substantially within
urban residents lack improved sanitation (WDI the country. Figure (B) presents information
2015). The overall access rates in Haïti are 50 on collection rates from 2001; it shows that
pp. lower than the average country in the LAC there is only one area of more than 100,000
region and 5 p.p. lower than the average low-in- inhabitants where more than half of the waste
come country. The 2012 DHS indicates that produced is collected.
48 percent of residents in Port-au-Prince and In addition to this, none of the waste that
41 percent of households in second-tier urban is collected in Haïitian cities is disposed of in
agglomerations use pit latrines with slab.3 At a sanitary landfill. The most common form
least 8 percent of urban residents practice open of disposal is use of open dumpsites, which
defecation (WDI 2015); and research suggests accounts for 62 percent of waste disposal in
that this figure may be higher given that urban the country or about 1.2 million tons of waste
residents that rely on public toilets may resort per year. This is the second largest share of
to open defecation to meet sanitation needs at dumping in Latin America, close to Guatema-
night (Tilmans et al. 2015). la’s 60.8 percent, and ahead of Nicaragua’s 50.3
Low levels of solid waste removal services percent. À large portion of waste in major cities
exacerbate flood and disease risks. Solid waste is disposed of in water sources, exacerbating
management is central to ensuring productive challenges of urban flooding and the associ-
urbanization, since effective removal of waste ated toll of diseases. In addition to this, there
is vital for a healthy urban environment. Haiti are “congestion effects” of litter, uncollected
has the lowest collection service coverage in garbage, and other signs of poor cleaning and
the Latin American and Caribbean region.4 maintenance. Looking ahead, these challenges
With an overall waste collection rate of 12.4 are only set to increase. According to the World
percent, Haiti lags far behind the next lowest Banks “What a Waste” report, estimated
country in the region, Paraguay, which collects solid waste production is likely to skyrocket in
57 percent of waste produced and behind countries such as Haïti, from an estimated 3,233
other low-income African countries such as tons per day today to 11,152 tons per day by 2025.
?Improved sanitation facilities include non-shared toilets flushing to piped sewer system, to pit latrine, and to septic tank, pit
latrines improved by ventilation or with slab, and composting toilet.
5Pit latrine with slab is a dry pit latrine whereby the pit is fully covered by a slab or platform that is fitted either with a squatting
hole or seat. The platform should be solid and can be made of any type of material (concrete, logs with earth or mud, cement,
etc.) as long as it adequately covers the pit without exposing the pit contents other than through the squatting hole or seat.
4Comparison of data from Regional Evaluation of Solid Waste Management in Latin America and the Caribbean, 2010, and data for
Haiti in 2012 taken from the “L'évolution des conditions de vie en Haïti entre 2007 et 2012” (IHSI, IRD, Dial, Nopoor, ANR. 2014).
sSee Hoornweg and Bhada-Tata. (2012).
65
[page 82]
nee SOLID WASTE COLLECTION RATES ARE LOW
(A) Waste collection rate (B) Waste collection rate, cities of 100,000 or
more in Haïti
100 OO
90 QO
5 LEE 80 À
* CIE .
* LLLELLEL .
o LILI çe À ——
ERRERRERE 20
+ LITELTLILIT .
30 30
* LLLELELLCE . EE
16
* CELL .
o LILI x
SE BSSERSESSSE Fssspsssss
8 8 à à d à 3 © à à EE
5 Z 8 £ $ à © à el SE SG 2 € ËE © =
© E © À à ËE «A = 5 3 g à E ©
$ E 2 EE & CRETE E TE
CE a à ur LOS SAS SE O
Co) a Ô 8 À E
ÔO TD [e]
£ x os
FE o
o 1
A (@)
Source: World Bank calculations based on (i) L'évolution des conditions de vie en Haïti entre 2007 et 2012. IHSI, IRD, Dial,
Nopoor, AN 2014 (Haiti); (ii) Jamaica Population and Housing Census 2011 (Jamaica); (iii) Censo Poblaciôn y Vivienda 2010,
Volumen 2, pg. 470 (Dominican Republic); (iv) UNSTAT 2013 (Dominica); (v) EVAL 2010 (Belize); (vi) INTEGRATED SOLID
WASTE MANAGEMENT PROJECT - GRENADA, Caribbean Dev Bank, Appendix 2.3. 2014 (Granada); (vii) Oficina Nacional de
Estadistica e Informacién, Chart 2.48 (p. 53). (Cuba); (viii) SIDSDOCK 2015 (St Kitts/Nevis); and (ix) IADB 2015 Capacity
Building workshop on Solid Waste Management in Barbados. (Knowledge Sharing Programme KSP-IADB). 2015. Source for
cities within Haiti: What a waste, 2012. Annex G. Collection Data for Cities over 100,000 people (Data date: 2001)
66
[page 83]
There is urgent need for additional basic nate potential sources of drinkable water
service infrastructure investment to meet (Graham and Polizzotto, 2013). Further-
growing needs. Current infrastructure more, workers that manually empty latrines
deficits in Haiti can be attributed to a number in Haïitian cities - known as bayakou - have
of factors, including financial and human been recorded dumping collected waste on
capital resource constraints and structural the ground, in ravines, and even in rivers
deficiencies in the management of existing (Katz, 2014). As further outlined in Box 4,
networks. At the national level, WSS services bayakous have appeared as a response to
are heavily dependent on external financing, the wide gaps in the availability of adequate
with 61 percent of the National Drinking sanitation infrastructure. The lack of infra-
Water and Sanitation Directorate (DINEPA) structure and the unsafe conditions in which
operating expenditures and 95 percent of they are forced to work enable the spread of
investment costs financed by development diseases and can increase health challenges
partners. In urban areas, only 54 percent related to flooding. Indeed, it is notable that
of the operating expenditures (excluding 42.5 percent of deaths in Haiti are attrib-
depreciation) of urban water operating units utable to communicable diseases and that
are covered by water revenues./ The pace water-borne diseases are a leading cause for
of urban growth is adding pressure to this mortality of children in Haiti (World Bank
situation, with the experience of medium- 2014).
sized cities being a case in point; medium- The current pattern of urban growth
sized cities are grappling to provide services exacerbates basic service delivery challenges.
in response to sudden increases in popula- The urban development patterns of large
tion (Country Partnership Framework). Haitian cities such as Cap-Haïtien and
There are high social, economic, and Port-au-Prince create additional obstacles
environmental costs to these basic service for basic services. In overcrowded settle-
deficits in dense urban areas. Poor quality, ments in Port-au-Prince, households often
dense sanitation increases exposure to do not have sufficient room in their houses
communicable diseases such as diarrhea, for private sanitation solutions; while some
typhoid, dysentery, and cholera. In crowded settlements in Cap-Haïtien are in areas
cities, shared latrines are associated with where pit latrines cannot be dug, because
higher exposure to health risks (Heïjnen the buildings are constructed on compacted
et al. 2014; Fuller, Clasen, Heiïijnen, and solid waste, above land that is otherwise
Eisenberg 2014). If pit latrines are close unstable due to sea water encroachment
to groundwater wells, they can contami- (Tilmans et al. 2015; Pelling 2011). In the
‘Source: FY 2013/14 DINEPA Budget. The IADB and the AECID are the major providers of funding and technical assistance
for DINEPA, with the World Bank, UNICEF, the Swiss government, the US CDC, and other organizations also providing
assistance.
7PAD: Sustainable Rural and Small Towns Water and Sanitation Project (P148970), World Bank 2015.
8It is notable that in their report of a pilot Container Based Sanitation project, Russel et al. (2015) note that one-third ofinitially
selected participants were screened from the project due to having insufficient space in their dwelling for household level
sanitation facilities.
67
[page 84]
BOX 1 —- URBAN FLOODING IN FOCUS
Our analysis of satellite data indicates that more than half (51 percent) of built-up areas in Haiti are exposed
to flood events. The area exposed is rising: the data indicates that built-up areas exposed to flooding increased
by 87 sq. km between 1990 and 2011. Furthermore, the proportion of urban land exposed to floods is greater than
non-built-up land: one-fifth (20 percent) of urban land is exposed to floods, compared with only 6 percent of
Haitian land in general. Unregulated growth increases exposure to flood risks, as can be seen in Cap-Haïtien.
Analysis of satellite imagery suggests that pockets of irregular settlements have appeared in different areas of
the city, in both the city center and the outskirts of the city (see Spotlight 2 for further details). We estimated that
CAP-HAÏTIEN FLOOD AND EROSION RISK
3 TE Fe 71 In 2010 there were 1,714 rooftops within 50 meters from
? 2 ? ANR & Hp the Haut du Cap's Bassin Rhodo by 2015 that number
x Br 4 jumped to 2,274, a rise of 32 percent.
= Eu * à dx a ME: Of those 2,274 rooftops, a high proportion of them are
x Me 4e . Cie V4 part of an irregular residential neighborhood. More specif-
BR COPA (ARR) ically, 55 percent of the rooftops located in this highly
ME ARRXSÉNNNE ER flood-prone land appear irregular.
CG. AMP RU Sa D Aer RE Share of Buildings within 50 meters
Le F » Vs BAS SA 4 RARE of the river basin 2015
ee | rc :
SPRL NES à "1 4
Re Ba Et AT D) LR. ù//
be HAN PER A Va 1Y
4 Fe ja MORT 7 Den Sparse
. er 4 ACL Fa Regular
. À . ; MAR
——— Irregular @
O 0.5 1 Commercial / Industrial
Note: Rooftop points created in 2010 and provided by CNIGS offered a baseline. New structures that appeared in the 2015
image were manually added.
[page 85]
about 72 percent of Cap-Haïtien’s buildings in 2015 had been constructed on flood prone land. Ofthe buildings
located in high flood risk areas, 22 percent of them are located in neighborhoods that have been classified as
irregular, and therefore structurally vulnerable, using semi-automated methods for satellite imagery classifica-
tion.*° Furthermore, construction in these areas is ongoing: despite the fact that the images from December
12, 2005 and April 15, 2015 reveal large amounts of inundation along the southern and eastern side of the Haut
du Cap river estuary (Bassin Rhodo), the number of houses in this area increased by 32 percent over this time
period. This can be seen in Figure 2.
Urban form matters for the severity of flood incidence, and urban planning tools can help mitigate damage.
Flood risk is driven by exposure to weather events and the physical vulnerability of cities, which is often impacted
by a range of public policy decisions, including watershed management and deforestation. In urban areas, the
challenges of flooding are often exacerbated by poor planning practices. For example, as paving and other
impermeable surfaces increase, the importance of well-functioning drainage for storm water run-off increases.
Vulnerability to urban flooding can be addressed through a combination of structural and non-structural
measures. Structural measures are those that help control the flow of water - for example, through investment in
drainage and water barriers. Non-structural measures include information dissemination and evacuation plans,
which help keep people safe from flooding. The case of Sao Bernardo do Campo, highlighted in the recommen-
dations section of this chapter, is an example of an approach that integrates both structural and non-structural
measures to address flooding, while also integrating flood management with other development objectives.
case for solid waste management, narrow and even features of the urban built environ-
roads impede collection vehicles from ment such as narrow winding streets and
reaching houses. The urban form thus social wellbeing. This is because the design
adds both technical and financial strains to of built environment can influence the ease
efforts to meet service deficits. with which interaction in public spaces can
The current pattern of urban growth also be monitored by other users and the extent
undermines living standards by creating to which different groups such as people of
situations opportunities for violence. As different ages or gender feel ownership and
noted in Chapter 1, urbanization and poverty capacity to use them (World Bank 2011).
reduction are closely connected. Yet the shape Litter and solid waste dumping can also
that cities take has important implications contribute to the perception of lawlessness,
for social risks such as exposure to crime. affecting both opportunistic crime and the
There is a link between lack of public services sense of security felt by a victim.#
° For this calculation, the city of Cap-Haïtien consists of 4 sections: Bande du Nord, Haut du Cap, Petite Anse, and Basee Plaine.
+ This “irregular” label can be considered a proxy for relatively lower income neighborhoods and from a remote sensing/
technical perspective means the area is characterized by small, unorganized buildings.
2 The impact of physical disorder such as litter on community decline is based on the Broken Window theory (J. Q. Wilson,
G. L. Kelling, 1982) which suggests that signs of disorderly and petty criminal behavior trigger more disorderly and petty
criminal behavior, thus causing the behavior to spread. This may cause a development sequence in a neighborhood leading
in the medium and long term to decay and deterioration of the quality of life of its inhabitants.
69
[page 86]
Table 1. THE PROCESS TO REGISTER PROPERTY IN HAITI IS
CUMBERSOME
STEP TO REGISTER
TRANSFER OF LAND ACTORS ESTIMATED COST ESTIMATED TIME
1. Permission to Commissaire du 2 months
survey land gouvernement
(in commune)
2. Survey land* Surveyor HTG 15,000 1 month
3. Prepare sales Notary 1 percent of sale price; VAT 2-3 weeks (simulta-
agreement (percent varies by property type) neous with surveying)
4. Obtain ‘avis de DGI Various fixed fees and supple- à da
cotisation’ and pay mentary taxes and stamp duty, Y
Tor resistration as well as fees for registration,
81 transcription (based on percent-
age of property price)
5. Register sale Local community 6-9 months
office of DGI
Source: Doing Business 2017
* land surveying is required every ten years and can be no older than five years at time of transaction
The pattern of urban growth in Haiti also alone are estimated at an amount equivalent
increases exposure tonatural disaster risk to almost 2 percent of GDP per year.®? In
Haiti is considered one of the world's most addition to the immediate costs of humani-
exposed countries to multiple natural hazards, tarian disasters, there are often hidden longer-
including hurricanes, floods, erosion, term costs of natural disasters in urban areas.
droughts, earthquakes, and landslides. For example, in the aftermath of the 2010
Natural disasters can wipe out advances in earthquake, increased reliance on off-grid
living standards in urban areas and further energy supply such as diesel generators or
exacerbate basic service deficits. Overall, biomass burning, as well as demolition and
historical data for the period of 1976-2012 construction efforts, may have contributed to
indicates that average damages and losses rising levels of harmful air pollution in cities
associated with hydrometeorological events (Davis and Rappaport 2014).
# Diagnostic sur l'impact économique et budgétaire des désastres en Haïti, World Bank 2014
3 Although there is no publicly available data on air quality in Haïti, insights from independent research indicate that air pollution
may be a serious concern in large cities, particularly for households and informal vendors in densely populated settlements. Davis
and Rappaport (2014) sampled the air quality in Port-au-Prince and Cap-Hatien in 2012 and 2013. The PM2.5 levels recorded in
70
[page 87]
BOX 2 - CORRUPTION IN HAITI: A THREAT TO DEVELOPMENT AND LIVES
According to the 2016 Corruption Perceptions Index (CPI) of Transparency International, Haïti ranks 159th
out of 176 countries for perceived levels of public sector corruption. It obtained a score of 20 of a maximum of
100, along with countries like Burundi, the Central African Republic, Chad, and the Republic of Congo.
Corruption thwarts economic growth, discourages foreign investment, and reduces resources for infra-
structure, public services, and anti-poverty programs (Robinson 1998; Ugur 2014). In 2004, the Haitian
government established the Anti-Corruption Unit (L’Unité de Lutte Contre La Corruption [ULCC]), an
autonomous agency under the Ministry of Economy and Finances tasked with fighting corruption in all its
forms within public institutions. Despite some improvements, Haiti still ranks lowest in control of corrup-
tion and government effectiveness compared to its LAC peers. Corruption in the country takes form in the
corruption of institutions responsible for rule of law, embezzlement of public funds by political and private
organizations, payments to government-associated individuals for goods not provided and services not
rendered, and abuse of discretionary accounts by government officials, among others.
Corruption has also been associated with the impact of natural hazards in Haïti. Ambraseys and Bilham
(2011) observed the link between corruption and deaths in earthquakes and calculated that 83 percent
of all deaths caused by building collapse since 1980 took place in countries scoring consistently low in the
CPI. They point out that compliance to earthquake building standards depends on responsible gover-
nance, which, among other factors, can be undermined by corruption. Corrupt practices in the construc-
tion industry, such as bribery in the form of awarded construction contracts and corrupt inspection
practices, among others, are a major contributor to the death toll in the wake of a natural disaster. Such
is the case in Haïti, where an estimated 200,000 people lost their lives as a result of the 2010 earthquake.
Sources: Ambraseys and Bilham, 2011; Robinson, 1998; Singh and Barton-Dock, 2015; Ugur, 2014.
Analysis of satellite data indicates that are built-up areas less prone to risks than
the vast majority of built-up areas are other parts of the country, but there are still
vulnerable to natural hazards. As discussed areas within cities that are highly exposed.
in depth in Spotlight 1, most land in all Urban expansion continues to occur
cities is considered highly exposed to earth- in hazardous areas, resulting in growing
quake hazard. Furthermore, built-up areas numbers of people exposed to disaster risk.
are disproportionately concentrated in The proportion of built-up area exposed to
high seismic hazard zones. One quarter of risks has remained steady over time in Haiti,
the country’s land (26 percent) is exposed suggesting that the pace of growth has been
to erosion, and more than half of all urban just as strong in risk areas as in areas with less
areas are considered at flood risk (see Box risk (see Spotlight 2 for further details). This
1). Only in terms of erosion and landslides pattern of growth increases the number of
the Port-au-Prince sample sites would be considered “hazardous” (18 percent of cases) or “very unhealthy” (41 percent of cases)
by US Environmental Protection Agency standards if they were observed over a 24-hour period. The PM2:5 levels recorded in
Cap-Hatien traffic were higher than levels published for any other city in a developing country other than Nanjing, China.
TI
[page 88]
people exposed to risk.!4 Indeed, it is notable WEAK LAND ADMINISTRATION, INAPPRO-
that of the 113 landslides that have occurred PRIATE REGULATION, AND INFORMATION
since 1994 (and mapped by CNIGS), almost GAPS HAMPER EFFECTIVE DECISION
; MAKING AND EXACERBATE PLANNING
half of them have taken place in densely or
. . . CHALLENGES
intermediately densely populated areas. This
underlines the urgency of incorporating risk Vital building regulations are not enforced
information into land use planning, as will The frequency and intensity of disaster
be discussed further below. events in Haiti make land use zoning and
Current growth patterns also lead to building codes vital. Building codes are very
greater exposure of assets, such as water important in Haitian cities, given the high
and sanitation infrastructure and education percentage of urban areas that are exposed
facilities. The government of Haiti to natural disaster risk. Haiti has developed
estimated that the 2010 earthquake resulted several tools to strengthen the housing sector
in USD 15 million in damages to pre-ex- since the 2010 earthquake, including: (i) the
isting water supply infrastructure, including National Building Code, which integrates
reservoirs and pipes. In the capital, one of retrofitting (2012); (ii) guidelines for repair
the five buildings of the Autonomous Metro- and construction of small masonry buildings
politan Drinking Water Plant (CAMEP) was (2011); (iii) the National Housing Policy (2013);
destroyed, and 15 percent of the 600 private and (iv) a communication strategy to promote
water sales outlets in the metropolitan area better building processes in Haiti. The World
were damaged (World Bank, 2010). Overall, Bank is also supporting the Ministry of Health
the housing sector has incurred the highest to reinforce their “safe hospital” unit and the
share of damages and losses in recent major Ministry of Education on safe school guide-
hydrometeorological events, 28 percent of lines and has supported the Ministry to build
total damages and losses for hurricanes safe community schools in underserved areas
Jeanne (2004), Faye, Gustav, Hanna, and (World Bank 2o15a). Challenges remain,
Ike (2008), and 31 percent for Hurricane however, and many buildings damaged in
Matthew (2016). central Port-au-Prince during the earthquake
have yet to be repaired. Data from the 2012 DHS
survey indicates that 54 percent of respondents
in the metropolitan area of Port-au-Prince
said that their house was damaged during the
earthquake. Of these, 63 percent said that the
damage was evaluated by a team of experts,
but only just under 40 percent of those that
had been evaluated confirmed their buildings
had been completed or were in the process of
implementing the needed repairs.
4 By some estimates, increased density of population in exposed areas in Port-au-Prince and Gonaïves in the second half of the
20th century has led to between a doubling and quadrupling of risk associated with tropical cyclones (Klose 2011).
72
[page 89]
There are, however, fundamental - but there is a need to explore how lessons
challenges in translating building codes into from rental support cash grants can be trans-
common practice, including both financial formed to support long-term improvements
constraints and the difficulty of attracting in the rental sector.'6
and retaining qualified personnel to oversee Alongside limited enforcement of vital
and enforce them. Enforcement is particu- building codes, land administration is
larly challenging (see Box 2). In addition to cumbersome. It is expensive and time-con-
this, affordability remains a major concern suming to register property and gain
for many households. Sustainable construc- building permission. Haiti ranks 18oth in
tion practices require expensive materials the World Bank’s Doing Business ranking
and qualified workmanship. The majority in terms of ease of registering property and
of Haitians live in self-produced housing 166th for getting a construction permit.
(i.e., informal housing that is built without The process for registering a land trans-
the appropriate technical expertise) and action is conducted in accordance with
is incrementally expanded in line with stipulations set by a law from 1890, and
households’ needs and available resources. there is no mechanism to file a complaint
Housing finance is almost nonexistent, against a mistake made in the transaction
and less than 15 percent of the population registration process. The steps are set out
even have an account at a financial institu- in Table 1 below. Although the number of
tion (WDI 2014). Many urban residents are steps itself is comparable to that of OECD
tenants (USAID 2016).'$ À number of innova- countries, the process takes nearly 14
tive efforts to increase the supply of safe times longer.!7 Construction permit fees,
rental housing were piloted in the aftermath in turn, are estimated to be as high as 15
of the 2010 earthquake. These have met with percent of the total cost of construction,
short-term success and have been replicated which is much higher than the average
in other countries - such as in the Philip- of 2.5 percent in the Latin America and
pines in the aftermath of Typhoon Haiyan Caribbean region.
3 According to the Haitian statistics agency, 53 percent of Port-au-Prince residents in 2010 were renters. This number increases
to 65 percent if households rent the land that the house they “own” is built on. During the 2010 earthquake, Oxfam America
estimated that 75 percent of internally displaced persons in camps were renters (Etienne 2012).
26 Cash grants empower recipients to prioritize their own needs and make decisions about where to locate. The project design
included a provision known as “Keep the Change” to mitigate any potential upward pressure on rental prices. This provision
encouraged households to negotiate their rent with landlords, by allowing the tenant to keep the difference between the rental
allowance and the agreed rent paid. The inclusion of a verification visit to ensure that the rental housing met minimum safety
standards acted as an incentive for landlords to improve the quality of housing offered. Further efforts are needed to explore
the long-term sustainability of innovative programs such as this. While the short-term impacts were haïled as highly successful,
some estimates indicate that as few as one quarter of beneficiaries renewed their contract at the end of the year, with insuffi-
cient funds being cited as the main reason for moving (Phelps 2016). It has also been suggested that some households used their
grant money to purchase land in irregular areas.
7 On average the process takes 312 days compared to 22 days in OECD countries and 68 days in the Latin America and
Caribbean region average. It is also estimated that the process costs 7 percent of the value of the property, compared to 6
percent in the LAC region, and 4 percent among OECD countries.
73
[page 90]
The high costs of formal land development the responsibility of registering land trans-
impact adherence to vital regulations such actions belongs to the General Tax Office
as building codes. Inappropriate regulation (Direction Générale des Impôts [DGI]) of the
drives up the costs of land development and Ministry of Finance who notes land trans-
is a disincentive to formal development of actions by hand in a chronological book of
land. As such, it does little to generate govern- records dating back to 1824 (IMF 2015). The
ment revenue while undermining compliance lack of clear land records and necessary
with vital safety standards (GFDRR 2011). planning tools, as well as fragmented gover-
Furthermore, across the world, inappropriate nance, have many negative repercussions for
land regulation processes have been linked resilient urban planning.
to informal development, as households are Lack of transparent and accessible land
thought to be pushed out of formal urban ownership records is a constraint on urban
housing and into the informal sector. Although housing and infrastructure investment
it is difficult to provide reliable estimates of programs. Water, sanitation, or transporta-
housing needs, most attempts suggest that tion infrastructure projects face extensive
between 300,000 and 400,000 units are needed implementation delays when the design is
- while the formal system has never produced based on out-of-date maps. Furthermore,
more than 4,000 housing units per year (Hoek- lack of clear land ownership records can
Smit 2013). Estimates suggest that 60 percent undermine large-scale urban investment
of Haïtian households do not have any formal projects (see Box 3), as lack of trust in the
document of ownership (USAID 2010). fairness of the proceedings can cause urban
public-private partnership projects to become
Opaque land ownership is a constraint to bogged down in costly delays and controver-
infrastructure and housing investment sies (UN Habitat 2011). Land records are also
The quality of land administration in essential for an effective property taxation
Haiti is low (Figure 3). Largely inspired by system, which in turn has implications
the French system, the current system of for local municipal finances and thus the
property registration relies on judgment of capacity of local government (as discussed
a restricted number of public notaries and further in Chapter 4). In addition to this, in
surveyors, which are positions appointed by the past, it has been an avenue for political
the President. In addition, the rights to the corruption (see Box 4. ).
profession are usually inherited, and the Uncertainty over property rights has been
procedures to integrate new professionals a constraint on the development of safe,
lack transparency (IMF 2015 and Oriol et al. affordable housing. À number of donors and
2017). Furthermore, the land registry system NGOs have developed projects to provide a
is fragmented. The Office of the Cadastre range of housing solutions, including new
is housed under the Ministry of Public infill houses, new finished houses in green
Works; geospatial imagery is kept in the field developments, and multifamily units.
National Center for Geospatial Information Homes are often subsidized through a highly
(Centre National de L'information Geospatiale subsidized model of leasing-to-own (the cost
[CNIGS]) in the Ministry of Planning; and of the new houses ranges from USD 12,000
74
[page 91]
BOX 3 - THE UNCERTAINTY IN LAND LAWS AND ITS IMPACT ON PEOPLE'S LIVES
Investment in infrastructure within and between cities is seriously undermined by the uncertainty of Haitïs
land laws - ultimately affecting real people. In 2013, Reuters reported the case of the National Road No. 7, a
56-mile road project meant to connect Les Cayes - a port city in the south - with Jérémie - a city in Grand'Anse,
one of Haitïs poorest départements. The USD 100 million project was announced in 2008 and was backed by the
Canadian International Development Agency and the Inter-American Development Bank.
Shortly after beginning the works, the bid-winning company abruptly abandoned the construction site.
The project had run into parcels of land whose ownership was unclear and for which displaced residents had
not been compensated. The company left behind incomplete infrastructure works, roadside homes seriously
damaged by its trucks, and households with demolished homes. National Road No. 7 remained then as a
poor-quality, single lane, and dangerous road, especially in most remote areas.
Source: Ferreira, 2013.
to USD 40,000 per unit and occupiers are direct records to measure the extent of land
expected to make payments of between 1 conflicts between citizens, they are thought to
and 5 percent of that value). Yet the absence be increasing as competition for land intensi-
of secure titles that can be collateralized are fies with urbanization (Etienne 2012; USAID
a major constraint to affordability of these 2010). Furthermore, as USAID stressed, in
projects, as credit is only available through the aftermath of disasters, households with
expensive short-term loans (Hoek-Smit 2013). weak or contested land tenure claims find
Lack of clarity of land ownership adds themselves increasingly vulnerable to efforts
uncertainty for citizens, can be a source of by actors with the ability to take advantage
tension between citizens and the state, and of the disruptive circumstances to concen-
even with emergency relief and other non-gov- trate their land holdings (USAID 2010).
ernment organizations (NGOs). Although Eviction can even take place as part of public
most households lack property documenta- programs: Amnesty International recorded
tion, there exist a combination of formal and that hundreds of families were evicted from
informal processes that - although complex downtown Port-au-Prince to make way
- allow households to inherit, manage, lease, for construction of public administration
and transfer land securely (Tarter et al. 2016). buildings (Amnesty International 2015).
Nonetheless, mechanisms to address griev- Furthermore, lack of clarity over ownership
ances or conflicts are lacking. Land arbitra- has hampered emergency response in the
tion processes are opaque, time-consuming, aftermath of the 2010 earthquake, as lack
and highly variable from one commune to of clear property rights was a constraint on
another (see Annex 3 for details of the legal NGOSs ability to support households with
framework for managing property disputes). financing to recover and/or repair property
On average, legal cases take five years to (International Housing Coalition 2011). In
resolve (OAS 2010). Although there are no addition to this, there were instances where
75
[page 92]
Figure 3.
22, ©.
15
10
5
o
S D 0 E KE 0 Q 2 0 SA ON € X Q 6 à 0 N EE É EU ES 5 Où 2 À à
S 8 3 5 5 D 4 à € 8 = Ù à 5 vu = EE & à 2 & à é à
E $ à 9 Z Do © à& € D S à HE à à SO E O à À 8 € & <
D À 6 ë En # » à 5 & À & À À à & ®l s LÉ A
ä el ®] £ Æ < © ñ T a Le) Z? U
E È Ê
< © S)
A
MN Quality of the land administration index (0-30) Average LAC
Note: this index is comprised of information on reliability of infrastructure, transparency of information, geographic coverage,
equal access to property rights, and land dispute resolution. The Index is scored from O to 30. The higher the score, the higher the
quality of land administration. The dotted line represents the average LAC.
Source: Doing Business 2017.
lack of clarity over land ownership under- the loss of land records that occurred with
mined trust in the work of some aid efforts, the destruction of the DGI building in the
as there were cases where NGOs became 2010 earthquake. The Haïitian government,
implicated in land conflict after being under the leadership of the Inter-Ministe-
granted permission to establish operations rial Committee for Territorial Development
in areas they were unaware were the subject (Comité Interministériel d'Aménagement du
of ownership disputes (Etienne 2012). Territoire [CIAT])) is currently proposing to
Efforts are underway to introduce a land update the legal framework for land tenure
cadastre. '$ Efforts to modernize this system systems, modernizing land administration
have faced numerous challenges, not least tools, and elaborating a methodology for
# À land cadastre is a public inventory of land. The core information that it usually contains on all properties includes: bound-
aries; ownership or interests (rights, restrictions, and responsibilities); improvements, in the form of buildings and infrastruc-
ture; and an estimation of the value. The information in a land cadastre is methodically arranged and displayed in maps.
76
[page 93]
BOX 4 — PROPERTY RIGHTS, INSTITUTIONAL CAPACITY, AND STATE FRAGILITY
The World Development Report of 2011 stressed that legitimate institutions are the “immune system” that
helps defend countries against the internal and external stresses that result in conflict and violence. State,
market, and social institutions that provide security, justice, and economic opportunities are thus central to
peace, stability, and development. Property rights and broader land market institutions are examples of such
institutions. They are particularly important where rapid urbanization weakens social cohesion and informal
dispute-resolution mechanisms.
The literature on land in conflict environments underlines this message further. Many studies have stressed
that where land ownership records are not transparent and publicly accessible, they can be exploited by
political factions to buy support for either their government or rebellion (Global Land Tool Network, online).
Lack of transparency over land rights and use can even be used as a form of gerrymandering: changes to land
use rights motivated by a desire to influence settlement patterns and thereby shape electoral outcomes (de
Waal 2009). Public land assets are substantial in many countries across the world, and self-interested public
authorities can capture private benefits of this land by amending the user rights associated with the land or
by selling off these public assets at below market rates to allies. Indeed, it is notable that in Haïti it has been
alleged that the use of land to curry political favor was common under both Presidents Duvalier and Aristide
(Etienne 2012).
How can property and land market institutions be strengthened? The World Development Report highlights
several key messages for transforming institutions in fragile situations. Institutional reform is never easy, and it
is further complicated where there is a legacy of violence that can undermine trust in government and hinder
cooperation. Reforms in themselves may be blocked or derailed by actors who risk losing out from changes: any
significant shift in the status quo is likely to create both winners and losers, and if the losers are well-organized
they can form a powerful lobby against reform.
Thus, for example, experience suggests that actors who benefit from the current system of property regis-
tration may resist reform to the system out of self-interest. Furthermore, in contexts where there is lack of
trust between citizens and state, individual households may be strongly suspicious of government efforts to
collect cadastral information. Nonetheless, global experience suggests that institutional strengthening can be
attained, through an approach that combines confidence building, participation, and careful prioritization of
reform. As will be discussed in greater depth below, these are principles that can also help guide institutional
strengthening for resilient urban planning. In short, there are potentially strong mutual benefits between
Sources: Ambraseys and Bilham, 2011; Robinson, 1998; Singh and Barton-Dock, 2015; Ugur, 2014.
77
[page 94]
the establishment of a “pre-cadastre,” which of a broader effort to transition from recon-
draws on geo-referenced data on land tenure struction to comprehensive forward-looking
to link parcels and land ownership. Initial planning. This approach has combined insti-
piloting stages have been completed. Box 5 tutional decentralization, as well as signif-
highlights some of the findings of one such icant efforts to provide strategic vision to
pilot. Although the process is likely to be coordinate activity in specific localities and
challenging to complete, progress in this area sectors.
can have many important long-term benefits. Urban planning responsibilities are
These could also extend to improved disaster formally divided among a number of different
risk management, as land ownership maps bodies. These are highlighted in Figure 4.
are also a key tool for disseminating infor- The three main bodies with planning respon-
mation and enforcing regulation on hazard sibilities are: The Ministry of Planning and
areas; effective property taxation can be a External Cooperation (MPCE); the Ministry
tool to incentivize compliance with building of Interior and Local Authorities (MICT);
norms!; and current and accessible land and the Ministry of Public Works, Transport,
records can also help authorities to react in and Communications (MTPTC). Four
the aftermath of a disaster.?° sector-specific ministries also conducting
important activities that shape urban
DESPITE RECENT EFFORTS, GOVERNANCE form include: The Ministry of Agriculture
CHALLENGES REMAIN A HURDLE TO (MARNDR), the Ministry of Health (MSPP),
LONG-TERM RESILIENT URBAN GROWTH the Ministry of Environment (MDE), and the
Since 2010 government activities in urban Ministry of Finance. These ministries house
areas across all levels have been strongly agencies that have roles that are central to
focused on reconstruction activities. This has effective planning, such as Office National
included the challenging task of coordinating du Cadastre (ONACA, housed under the
the work of many non-government organiza- Ministry of Public Works), the Centre
tions (NGOSs) and international development National de l'information Geospatiale
organizations whose activities also shape the (CNIGS, under the Ministry of Planning),
urban space.” At present, the government and the Direction Générale des Impôts (DGI,
is undertaking a series of reforms as part under the Ministry of Finance). The Comite
+ In Turkey, houses that abide by regulation and pay taxes are eligible to participate in an earthquake insurance fund (the Turkey
Catastrophe Insurance Pool), a mechanism that resulted in insurance coverage rocketing from 600,000 to 3.5 million in the
year it was established (GFDRR 2011). For further discussion on the state of taxation collection in Haiti, please see chapter 4.
2 For example, the existence of documented and up-to-date public cadastral records and urban hazard maps, as well as inventories
of public roads and infrastructure was a vital tool in the aftermath of Hurricane Katrina hitting New Orleans in 2005. The New
Orleans authorities salvaged these legal records and used the information to help inform relocation responses, provide data for
insurance companies and banks to respond, and to plan the rebuilding of basic service infrastructure (World Bank blog, 2016).
2 NGOs build houses, deliver vital services, and help with disaster risk management assistance in Haïti. These activities shape
urban space and require considerable coordination and oversight. Although a “cluster system” was introduced to coordinate the
international humanitarian response to the 2010 earthquake, it is widely believed that only a fraction of the estimated 10,000
NGOSs present in Haiti are registered under this system. http://blogs-worldbank.org/latinamerica/what-haiti-taught-us-all
78
[page 95]
BOX 5 — AN EFFORT TO DOCUMENT THE LAND USE AND OWNERSHIP PATTERNS IN PAP
Às part of the efforts around implementing the Plan Foncier de Base in Haiti and collect accurate and
up-to-date information on land use and ownership, a pilot was implemented in 2013 in part of the district of
Bas Peu-de-Chose, outside the boundaries of the colonial city of Port-au-Prince, in a neighborhood called Le
Bas Peau-de-Chose. This effort included surveying a total of 997 plots, with 798 parcels covering 26 hectares.
Analysis from the information collected suggests that 41 percent of parcels are between 100 and 250 square
meters. Most of these plots (82 percent or 73 percent of the surveyed land) is controlled by private owners.
State-owned land represents 8 percent of the parcels and 27 percent of the surveyed area; it is characterized by
large land lots: 22 percent of state-owned parcels cover 89 percent of the state-owned area). Overall, the neigh-
borhoods of Bas Peau-de-Chose investigated remain mainly a residential area with 48 percent of plots being
residential; another 41 percent is either devoted to commercial activities or occupied by public services, while
the remainder is a combination of residential and commercial use.
À considerable number of owners do not live in their property (29 percent). Moreover, even though such
private parcels have been purchased by individuals (36 percent) or are held under undivided ownership, en
indivision (31 percent), property titles were collected only for 31 percent of them; 77 percent of these documents
were notarized. Further, the information collected for this area suggested that only 1 percent of all the parcels
in the area analyzed are in tenure conflict, suggesting ownership conflicts are not of big concern in the area
studied. In general, key challenges observed in the pilot neighborhoods of Bas Peu-de-Chose in regards to the
misuse of land stem from the nearly complete absence of rules of urban planning and mismanagement of land.
Source: Contributed by CIAT based on CIAT, 2017. Les Cahiers du foncier du CIAT. Le Plan Foncier de Base à Bas Peu-de-Chose.
Les leçons apprises. Secrétariat Technique du Comité Interministériel d'Aménagement du Territoire. No. 2, July, 2017.
Interministeriel d’'Amenegament du Terri- government. The municipalities are then
toire (CIAT), which was created in 2009 and organized into 42 arrondissements, which, in
is headed out of the Prime Minister’s office, groups of three to seven, finally composed 10
has overall coordinating responsibility for all departments. In theory, municipalities have a
ministerial initiatives regarding territorial share of the responsibility for urban planning
planning. activities, such as the provision of water and
Local governments are also important sanitation services. For further details on the
actors in urban development. The constitu- roles and responsibilities of these munici-
tion of Haiti defines the country as having “a palities, arrondissements, and departments,
decentralized form of government” organized please see Chapter 4.
along three layers (Constitution of Haiti, In practice, there is a gap between the
1987). There are 570 “communal sections,” structure on paper and the day-to-day
the smallest political subdivision. They functioning of government. Across the
are distributed across 146 municipalities world, the daily functioning of government is
(communes), the intermediate level of local shaped by both written and unwritten rules.
79
[page 96]
Figure 4.
INTERDEPART- DEPARTMENTAL
MENTAL COUNCILS ASSEMBLIES
4 MINISTRIES
THAT MAKE
INVESTMENT COMMUNAL
DECISIONS ASSEMBLIES
3 MINISTRIES
WITH PLANNING LOCAL
RESPONSIBILITY à ASSEMBLIES
Source: Authors’ elaboration
Unvwritten rules, bargaining, and power that local bodies are unable to fulfill respon-
dynamics between interested actors all have sibilities in practice. This is discussed in
important impact on how activities take greater depth in Chapter 4.
place in practice (World Development Report In recent years the government has under-
2017). Although there is a lack of research taken a number of initiatives to promote
that rigorously documents these dynamics decentralization, which can help improve
in Haiti, there is evidence of duplication accountability by bringing service delivery
and ambiguity over responsibility for urban responsibilities closer to the population that
planning decisions and implementation. benefits from it. The Strategic Development
For example, it can be seen in the uncer- Plan of Haiti emphasizes the importance of
tainty over the allocation of funds to support territorial reform to achieving the country's
urban planning activities such as basic development objectives, and there is a nation-
service provision. Thus, in the case of water al-level commitment to decentralization
provision, legal responsibility is divided in through the establishment of regional and
an unclear and overlapping manner between local government offices. Important efforts
national, departmental, and communal in technical assistance for capacity building
bodies; while unpredictable financial flows and public investments have taken place in
(both in terms of quantity and timing) mean line with this vision. The plan also outlines a
80
[page 97]
vision of regional growth pole development, These plans help to fill an important infor-
which is expected to help counterbalance the mation gap, but implementation remains a
political and economic dominance of Port-au- challenge. There are two major constraints
Prince. Other notable developments include to the effectiveness of these plans in shaping
the election of mayors for all municipalities the development of Haïti’s urban areas in
across the country in 2016, for the first time practice. First, many planning instruments
in ten years. Nonetheless, many challenges exist in the law but are not implemented in
remain. Municipal capacity varies substan- practice. For example, the law on ‘organisa-
tially, even between municipalities within tion de la Collectivité territoriale de Section
the larger metropolitan areas. Constraints Communale’ of 1996 and the ‘Décret portant
include human resource limitations in the sur l’organisation et le fonctionnement
form of insufficient number of qualified staff des Sections Communales’ of February
and municipal revenue. Efforts to devolve 2006 specify a number of instruments that
power to local authority remain incomplete, have rarely been used (see Annex 3 for
and only about half of the funds designated further details). Secondly, where plans are
for communes are transferred in practice (see developed, there remains a challenging gap
Chapter 4 for further details). between the expectations set by the plans
Important efforts have also been undertaken and the financial and technical capacity
to help guide decision making across different to implement their recommendations in
levels and sectors of government through the practice. There remains lack of clarity
development of strategic plans. Plans play a over the division of responsibilities across
vital role in resilient urbanization, since they different levels of government, uncertainty
can provide a framework to leverage the value over financing for activities, and some
of investments by integrating development confusion over the legal status of plans.
objectives across sectors and different levels Effective plans must be backed up by the
of government. The Government of Haiti has capacity to guide the behavior of house-
taken considerable efforts to establish effective holds, firms, and other government actors
and coordinated decision-making processes to abide by the plan. Haïti is not alone in
in recent years. One key element of this has grappling with this cwhallenge. Across
been the development of national, sectoral, Sub-Saharan Africa, for example, many
and local plans. As indicated in Annex 4, this cities have detailed plans that set high
includes a national development plan and standards for urban development. These
comprehensive policies for the housing, water master plans are expensive to produce,
and sanitation, and disaster risk management requiring months, if not years, of consci-
sectors. Às also indicated in the annex, there entious work. Many, however, have little
have been almost a dozen efforts to develop an impact, as they set planning ambitions that
effective master plan for Port-au-Prince and are difficult to enforce. Where they set exces-
Cap-Haïtien in recent years.?? sively high standards for development, they
# This includes UN Habitat supported forums in 2011 (which included consultations with 600 representatives of the private
sector, civil society, academics and professionals of architecture and planning, community leaders, and also local and
municipal technicians) and the 2014 First National Urban Forum.
81
[page 98]
are linked to rising informality and reduced ening capacity for resilient planning in the
overall investment in urban development future. In the following section, we discuss
(Lall, Henderson, and Venables 2017). a number of policy actions that can help
Global experience shows that plans alone address a pressing urban challenge and also
cannot guide urban development effectively; help stimulate a virtuous cycle of institu-
institutional capacity is needed to ensure tional strengthening. The actions outlined
that coordination and cooperation across below draw on tools to help consolidate key
agencies takes place in practice. In the institutional features that distinguish fragile
following section, we therefore turn to policy and violent situations from stable develop-
tools that can help empower local actors and ment environments, such as: confidence
strengthen coordination across the many building and bottom-up support for state-so-
different sectors of government, to improve ciety engagement, which is vital to ensure
capacity for resilient urban planning. that key actors will collaborate in collective
action; initiatives that leverage transparency
INSTRUMENTS THAT CAN HELP INITIATE of information to stem illegal financial flows
CHANGE TODAY, WITH AN EYE ON BUIL- and strengthen accountability; and insti-
DING STEPPING STONES FOR TOMORROW tutional strengthening in priority areas of
The previous analysis has shown that justice and security.?
Haitian cities face a number of challenges. The following recommendations have
Urban areas are crowded, rather than dense; been sequenced in light of the need to
they are growing in an uncoordinated address urgent short-term challenges
manner, with insufficient regard for risks; and build momentum for vital long-term
and are hampered by lack of clear, authori- improvements in resilient urban planning
tative, and accessible property rights. What and service delivery capacity. The first set of
can be done to ensure a brighter future for policies are those that can help nudge urban
Haiti? Cases from around the world point growth away from crowding and towards the
to specific initiatives that can address each kind of density that can help a city thrive.
of these challenges. Ultimately, however, Specifically, different approaches to meet
sustainable improvements will require current basic service needs and build resil-
improved institutional capacity for resilient ience, through measures that help address
planning and effective delivery of services. current challenges associated with the
This is a long-term agenda, but steps can be absence of effective planning in the past.
taken today to build strong roots for future These may be termed “corrective” measures
transformation. to address basic service deficits and vulner-
Policymakers have several tools at their ability to hazards. The second group are
disposal to address the urgent challenges efforts that leverage information as a tool
of today, while also progressively strength- to improve land use management; these
3 The initiatives discussed below are aligned with recommendations from the World Development Report on Conflict and
Development (2011), as well as the World Development Report on Governance and the Law (2017) on reinforcing governance
(World Bank 2017a).
82
[page 99]
are examples of cases in which new sources in conflict-affected and fragile states, service
of information are used to help coordinate improvements can send a strong signal of
decision making across different government change, help build confidence in government,
departments and to build support for reforms and extend the reach of the state into urban
among urban citizens. These may be under- areas, and thus form part of a positive cycle
stood as more “preventive” measures to help of improved governance and stability (World
guide the pattern of future growth. Finally, Bank 2011b, p131-2).
specific institutional strengthening initia-
tives are highlighted. Continue to empower communities and
strengthen local government through basic
In the short term, invest to address basic serviceinitiatives
service deficits Community engagement and empower-
Basic urban services such as water, waste ment is vital to successfully upgrade access
collection, and maintenance of order in public to services in areas where development
spaces are the front-line of citizen interaction has already taken place in an unregulated
with the state. These services are spaces in manner. Upgrading existing unplanned
which the state is most visible (Denney et al. areas presents a number of challenges:
2015; Jones and Howarth 2012). They can these are technically complex projects that
be a visible testimony to the presence and require area-specific knowledge, as well
effectiveness of government. Studies from a as ingenuity and patience (Arnold 2015).
number of post-conflict countries have found Haiti has almost ten years of experience
that there is a strong statistical relation- implementing Community Driven Devel-
ship between participation and perceptions opment (CDD) projects. Overall, this
of government. Participation is linked to record testifies to the potential of CDD as
improved trust between citizens and the a tool address urgent needs by empowering
state, and among citizens themselves, and communities. Reconstruction activities
as such may have implications for long-term such as the Port-au-Prince Neighborhood
sustainability of urban development. Indeed, Housing Reconstruction Project PREKAD?
#4 Research from Nepal, Pakistan, Sri Lanka, Uganda and Sierra Leone have found that users opinion and trust in government
is linked to user experiences of services, and suggest that poor performance can be a driver of grievances. Indeed, findings
suggest that the relationship between participation and perception of government may be more important than the quality
of service delivery itself (Denney et al. 2015).
2 CDD is “an umbrella term for projects that actively include beneficiaries in their design and management” (Mansuri and Rao
2004). The objective is to ensure that local people have agency and voice in addressing local problems by working in partner-
ship with government and other organizations in the design and implementation of development projects. It operates on the
principles of transparency, participation, local empowerment, demand-responsiveness, greater downward accountability,
and enhanced local capacity (World Bank, online).
2 PREKAD is a USD 65 million project supported by the Haiti Reconstruction Fund implemented between 2011 and 2016. The
objective of the project was to help earthquake-affected residents of selected Port-au-Prince neighborhoods to repair and/or
reconstruct their houses and/or return to improved housing conditions and improving basic community service infrastruc-
ture. The project included debris removal, housing repair and reconstruction components, as well as community service
infrastructure repair/improvement, and support for capacity building.
83
[page 100]
and the Haiti Urban Community Driven community engagement. Overall, experience
Development Project PRODEPUR?7 in the Haïitian urban context has demon-
projects in particular have demonstrated strated that CDD can be the entry point
the potential of CDD to support housing for community-based crime and violence
reconstruction and improvements in basic prevention activities, as communities can be
community service infrastructure. In mobilized around small-scale infrastructure
addition to this, experience has shown that provision. Careful facilitation of this engage-
delivery of services such as access to water ment is key (Word Bank 2013a). It may be
and solid waste management are central to necessary to ensure that the design of projects
conflict resolution in communities defined includes efforts to ensure that gang members
by complex territorial groups or “Bases.”?$ are aware of the project activities to prevent
There is room to do more: through careful interference in the implementation process.
design, the benefits of CDD can be further Furthermore, facilitation may need to balance
leveraged. Emerging global best practices concerns that the presence of criminal actors
suggest that there are specific challenges may create barriers to other specific groups
with community engagement in urban areas, of community members - such as women -
and thus room to further improve the design attending meetings (Arnold 2015). As such,
of CDD projects in cities. Specifically, three project design should reflect the principle of
key elements can be strengthened in order to building “inclusive-enough” coalitions.3°
leverage the full potential of CDD in Haiti. Secondly, ensure that projects are better
Firstly, refine facilitation of community integrated with local government processes
engagement. The size of the target and help to build the accountability of insti-
community is typically larger in urban areas tutions to deliver the services over time. In
than in rural areas and the population is often the context where local government capacity
more heterogeneous. It is also often more is weak, CDD projects often need to rely on
challenging to encourage engagement in civil society organizations to mobilize and
projects, as people living in cities tend to value support community engagement (Arnold
time for wage-earning jobs more than their 2015). Yet local authorities have a vital role to
rural counterparts, and they may have a less play in creating a permissive environment for
strong sense of local “community” (Arnold community projects to succeed. Past experi-
2015). In addition to this, in contexts where ence of NGOSs in Haïti has found that even the
violence and criminal activity is prevalent, lack of explicit formal approval from govern-
there can be specific challenges to facilitating ment can constrain community engagement
#7 PRODEPUR is an urban community-driven development project whose objective is to improve access and satisfaction with basic
and social infrastructure and services, and income-generating opportunities for residents of targeted disadvantaged urban areas.
28 Bases combine local leadership, political affiliation, cultural expression, and criminal activity.
2 As stressed in a recent effort to compile lessons learned from CDD projects in seven different countries (Indonesia, Vietnam,
Benin, Morocco, Kyrgyz Republic, Tanzania, and Haïti), most CDD projects across the world have been implemented in rural
areas and thus the literature on urban CDDs is still in its infancy.
#The WDR 2100 defines “inclusive-enough” coalitions as those that include the parties necessary for implementing the initial
stages of confidence-building and institutional transformation; but they do not need to be “all-inclusive” (p12).
84
[page 101]
and willingness to act (Pelling 2011). Further- aim to address social exclusion often need
more, as current experience in Haïti indicates, to be designed to stretch across adminis-
the long-term sustainability of the projects can trative boundaries in urban areas. Those
benefit from improved engagement of local that focus on specific settlements such as
government. Recent assessments of PREKAD “slum upgrading,” need to carefully weigh
and PRODEPUR projects noted that invest- how the intervention may impact different
ments could have been better linked to local groups, such as renters, who may not actively
development plans, and that there is a need to engage in the project but could be harmed
secure long-term commitment for operation by price effects associated with infrastruc-
and maintenance of the services from relevant ture improvement. CDD project design
local government authorities. Indeed, as must be flexible, as social dynamics that
discussed in Chapter 4, in these projects and regulate community engagement are likely
other cases where local governments partner to differ across city center, peri-urban areas,
with NGOs and cities in other countries, the and small towns, and even to be impacted
programs have relied on delegated implemen- by specific events or shocks such as natural
tation rather than strengthening local govern- disasters (Arnold 2015).
ment delivery capacity.
CDD approaches can help build local Build on what works to consolidate basic
government capacity, if they are designed to service delivery
support local governments to take respon- Improvements in basic services can be
sibility for service provision in the medium regarded as a ladder, whereby each successful
term. CDD projects are often designed to modernization effort also builds capacity,
build capacity among local community which in turn makes it viable to undertake
implementation teams to conduct activities new, more advanced, initiatives led directly
such as procurement, as well as to establish by local governments. Improving basic
processes that deter fraud and corruption. service management and delivery requires
These include transparency of budgeting, a comprehensive effort to reform organi-
internal and external third party monitoring, zational structure, build capacity in local
and establishment of grievance redress governments, and raise awareness. Attempts
mechanisms. Similar tools can be built to plug leaking services with piecemeal inter-
into CDD projects to help strengthen local ventions risks trapping Haitian cities in a
government engagement and performance low-level equilibrium of poor services and
(World Bank online). Looking ahead, it will high costs. Yet it is unrealistic to expect that
be important that CDD projects are designed complex and large-scale reform can be done
to support eventual increased responsibility all at once. As such, it is important to prior-
and effective delivery of services by munici- itize short-term initiatives that are linked to
palities. long-term gains in the resilience and quality
Thirdly, because benefits and costs spill of services.
across administrative boundaries, coordi- The Government of Haïti (GoH), through
nation is key to maximize the positive the Ministry of Interior and Local Authori-
impacts of interventions. CDD projects that ties (MICT), has made important progress
85
[page 102]
in pushing the decentralization reform by strengthening. For example, the Jamaica
directly empowering municipalities and Social Investment Fund (JSIF) provides
developing various local support initia- community groups results-based support to
tives.i! As opposed to channeling funds maintain a clean community; environmental
through community-based organizations to wardens have been established to enforce
respond to basic service delivery needs, the local littering and ensure maintenance of the
GoH is directly empowering municipalities community; and training opportunities with
to finance and operate local investments in the goal of improving community participa-
accordance with local and sectorial develop- tion and pride and the sense of security in
ment plans. Nevertheless, the participatory urban spaces.
approaches utilized in previously imple- For municipalities that are taking on
mented CDD projects remain relevant to management services for the first time, initial
ensure community participation, transpar- objectives could concentrate on building
ency, and accountability. the basis for service provision. These could
Programs that encourage good perfor- include, for example, procedures to plan
mance on service delivery by providing grants service delivery in line with budget plans and
or financing based on results or outputs can execution, manage procurement processes,
improve service provision in the short term and communicate effectively with citizens,
and contribute to building capacity in the long as well as key skills related to infrastructure
term. National governments can use their planning and operations and maintenance
transfer systems to provide financial resources systems. One example of such an initiative
to municipalities in the form of grants or other is the “Proyecto de Desarrollo Municipal”
transfers to execute their duties and provide (PRODEM) project in the Dominican
basic services provided they meet perfor- Republic. This project worked with small
mance criteria reviewed annually. When municipalities (populations between 2,000
these projects are framed in terms of broader and 50,000 people) in the three poorest
programmatic objectives, they can effectively provinces of the country. The project provides
tackle immediate challenges while building comprehensive capacity building, including
capacity for the longer term. Solid waste reorganization of staff, financial management
services can provide a good example where training and software, creation of municipal
service performance-incentivized improve- development plans, infrastructure planning,
ments can both help to address service participatory budgeting, and transparency
deficits and contribute to local government and reorganization and optimization of basic
# Local development support programs are coordinated by Ministry of Interior and Local Authorities (MICT). Recent municipal
development activities build on two flagship initiatives from MICT in the Nord and Nord-Est départements of the country, the
Programme d’Intervention Nord /Nord-Est (PINNE), which aims at strengthening municipal administrative structures, and the
Appui à la Gouvernance et à l’Investissement Local en Haiti (AGIL) funded by the European Union in sixteen municipalities in the
Nord and Nord-Est départements. The AGIL aims to empower municipalities in managing resources for local service delivery. Lokal
+ is a USAID-funded project that supports local governance and decentralization in Haiti, including revenue collection support.
2 The approach was successful in 28 of the 31 municipalities: they reached these three levels of performance and rewarded with
a variety of works including parks, recreational facilities, cemeteries and fire stations (a total of 85 were constructed).
86
[page 103]
services. Às a reward for reaching each ofthree noted above, resilient planning is fundamen-
defined levels of performance, the municipali- tally about guiding the decisions taken by
ties are provided a public worker to help them households, firms, and government, in order
support their ability to execute their services.3? to minimize risk exposure and to ensure
In areas where some service structures are that the resulting urban form is supportive
already in place, initiatives can be undertaken of broader development objectives. As the
to help consolidate capacity and better leverage examples below highlight, the very act of
existing resources, such as output-based aid. making information public can be a tool to
Output-based aid uses performance-based catalyze citizen engagement in collective
subsidies to improve delivery of services in action and build trust in government.
underserved areas, sectors, or households.
Output-based aid ties the disbursement of Disseminate risk-analysis insights to support
public funding in the form of subsidies to the informed decision making
achievement of clearly specified results that Accurate, accessible information is
directly support improved access to services, needed to support non-structural measures
including improved water supply and sanita- for protecting people from risk. There have
tion and access to services such as energy, been important advances in understanding
health care, education, solid waste manage- the risks that urban areas in Haiti face.
ment, and transportation. For example, Several knowledge tools were developed
in the Southern West Bank, subsidies are after the earthquake to inform reconstruc-
being paid to solid waste service providers in tion processes and strengthen DRM infor-
response to independently verified improve- mation necessary for planning. These
ment in cleaning, collection and disposal include information on (i) hazards and risks
services, and improved financial sustain- (multi-hazard risk assessments, hazard
ability. The program improved the cost-re- atlas, and historical data on damages and
covery mechanisms with over 90 percent of losses from PDNAs), (ii) Seismic Zonation
the service providers achieving these outputs Mapping by MTPTC; (iii) location of
and receiving the corresponding subsidy. In exposed assets (georeferenced critical infra-
Nepal, a similar project is under implementa- structure like schools, hospitals, and roads);
tion that is expected to benefit 800,000 people (iv) high-resolution satellite imagery and
in five participating municipalities. Lidar for the country; and (v) full diagnostic
of the fiscal and economic impacts of
In the medium term, leverage information disasters in Haiti. Given the high level of
to facilitate coordinated decision making exposure and vulnerability of Haitian cities
One way to guide decisions is by making to multiple natural hazards, it is an imper-
relevant information available to households, ative to leverage this information to reduce
firms, and different local governments. As risk through structural corrective measures
3 For further details, see Analysis of Multiple Natural Hazards in Haiti (NATHAT) and the Guide Méthodologique Réduction
des Risque Naturels en Zone Urbain en Haiti (Government of Haiti/UNDP [2015]). See also World Bank 2015b.
87
[page 104]
and land use planning preventive measures, The cost of mapping by drones is much
as well as to improve disaster preparedness lower than aerial photography and can
and response capacity of national and local bring additional benefits. Drones fly at
authorities and urban communities. around 100 meters above the ground and
Publicly available risk information can always within contact by remote control.
be used to support vital non-structural They are thus not affected by cloud cover
flood risk measures. These non-struc- and can be deployed even in the immediate
tural measures include: (i) emergency aftermath of natural disasters to assess
planning, such as the development of damage, as was demonstrated in Haitiinthe
flood evacuation plans and alert systems; aftermath of Hurricane Matthew. Beyond
and (ii) information-based campaigns data collection, it is important to note that
designed to encourage flood risk mitigating the introduction of this new technology can
behavior, such as minimizing flood risk also present an opportunity to engage local
by keeping drains clear and adjusted solid officials and citizens on risks. Specifically,
waste management practices (Jha et al. it is important to leverage opportunities for
2012). Past experience in Haiti testifies data sharing, as the technology creates new
to the effectiveness of such initiatives. In avenues to communicate the information
areas such as Camp Perrin, in Les Cayes collected, which can in turn be a catalyst
arrondissement, civil protection initiatives for behavior change.
proved to be lifesaving during Hurricane In Tanzania, drones were used to map
Matthew in 2016. Two months prior to the flood plains in Dar es Salaam, the country’'s
hurricane 100 families in the most at-risk largest city. The information was used
neighborhoods took part in a disaster to plan and predict how water will move
simulation exercise, and it is notable that in the event of a flood. À team of local
these families were all kept safe during the researchers, local government officials,
real-life devastation of the hurricane that and land surveyors were trained in the
followed (UNDP 2016a). Furthermore, the use of the new technology. This training
civil protection volunteer group (brigadiers) can be completed within a period of one
sprang into action ahead of the disaster - or two weeks. In addition to this, over
spreading information about the storm and the course of the project, it became clear
preparing evacuation centers - as well as in that the excitement generated by the new
the immediate aftermath by clearing access technology helped to build communication
to hospitals (UNDP 2016b). There is room and engagement between local government
to replicate this experience in urban areas and communities in the mapped hazard
more broadly. Technological innovation areas. Maps can be printed out for discus-
is providing new opportunities to engage sion with the community, the informa-
citizens and disseminate information on tion can be updated simultaneously on a
risks. In Haiti and in other countries across computer, and the corrected final product
the world, Unmanned Aerial Vehicles (UAVS can then reprinted for verification before
or drones) are increasingly being employed being incorporated into land records. As a
to provide information on disaster risks. result of these positive initial experiences,
88
[page 105]
a much larger-scale project is underway to the incentives to implement the decisions. Yet
use drones for cadastral mapping in the compliance can also be encouraged another
island of Zanzibar.%4 way: by making clear and credible informa-
tion available to households.
Use information to align incentives: aim Simple plans - that are disseminated - can
for the best but prepare for the worst be highly effective in guiding new develop-
Basic infrastructure investment is urgent ment. One example of this is the approach
and costly. There are economies of scale in used in Tunis, Tunisia. By making vital
urban service provision: the cost of providing information widely available to households,
piped water in cities is estimated to be about the local government was able to guide their
three times lower per capita than in sparsely choices. This approach aims for the best,
populated areas.3 But it can be much more but prepares for the worst (acknowledging
expensive and complicated to provide basic that its vision for urban development faces
services to unplanned areas than it is to put short-term financial constraints). Rather
in place trunk infrastructure ahead of devel- than trying to restrict urban expansion into
opment. By some estimates, investing in unplanned areas, the government instead
basic service infrastructure ahead of devel- decided to provide clear and transparent
opment is two to three times cheaper than information to the public on the future infra-
“slum upgrading” (Akibo 2007), and every structure expansion plans. Households, who
dollar spent on disaster risk mitigation saves are settling in what today are unplanned and
society four dollars (Multihazard Mitigations unserviced areas, can use this information
Council, 2005). Planning ahead can help save to make sure that rights of way are left clear
financial resources. for this future investment. This benefits the
Yet how can governments effectively government by reducing the costs of invest-
plan ahead without the financial or insti- ment, but it also benefits the households, as
tutional capacity to fully implement plans? they are less likely to be adversely affected by
Às discussed above, urban plans can be an future interventions.
effective tool to anticipate urban growth and The example of Tunis shows that by
infrastructure needs. Many important efforts disseminating information on future public
to develop plans have been undertaken in investment, public authorities can help
Haiti in recent years. There is, however, a guide urban expansion. This simple regula-
discrepancy between the visions set out in tion can reduce infrastructure investment
the plans and the reality on the ground. One costs in the long term and helps maintain the
major constraint to effective use of plans is presence and capacity of the state in areas of
that local actors have neither the funds nor urban expansion. In addition to this, given
#There are important considerations around the use of new technology such as drones that need to be carefully considered. For
one, few countries have established a functioning regulatory framework to govern the use of drones. The imagery produced
by drones has a resolution of around three centimetres per pixel, which is sufficiently high resolution that potential privacy
issues should be carefully considered. For further details on this project, see World Bank (2016a; 2016b).
3 The price is approximately USD 0.70 to USD 0.80 per cubic meter to provide piped water in urban areas, versus USD 2 in
sparsely populated areas.
89
[page 106]
that much of the land around Haïtian cities in Brazil. Sao Bernardo is one of 39 munic-
is prone to natural disasters, it can also be ipalities that make up the Sao Paulo Metro-
a good opportunity to guide urban develop- politan Region. The municipality is located
ment to be more resilient. Specifically, the next to the Billings Reservoir of the Alto Tiete
government can use hazard risk maps not watershed, and it has experienced rapid and
only to inform decisions about the location informal population growth of largely poor and
of future infrastructure, but also to communi- marginalized communities along the water’s
cate information about risks with the public. edge. This pattern of growth has presented the
There is thus the opportunity not only to save municipality with many serious challenges.
costs by preserving rights of way for infra- For one, the Billings Reservoir is the primary
structure investment, but also to help reduce source of water for nearly 5 million people and
exposure to hazard by ensuring that risk a constitutive part of a wider watershed system
information is reflected in both public and that supplies 70 percent of the vast metropol-
private investment decisions. itan region’s 20 million inhabitants. Informal
population growth has been associated with
Integrate flood risk knowledge into trans- a rapid decline in the quality of the water, as
parent urban infrastructure investment untreated sewage, solid waste, and storm water
decision making runoff have increasingly polluted the reservoir.
Important win-wins could be achieved by For another, the ground has become increas-
integrating flood risk management informa- ingly impermeable and subject to flooding.
tion with the northern-corridor development À careful program of data collection and
objectives in Haiti. As recent planning efforts community engagement created the oppor-
highlight, the North and Northeast areas of tunity for coordinated action on flooding
the country are marked by population growth and build coalitions for collective action. The
pressure, deficits of basic services and trans- municipality of Sao Bernardo started by identi-
portation infrastructure, and significant flood fying at-risk informal settlements, located in
risks (World Bank 2017b). The costs of “doing fragile watershed areas (World Bank 2013b).3
nothing” in this area are high: continued Armed with empirical evidence on social,
development in this line will lead to increasing environmental, and economic conditions in
numbers of people at risk of floods, as well as these settlements, the municipality was able to
growing environmental pressures. Case studies establish a system of prioritizing investments
from around the world indicate that real gains that met both the utility company’'s concerns
can be attained by leveraging information on over water quality in the watershed and local
flood risks to guide coordinated, integrated residents’ needs for improved services. Invest-
action to build resilient and sustainable cities. ments in new sewage network connections,
One successful example of this comes from storm water drainage infrastructure, and
the municipality of Sao Bernardo do Campo, public transportation services were combined
#The municipality identified 261 precarious and informal settlements, of which 151 were in the environmentally fragile watershed
area, and 65 were considered to be at high risk of natural disasters. They developed a transparent system of prioritization based
on a combination of social, environmental, and financial considerations to identify 52 settlements for intervention.
90
[page 107]
with public meetings and information dissem- efforts must be carefully sequenced and
ination in schools to encourage environmental prioritized, since - as Haitian reformers
behavior change. New parks were created to experienced in the early 20008 - too much
serve the tripartite purpose of providing “green institutional reform, too quickly, can overtax
areas” to absorb storm water, a buffer between and undermine appetite for change (World
urban growth and the reservoir, and public Bank 2011b, p145).
space with amenities for outdoor activities and
promotion of social inclusion. All the informa- Strengthen property rights with dis-
tion was made public through a custom-made pute-resolution mechanisms
online mapping system.%7 which municipal The establishment of a single authorita-
authorities believe helped build trust in the tive, transparent, accessible, and accurate
government in marginalized communities. record of land ownership is vital for resilient
Furthermore, it is likely that this focused urban development. The lack of transparent
project has spillover benefits: by helping to land ownership records leads to inefficien-
build institutional experience of integrating cies in basic service investment, opens
workflows across different government author- avenues for debilitating corruption, and
ities, it provides the foundation for future makes the urban poor vulnerable to eviction.
integrated policy development in other sectors In addition to this, clear land records are
and areas. needed to effectively integrate risks maps
and other knowledge on DRM information
In the long term, strengthen property - such as insurance coverage levels, exposed
rights and promote institutional reform values of assets, information on the impact
for improved governance of former disasters - into effective land use
The government of Haiti has made planning and disaster risk management.
commitments to long-term projects that The establishment of a working cadastre is,
can fundamentally improve resilient urban however, a long-term project: past experience
planning, such as reforming property rights in Haiti, and comparable experience from
and decentralization. These are important around the world, highlight that there are
and challenging commitments. Progress many challenges to cadastral reform. For the
should be contextualized in the broader new system to be successful, the records must
effort toward institutional transformation be accurate, legitimate, and easily accessible.
in Haiti, which has included, inter alia, Sound expectation and management of costs
reforms to the justice, electoral, revenue is also important, as cadastres are expensive
collection, and anti-crime sectors (World to establish and maintain.8 Furthermore,
Bank 2011b). Decisions over the pace, focus, there are specific challenges to transforming
and sequencing of institutional reform institutions in fragile and conflict-affected
#This system is known as “HABISP” (http:/sihisb.saobernardo.sp.gov.br).
# The “one-off” cost of establishing a cadastre are often borne by public finances. In many countries, the running costs -
including updating records - are covered through user fees (Hawerk, online). It is important to consider how cost-recovery
models may affect accessibility and perceptions over the transparency of the cadastre.
91
[page 108]
states.% Indeed, property rights reform and processes. ADR is a method that can vary
titling initiatives can in themselves become from facilitated direct negotiations between
a source of conflict; they can even result in two interested parties to efforts that more
increased vulnerability among the urban closely resemble courtroom processes, and
poor by introducing new procedures that it has been adopted for a wide range of
they are disadvantaged to navigate (DFID contexts, from the Democratic Republic of
2002; Payne, Durand-Lasserve, and Rakodi Congo to Chile (Herrera and da Passano
2009).4 One approach may be to prioritize 2006; UN Habitat 2012; UN Habitat 2013;
improvements to titling and registration of and Vlassenroot 2012).4! In some cases, it
plots for new housing development in order relies on local leaders with high levels of
to lower costs (Hoek-Smit 2013). social recognition, who, as research from
Sequencing matters: effective Mali and Kenya suggests, may be regarded
dispute-resolution mechanisms are a key as better placed to solve land disputes than
foundation for broader reforms. At present, the official court systems (World Bank
Haitian courts are burdened with a backlog 2011b, p155).
of unresolved property rights disputes.
These disputes may intensify with efforts For Haiti’s largest cities, build frame-
to reform land tenure and indeed in the works for municipal cooperation
creation of an official registry of land; The footprint of urban economic activity
it is therefore important that conflict- is often much wider than traditional
and dispute-resolution mechanisms are administrative boundaries. As highlighted
strengthened. Alternative Dispute Resolu- in Spotlight 2, Haitian urban areas are
tion (ADR) mechanisms can be useful in expanding into larger agglomerations.
helping to reduce the pressure on courts, As Haiti continues in the process toward
resolve conflicts effectively, and even help political and fiscal decentralization, it will
build confidence in formal land property be important to consider that coordina-
= The WDR 2011 defines institutional transformation as “[dJeveloping over time ‘rules of the game’ that increase resilience to
risks of violence, including laws, organizations, norms of behaviour, and shared beliefs that ensure that the benefits from
individuals choosing to act peacefully and lawfully exceed the costs.”
4The national housing plan of 2013 notes that the state will adopt a real estate policy that supports equitable and fair property
rights, including land use tenure. To date there have been a number of pilot projects to this end, including a USAID-funded
pilot project to map 10,000 plots in the Port-au-Prince neighborhoods of Delmas 32 and Carrefour-Feuille (USAID 2016).
This initiative aims to record information on land tenure and housing ownership. Habitat for Humanity created the Haiti
Property Law Working Group in 2011 focused on “longstanding land tenure issues.”
# In Congo, the process for land conflict resolution mediation is composed of ten main steps: 1) request for mediation from
the land mediator; 2) analysis of the context, scope, object, and causes of the conflict; 3) invitation of parties, witnesses,
or resource people (this invitation may be made directly or through an intermediary; 4) exchanges between the parties or
witnesses; 5) review and analysis of facts to identify the implications of the conflict; 6) analysis of documents or components
of the file/tenure certificate or title deeds; 7) listening to witnesses (chiefs, administrative authorities, neighbors or residents,
etc.; 8) visits to the area to assess the conflict, to understand the respective claims of the parties; 9) exploration of possible
solutions, assisting the parties to draft agreements and signing the arrangement; 10) collective monitoring and implementa-
tion of agreement (UN Habitat 2012; UN Habitat 2013; and Vlassenroot 2012)
92
[page 109]
tion across these adjacent municipalities is regional or national authorities to provide
often beneficial. Job growth in one munici- disposal (Peru). In the case of Colombia, the
pality is likely to attract workers from a wide framework leverages the financial incentives
catchment area and rely on transporting provided by direct disposal facilities while
inputs and outputs across large distances. No regulating the nature of disposal services
municipality can single-handedly support to ensure jurisdictional boundaries do not
these processes and manage the associated limit the access to service. As Haïti moves
challenges, such as pollution and congestion. toward implementing decentralization
Às discussed in Chapter 4, in the context of objectives, it will be important to learn from
limited financial resources, creation of new these experiences and develop an effective
local entities may lead to increased strains means of incentivizing coordination for
in resources. Yet without coordination, it service delivery.
is likely there will be wasteful duplication
of activities or policies may be undermined
because they are contradicted by policy
choices of neighbors (Samad, Lozano-Gracia,
and Panman 2012). As such, it is important
to consider how coordination across existing
municipal boundaries can be facilitated.
À number of initiatives are currently
underway to encourage coordination across
municipal and even departmental bound-
aries, focusing on waste services.4? Yet,
without strong institutional frameworks in
place to promote cooperation, these efforts
face many challenges. Indeed, international
experience suggests that countries that have
been successful in establishing multiple
shared facilities have done so within a
national framework to facilitate coopera-
tive agreements. There are multiple ways
to develop such a framework In some Latin
American countries, access to finance is the
main incentive (Argentina and Brazil), while
others have established legal mandates for
# In the metropolitan region of Cap-Haïtien, the Association Intercommunale de Traitement des Ordures Ménagères Le
Marien was created. This association includes the Cap-Haïtien, Quartier Morin, and Limonade municipalities, which are
located in two separate departments (North and Northeast). The association is financed by AGIL and the AFD. Similarly,
efforts are underway to forge cooperation between the municipalities of Caracol, Trou du Nord, Terrier Rouge, and Limonade
(financed by IADB).
93
[page 110]
REFERENCES to reconstruction blocked by land
tenure disputes. Reuters. Retrieved from
http://www.reuters.com/article/us-hai-
Abiko, AÀ., L.R. de Azevedo Cardoso, R. ti-land-idUSBRE90POBM20130126
Rinaldelli, and H.C.R. Haga. 2007. Basic Fuller, J. A., T. Clasen, M. Heijnen, and J.N.
costs of slum upgrading in Brazil. Global Eisenberg. 2014. “Shared sanitation
Urban Development Magazine, 3(1). and the prevalence of diarrhea in young
Ambraseys, N., and R. Bilham. 2011. Corrup- children: evidence from 51 countries,
tion Kills. Nature 460: 153-155. 2001-2011. The American journalof tropical
Amnesty International. 2015. “Ten Facts medicine and hygiene, 91(1), 173-180.
About Haitis Housing Crisis,” from GFDRR. 2011. Turkish Catastrophe
https://www.amnesty.org/en/latest/ Insurance Pool: Providing Affordable
news/2015/o1/ten-facts-about-haiti-s- Earthquake Risk Insurance, from http://
housing-crisis/ www.gfdrr.org/sites/gfdrr.org/files/
Arnold, M. 2015. World - Participatory and documents/DFITCIP_Jan11.pdf
Community Driven Development in Urban Government of Haïti. 2013. Politique
Areas. Washington, DC: World Bank. Nationale du Logement et de l'Habitat
Davis, M., and A. Rappaport. 2014. Air (PNLH)
Quality in Developing World Disaster ———. (2010). Analysis of Multiple Natural
and Conflict Zones - The Case of Hazards in Haiti (NATHAT)
Post-Earthquake Haiti. Science ofthe Total Government of Haiti/UNDP. 2015. Guide
Environment 496: 22-25. méthodologique Réduction des Risque
DFID. 2002. Better Livelihoods for Poor People: Naturels en Zone Urbain en Haiti.
The Role of Land Policy. Consultation Graham, J. P., and M.L. Polizzotto. 2013. Pit
Draft. latrines and their impacts on ground-
de Waal, À. 2009. Why Humanitarian water quality: a systematic review.
Organizations Need to Tackle Land Environmental health perspectives, 121.
Issues. In S. Pantulizano (Ed.), Unchar- Hawerk, W. Cadastral Systems in Devel-
tered Territory: Land, Conflict and oping Countries - Technical Options,
Humanitarian Action. Warwickshire, from https://www.fig.net/organisa-
UK: Practical Action Publishing. tion/comm/7/activities/reports/events/
Denney, L., R. Mallett, and D. Mazurana. penang97/penango710.htm
2015. Thematic Paper on Peacebuilding Heiïjnen, M., O. Cumming, R. Peletz, G.
and Service Delivery. United Nations Ka-Seen Chan, J. Brown, K. Baker, and
University. T. Clasen. 2014. Shared sanitation versus
Etienne, H. F. 2012. “Land Rights, Land individual household latrines: a system-
Tenure, and Urban Recovery: Rebuilding atic review of health outcomes. PLoS One,
Post-Earthquake Port-au-Prince and 9(4).
Léogâne,” Oxfam America Research Herrera, A., and M.G. da Passano. 2006. Land
Backgrounder series. Tenure Alternative Conflict Manage-
Ferreira, S. (2013, January 26). Haiti’s road ment. FAO Land Tenure Manuals 2,
94
[page 111]
Rome, FAO. Critical Review. The World Bank Research
Hoek-Smit, M. 2013. Options for Expanding Observer 19(1): 1-30.
Access to Housing Finance in Haiti. Multihazard Mitigations Council (MMC).
Discussion Note. 2005. Natural Hazard Mitigation Saves:
Hoornweg, D., and P. Bhada-Tata. 2012. An Independent Study to Assess the
What a Waste: À Global Review of Solid Future Savings from Mitigation Activi-
Waste Management. Urban Develop- ties. Volume 1 - Findings, Conclusions
ment Series; Knowledge Papers No. 15, and Recommendations.
World Bank, Washington, DC. OAS (2010). Foncier Haiti: Modernization of
IMF. 2015. Haiti - Selected Issues, IMF Cadastre and Land Rights Infrastructure
Country Report, May 2015 in Haiti. An Inclusive Approach.
——— 2014. Poverty Reduction Strategy Oriol, M., B. Jacquet, and A. Touati. Imple-
Paper. mentation challenges of land adminis-
International Housing Coalition. 2011. Haïti tration in rural areas of Haïti: from the
Shelter Sector Assessment: One Year After elaboration of a pre-cadaster methodlogy
the Earthquake. International Housing to the land tenure reform. Paper prepared
Coalition: Washington D.C. for 2016 World Bank Conference on Land
Jha, À. K., R. Bloch, and J. Lamond. 2012. and Poverty. World Bank. Washington,
Cities and flooding: a guide to integrated DC, March 20-24, 2016
urban flood risk management for the 21st Payne, G., À. Durand-Lasserve, and C.
century. World Bank Publications. Rakodi. 2000. The Limits of Land Titling
Jones, S., and S. Howarth. 2012. “Supporting and Home Ownership” Environment and
Infrastructure Development in Fragile Urbanization 21 (2): 443-62.
and Conflict-Affected States: Learning Pelling, M. 2011. Urban Governance
from Experience,” UKAID Report. and Disaster Risk Reduction in the
Katz, J. M. (2014, March 12). “Haiti's shadow Caribbean: The Experiences of Oxfam
sanitation system.” The New Yorker. GB. Environment & Urbanization 23(2).
Klose, C. 2011. Evidence for Higher Tropical Samad, T., N. Lozano-Gracia, and A.
Storm Risks in Haiti Due to Increasing Panman. 2012. Colombia Urbanization
Population Density in Hazard Prone Review: Amplifying the Gains from the
Urban Areas. Environmental Research Urban Transition. Directions in Develop-
Letters 6(4):1-4. ment. Washington, DC: World Bank.
Lall, S.V., JV. Henderson, and A.J. Venables. Singh, R. J., and M.A. Barton-Dock. 2015.
2017. Africa’s Cities: Opening Doors to the Haiti - Toward a new narrative: system-
World. Washington, DC: World Bank. atic country diagnostic. Washington, DC:
Lherisson, G. 2015. Principes, règlements World Bank.
& outils opérationnels de la législation Solid Waste Association of North America
haïtienne sur le développement urbain, (SWANA). 2010. “Municipal Solid Waste
Port au Prince. Collection Needs in Port-au-Prince,
Mansuri, G., and V. Rao. (2004). Commu- Haiti” Position Paper.
nity-Based and Driven Development: À Tarter, A.M., K.K. Freeman, K. Sanders.
95
[page 112]
2016. À History of Landscape-level Land Participatory Approach. Report on
Management Efforts in Haiti Lessons the seminar held in Brussels on 20-21
Learned from Case Studies Spanning Eight September 2012.
Decades. Washington, DC: World Bank. WHO/PAHO. (31 July 2013). “Addressing
Tilmans, S., K. Russel, R. Sklar, L. Page, S. Waste Management in Haiti” Online
Kramer, and J. Davis. 2015. Contain- Blog.
er-Based Sanitation: Assessing Costs and World Bank. 2010. Haiti Earthquake PDNA:
Effectiveness of Excreta Management Assessment of damage, losses, general and
in Cap-Haïtien, Haiti. Environment & sectoral needs. Washington, DC: World
Urbanization 27(1): 89-104. Bank.
UNDP. 2016a. “Haiti Civil Protection Volun- ———. 2011. Violence in the City: Under-
teers Put Others First,” from http:/ standing and Supporting Community
stories.undp.org/haiti-civil-protec- Responses to Urban Violence.
tion-volunteers-put-others-first Washington, DC: World Bank.
UNDP. 2016b. “Haiti Rising After the Storm.” ———. 2011b. World Development Report 2011:
from http://stories.undp.org/haiti-rising- Conflict, Security and Development.
after-the-storm. Washington, DC: World Bank.
UN Habitat. 2011. Blog: “Port-au-Prince ———. 2012. “Integrated Urban Water
hosts ‘the city we want forum,” from Management Case Study: Sao Paul”
http://mirror.unhabitat.org/content. from http://siteresources.worldbank.
asp?cid=-10674&catid-153&. org/INTLAC/Resources/257803-
———. 2012. “Cap-Haïtien Urban Profile.” 1351801841279/SaoPauloCaseStudyENG.
———. 2012. “Milot Urban Profile.” pdf.
———. 2012. “Toolkit and Guidance for ———. 2013. Indonesia: Evaluation of the
Preventing and Managing Land and Urban Community Driven Development
Natural Resources Conflict.” Program - Program Nasional Pember-
———. 2013. Guide to Land Mediation: dayaan Masyarakat Mandiri Perkotaan
Based on the Experience in the Eastern (PNPM-Urban).
Democratic Republic of the Congo, ISBN ———.2013b. Blue Water Green Cities Interna-
No. (Volume): 978-902 -1-132559-1. tional Workshop, December 4-6 2013, Sao
USAID. 2016. “Haiti Housing & Settlements Paulo, Presentations by Amauri Pollachi
Fact Sheet.” and Tassia Regina, from http://web.
———. 2010. Land Tenure And Property worldbank.org/WBSITE/EXTERNAL/
Rights In Haiti The Importance Of Land COUNTRIES/LACEXT/0,,content-
Tenure And Property Rights Issues and MDK:23328153-pagePK:146736-piP-
Post-Earthquake Recovery In Haiti. K:146830-theSitePK:258554,00.html.
Property Rights And Resource Gover- ———. 2014. “Haiti Conference on Clean
nance Briefing Paper 6. Water, Improved Sanitation and Better
Vlassenroot, K. (Ed.). 2012. Dealing with Health.” Working Paper.
Land Issues and Conflict in Eastern ———. 2015a. Haiti Country Partnership
Congo: Towards an Integrated and Framework, FY 2016-2019.
96
[page 113]
———.8 January 2015b. “What Haiti Taught
Us AL” World Bank Blog. http://blogs.
worldbank.org/latinamerica/what-haiti-
taught-us-all.
———. 2016a. “Drones Offer Innova-
tive Solution for Local Mapping.”
Online Feature Story, from http://
www.worldbank.org/en/news/
feature/2016/01/07/drones-offer-innova-
tive-solution-for-local-mapping.
———. 2016b. “Tanzania: Using Drone
Technology to Secure Land Rights.”
Online; https://irevolutions.
org/2015/08/19/world-bank-using-uavs/.
———.2017a. World Development Report 2017:
Governance and the Law. Washington,
DC: World Bank.
———. 2017b. Project Appraisal Document:
Municipal Development and Urban
Resilience Project.
——— Online. CDD Toolkit. Governance and
Accountability Dimensions. Guidance
note: Enhancing Governance and
Accountability in Community-Driven
Development-Based Operations. An
Overview of Risks and Responses.
Yazdani, M., D. Bercovitch, and J.
Charles-Voltaire. 2014. Knowledge
transfer on urban violence: from Brazil
to Haïti. Environment and Urbanization,
26(2), 457-468.
97
[page 114]
[page 115]
SPOTLIGHT 2: PATTERNS OF LAND USE
WITHIN CITIES
Sarah E. Antos*
Improved urban policies and investments require more, better quality and up-to-date informa-
tion on the way cities are growing. Recent studies suggest that the pattern and form ofurbanization
may be as important as the speed of growth (Christiaensen, Weerdt, and Todo 2013; Christiaensen
and Todo 2014). In fact, as cities grow, large infrastructure investments will be necessary to facil-
itate the moves of goods and services, support the exchange of knowledge and ideas, and provide
good quality of life for its residents. But in order to maximize the social and economic returns of
these investments, infrastructure provision must be tuned with the spatial layout of people and
land. Otherwise, there is the risk of resources being wasted and large populations remaining under-
served, disconnected from jobs and markets.
To understand the way cities are growing, we turn to very high-resolution satellite images to
draw a characterization of land use patterns in Haïitian cities. We use high-resolution imagery to
identify numerous land cover types, using a semi-automated algorithm. These high-resolution
(socm) scenes are transformed into land cover maps using the methodology developed by Graesser
et al. (2012). This process allows us to use both spectral and textural information from the images
to distinguish between different uses, such as forested areas, residential buildings, and industrial
warehouses.! Originally created to accurately detect shanties in major cities throughout the world,
this method has been proven effective in a diverse set of cities (Kandahar, Kabul, Caracas, and
La Paz).? Furthermore, it has been shown to be effective at capturing land cover change in five
primary cities in Africa by Antos, Lozano-Gracia, and Lall (2016). Since its creation, it has been
adopted by the US Census Bureau, US Department of Energy's Oakridge Laboratory, and The
George Washington University.4 The methodology is used to derive land cover maps for nine citiess
in Haiti over two points in time. For further details of the methodology, see Box 1.
*Exum et al. (2005). Estimating and Projecting Impervious Cover in the Southeastern United States. US Environmental Protection Agency.
2 Graesser et al. 2012 Image-based Characterization of formal and informal neighborhoods in an urban landscape. IEEE
Journal of Selected Topics in Applied Earth Observations and Remote Sensing 5 (4) August:1164-1176.
sAntos, Sarah Elizabeth and Lall, Somik V. and Lozano-Gracia, Nancy, The Morphology of African Cities (December 9, 2016).
World Bank Policy Research Working Paper No. 7911. Available at SSRN: https://ssrn.com/abstract=2883394
4 High-Resolution Urban Image Classification Using Extended Features: Data Mining Workshops (ICDMW), 2011 IEEE 11ith
International Conference Dec. 2011. Author: Vatsavai, R.R. Published by IEEE.
S These include: Cap-Haïtien, Port-au-Prince, Quanaminthe, Fort Liberté, Jérémie, L'Estere, Mirebalais, Jacmel and Miragoane.
*The imagery classification and analysis was led by Sarah E. Antos, with the valuable support of Lauren Nicole Dauphin. The
analysis was enriched by local expertise and auxiliary data provided by Haitis National Center for Geospatial Information
(CNIGS) and the general guidance of World Bank’s Geospatial Operational Support Team (GOST).
99
[page 116]
The analysis reveals that Port-au-Prince is crowded and increasing in density over time. Being
the largest urban agglomeration in the country, Port-au-Prince has over ten times the built-up
area of any other urban area in the country, and more built-up area than the rest of the country
combined. Port-au-Prince is also very densely populated, with approximately 32,500 people per
sq. km between 1 and 2 kilometers from the city center (taken as the Marché en Fer - Iron Market).
These are density levels that are comparable with certain areas of Manhattan, despite there being
very few high-rise buildings. The density progressively declines the farther away from the market
you go, but increases once more between the sixth and seventh kilometers from the center, where
two of the densest municipalities are located - Petionville and Delmas. It is notable, as well, that
the ratio of growth between Port-au-Prince and Croix-des-Bouquets remained constant between
1975 and 2011, indicating that the center of the city continued to densify overtime.
BOX 1 - THE UNCERTAINTY IN LAND LAWS AND ITS IMPACT ON PEOPLE'S LIVES
À semi-automated classification approach can be used to examine the texture and structural composition of
various neighborhoods, grouping land with similar patterns into a single class.f For this work, such an approach
was used to detect roads and ultimately combined with a vector road network from CNIGS.7 This vector line
Was then converted to a raster and merged into the classified layer so a final land cover map could show primary,
secondary, and residential roads.
Particular attention was given to dividing up the “residential”-looking neighborhoods into regular and irregular,
and for Cap-Haïtien a residential sparse class was added. Residential sparse was defined as having low-density
small structures surrounded by lots of vegetation, while residential regular land had larger, more tightly packed
rooftops. As rule of thumb, if the rooftops were spaced out more than two rooftops away from another building,
the area was considered residential sparse. These neighborhoods are more likely to occur near the periphery of the
city and in new settlements. Note that this class was only used in Cap-Haïtien due to the noticeable growth of new
low-density homes in the periphery of the city. In contrast, the growth occurring in Port-au-Prince appeared much
denser, with new, often tightly packed rooftops appearing throughout the city.
The truck/tent class was created to avoid confusion between small rooftops and other small objects. The size
of the rooftops in the residential irregular class were so small (often 10-20 sq. meters) that the algorithm started
misclassifying groups of tents, market stalls, trucks in parking lots, cargo containers and mausoleums as irregular
residential. Therefore, this experimental class was made to represent areas with groups of objects smaller than
homes, but larger than personal cars.
The commercial/industrial class represents areas that have buildings that are considerably larger than a
single-family home. These buildings have long, linear features or distinct geometric curves; they are often
factories, retail buildings, or manufacturing plants, typically surrounded by paved parking lots or major roads.$
$The road layer came from the Centre National de l’Information Géo-Spatiale (CNIGS), 2016 created as part of a rural
accessibility index study.
7Ibid.
8 The road layer came from the Centre National de l'Information Géo-Spatiale (CNIGS), 2016 created as part of a rural
accessibility index study.
100
[page 117]
It should be noted that large apartment buildings are difficult to distinguish from large office buildings and
are thus frequently classified as commercial/industrial. In addition, small businesses, such as ones run out of
homes or in structures the size of single-family homes will be classified as residential. Due to such challenges,
the importance of confirming on the ground the results of the classification and complementing the analysis
with local knowledge cannot be emphasized enough. Lastly, the algorithm was trained to detect roads, but
only the major thoroughfares were successfully identified. As a result, a vector road network from CNIGS was
modified to accurately reflect the vintage of each image.? This vector line was then converted to a raster and
merged into the classified layer so final land cover map could show primary, secondary, and residential roads.
Training sites are areas selected by the analysis as “stereotypical” of the specified land cover class to be
identified. These sites will then be used to “teach” the classifier so that it can identify similar areas throughout the
image. The training sites used in this study were drawn by remote sensing experts who have experience classifying
numerous cities, relying upon the physical characteristics visible in the imagery when drawing the polygons for the
training sites. Examples of training sites used for the different land cover classes used in this work are shown below.
To strengthen the change detection analysis that looks at two images at different points in time, whenever possible
the same training sites were used to classify both images.
To ensure comparability between classes over time, training sites were first drawn over each of the cities earlier
imagery (2005 for Cap-Haïtien and 2006/7 for Port-au-Prince). Then, whenever possible, the training sites were
used to train the second, more recent image. Occasionally, land cover changed and sites needed to be modified, but
95 percent of the training sites remained the same. The model, built by sampling the training sites, also did not alter
between time periods.
Screenshots of training site polygons.
1.Water
2.Vegetation
L ». L 4
LL a sd" 172 Pate MAN 2 a
° Different from the data we used to classify the Haitian system of cities, information about within-city distribution are drawn
from the US Census Demobase (Landscan). This is a high-resolution gridded population map based on a combination of
101
[page 118]
3.Residential Regular
UNS RER: Pyer 14 PL pi LR IE,
NOR (Mie 718 RS
ONE « rTs14 V EPA AE FA à RP. EA
4.Residential Irregular
Rp TE AR 7 À oh à #1]
Ex 7 pe Le" À Se »: { HS A1 se FJ
Parks NC NE REX
“MA ar due Ie DD1 mR: | #0 VE
6.Commercial Industrial
KES <: N à N <: TÆ op. T4 1
EC 0" \ RU + pa LR re
3 PL E VC €
< } f =
7. Truck/Tent
| os 24 Æ L QE 27 4 ” D Ce T%; + 1
ra HAS WA NX EPs$ A
APR US CET MEME CAN ee NN x 27
8.Sparse Residential
El A, €
102
[page 119]
PORT-AU-PRINCE LAND CHANGE AND DENSITY
(A) Port-au-Prince 2016, change in land cover with distance (B) Density compared with African cities
from city center
40
100% Ë
S
TS 80% £ 300 à TT
È à
2 60% 2
S & 200
? $
Ë 40% 5
œ © 100 =
20% S
Êt
o 1 2 3 4 5 15 25
Distance (km) du QCA Distance from CBD (km)
Roads Bare Soil I Vegetation I Tents /trucks © Neil RE
Addis Adaba Dar Es Salaam
M Commercial / Industrial Irregular M Regular . 0
@ Port-au-Prince
Source: Authors’ elaboration using 2016 50cm WorldView2 imagery.
The spatial structure of Port-au-Prince resembles that of comparable African cities, but density
levels are higher. When compared to African cities with similar levels of per capita income, Port-au-
Prince shows remarkably higher density levels. As shown in Figure (B), the pattern of population distri-
bution closely resembles that of Nairobi, the capital and largest city of Kenya, and Addis, in Ethiopia. °
In all three cities, we see a high concentration of population living within just 1 kilometer of the central
business district, followed by a sharp and steady decline of population density as one moves to the
periphery. However, Port-au-Prince is denser: 28,700 inhabitants per sq. km live within 1 km from the
main market, whereas 21,700 inhabitants per sq. km do so in Nairobi.
This pattern of growth likely reflects topographical constraints: Port-au-Prince is flanked by
mountains to the south and coastal areas prone to flooding in the north. As indicated in images (A)
and (B) in Figure 2, growth has been constrained largely within areas that already had some settle-
ments, except for new residential buildings in the northwest and a large area of irregular settlements to
census data and satellite image analysis more precise than WorldPop. It allows for a comparison between Port-au-Prince and
African cities similar to the Haïitian capital in terms of income per capita. Based on Oxford Economics 2012 estimation, GDP
per capita in Port-au-Prince amounted to USD 1,547. In Addis Ababa was estimated to be around USD 727, in Nairobi to USD
2,592, in Kigali to USD 1,380, in Dar es Salaam to USD 2,915.
This calculation is based on population estimates derived from 2015 (UN adjusted) WorldPop data and only includes the area
of Sections Haut du Cap and Petite Anse.
[page 120]
GROWTH IN PORT-AU-PRINCE
(A) Port-au-Prince —- Dec 2006/Jan 2007 (B) Port-au-Prince — Feb 18, 2016
RS: 4 À ls : MEN Land Cover
4 SE > = < sa £ Æ POP. RES S à MN irreguiar Residential
PRET À: me: Le AE 4 me LE, 7e Regular Residential
NH PRRE ns NE PRE EM Commercial / Industrial
#8 Là Ac J LE < ES 234 Bare Soil / Dry Grass
RAR SES FÉES qe à Vegetation
à ma # EF. FE # 4 ré FN Se & QE 1 Ed EM Water
; De ea 5 ART 1 45 fes ug Te Le Trucks / Tents
sé he, FES à 1. F: 3 Le
0 A A 97 DNS 9 dé ag" ROME: Roads
DRE US A
BETA re re re. ET :
RÉ À
0 5 10 Kilometers
Source: Authors’ elaboration using 2006 50cm QuickBird2 imagery and 2016 50cm WorldView2 imagery.
the north. This includes the area known as “Canaan”: a settlement of approximately 200,000 that did
not exist before the earthquake of January 2010. In March of that year, a presidential decree declared
the area to be for “public utility” Thousands of households rushed to occupy and build on the land,
even though the second part of the same decree forbade any construction, subdivision, or transactions
in the area.
In Cap-Haiïtien, residents are also crowded in the central areas of the city. This is depicted visually
by the graph in Figure 3. Cap-Haïtien has a population of over 200,000 people, and its urban footprint
spills over municipal boundaries. The city’s average population density is estimated at around 7,800
people per square kilometer.!! As indicated in Figure 6, residential land is most concentrated in the
center of the city and makes up about 20 percent of the land in between 2-4 km from the city center.
This pattern is strikingly different to other cities of similar sizes in Central and South America, where
residential areas have remained centrally concentrated and account for less than 5 percent of total
land after 3 km from the city center. Cap-Haiïtien is particularly noteworthy for residential settlements
extending beyond 4 km from the city center: the expansion toward the northwest of the city is limited
by typographical constraints, given the presence of tall hills (Morne du Haut du Cap).
: Habitat 2013. “The Relevance of Street Patterns and Public Space in Urban Areas.” UN Habitat Working Paper. UN Habitat.
[page 121]
CAP-HAÏTIEN CHANGE IN LAND COVER WITH DISTANCE FROM
THE CITY CENTER (2015)
100% LS A
= SA
Distance to CBD (km) L Lee LA ds cd ré = MU En
Bare Soil D Vegetation Road DM Commercial/Industrial É % ee “J Ms
M Lrregular DM Sparse M Regular
(] 1 2 Kilometers
Land Cover
Regular Residential M Road
Sparse Residential Vegetation
MN regular Residential Sand / Bare soil
BI Commercial / Industrial Water
Source: Authors’ elaboration using classified layers created using 2015 50cm GeoEyel imagery as input
Satellite imagery does, however, reveal sparse residential housing emerging in other peripheral
areas. The efforts to classify satellite imagery also allow looking at how much land is dedicated to road
infrastructure in each city. À comparison of this indicator is displayed in Figure 4, showing Haitian
cities at the bottom end of the distribution and considerably behind even some African cities. While
in Accra, about 11 percent of land within the city is dedicated to roads, PaP has less than 5 percent of
land dedicated to roads.
[page 122]
Figure 4.
Manhattan I I I I I I I
HareRe Li Li LI LI LI Li
Li Li LI LI LI Li
Barcelona
: Li Li LI LI LI
Paris
Amsterdam : : : : :
Ml L | L | LI LI LI
Athens
Medellin 2 2 2 2
L | L | L 1 L 1
Brussels . . , ,
Helsinki . . , ,
Copenhagen . . , ,
Guadalajara
Singapore 2 2 > >
me CI Li LI
Beijing M M .
St. Petersburg , , , Î
Auckland 3
L | L | L 1
Brazilia . . . l
Chandigam
Li Li LI
Kigali . .
Kolkata . .
Abuja . .
Dakar . .
Addis Ababa
Li Li Ï
Georgetown . . ê
Ouagadougou . . 3
Nairobi . . 6
Accra M
Ouanaminthe ,
Fort-Liberté
Port-au-Prince
Jeremie
Lestere
Mirebelais
Jacqmel
Miragoane B
0% 5% 10% 15% 20% 25% 30% 35% 40%
Percentage of Land Allocated to Roads
Sources: Cities in blue are authors’ calculations from the classified layers. AI other numbers are taken from UN Habitat
2013.1
106
[page 123]
REFERENCES
Christiaensen, L., J. Weerdt, and Y. Todo. 2013. Urbanization and poverty reduction: the role of
rural diversification and secondary towns. Agricultural Economics, 44(4-5), 435-447.
Christiaensen, L., and Y. Todo. 2014. Poverty reduction during the rural-urban transformation-
the role of the missing middle. World Development, 63, 43-58.
Graesser, J., A. Cheriyadat, R.R. Vatsavai, V. Chandola, J. Long, and E. Bright. 2012. Image based
characterization of formal and informal neighborhoods in an urban landscape. IEEE Journal
of Selected Topics in Applied Earth Observations and Remote Sensing, 5(4), 1164-1176.
Antos, S.E., N. Lozano-Gracia, and S.V. Lall. 2016. “The Morphology of African Cities.” World
Bank Policy Research Working Paper, no. 7911.
107
[page 124]
[page 125]
SHAPING LABOR MARKETS:
CONNECTIVITY, JOBS, AND RISKS
Paolo Avner
Guilherme Augusto Zagatti
Nancy Lozano-Gracia
Miguel Gonzalez Canudas
Sarah Elizabeth Antos
and Linus Bengtsson*
[page 126]
+ ES .
F7 - x pen C7” Lx ï ral
Bon = EE œ
= + ab 2 | et ;
= PT
LEUR L'a | k
LI pe nn
Es D + ce | 5 7
RE fe : ER S
= Æ DT — eL & . a 2 — —
here 7 M es M | PL
LS TT Cp sé nn
LE « …
De . PORT-AU-PRINCE, OUEST, CAPITALE
_ -_ PHOTOGRAPHED + PINS!
Re > à LR + A, PUB £”..
ass A ES
[page 127]
CHAPTER 3 - SHAPING LABOR MARKETS:
CONNECTIVITY, JOBS, AND RISKS
CONNECTIVITY IN HAITIAN URBAN AREAS access to jobs, sometimes isolating entire
Motorized transport is expensive with neighborhoods from the rest of the urban
respect to households’ budgets in urban Haiti. economy. Improvements in the connectivity
Thus, a large share of the urban population system are required to increase resilience and
cannot afford to travel by any other means promote economic growth and job creation.
than by foot. These commuters are left with While large investments and policies could
the choice of an exhausting and lengthy trip lead to better coordination of transport and
to the main employment centers within the land use, these are likely out of reach in Haiti
urban area or of settling for a job close to their presently. Instead, incremental improvements
homes, which might not be the best fit. For and investments aimed at better utilizing road
commuters that chose to ride on Tap-Taps on space and orienting future urban develop-
a regular basis, they will have access to a larger ment toward safe and well-connected areas
pool of jobs, but at the cost of large travel could increase speeds on the roads, lower
expenses, which will reduce their available fuel consumption, and improve the resilience
budget for food, clothing, and shelter. In of the network. As will be discussed in detail
both cases, accessibility is poor, leading to in this chapter, such solutions would consti-
fragmented labor markets - where matching tute a first step toward a more dynamic and
will happen at a local scale - and are unlikely integrated labor market capable of spurring
to lead to agglomeration economies that have economic development and job creation.
spurred much of the economic growth in
developed and emerging economies. Cities as matchmakers between people
In parallel, Haïtis vulnerability to natural and jobs
hazards adds supplementary challenges When accessibility is good, cities can
for the urban transportation networks. Any become integrated labor markets that provide
disruption to specific links will have ripple opportunities to residents, allowing them to
effects on the economy in the form of reduced choose jobs from larger pools and leading to
*The team wishes to thank Digicel for granting access to the CDR data. The authors thank Katie L. McWilliams, Benjamin P. Stewart,
and Lauren Nicole Dauphin for providing important help in running the network analysis and the calculation of transport times in
Port-au-Prince and Cap Haïtien. Pierre Xavier Bonneau provided crucial guidance and, together with Malaika Becoulet and Franck
Taillandier, helped the team navigate the issues of urban transport in Haïti. Emilie Perge’s in-depth knowledge of the ECVMAS
survey was key to understand transport expenditures and to the writing of the corresponding sections in this chapter.
LLL
[page 128]
increased welfare (Bertaud 2014). Integrated City management can help provide
labor markets exist when it is possible for an residents with good accessibility levels.
individual to reach a large share ofthe employ- Through efficient planning, interventions
ment opportunities within a city at a reason- aimed at coordinating land use and transport
able cost or within a reasonable timeframe. can reduce the disconnect between residential
Large and integrated labor markets support areas and employment opportunities by short-
improved matching by increasing the number ening travel times. Reductions in transporta-
and diversity of employers and job seekers, tion costs have been found to have positive
which makes the best of their respective impacts on the employment prospects of
skills and aspirations (see Box 1 in Annex 5 the youth in Ethiopia (Franklin 2015) and in
for an academic perspective on accessibility France (Le Gallo, L'Horty, and Petit 2017),
and productivity). Consider, for example, a while land use interventions also carry the
schoolteacher or carpenter in Port-au-Prince potential to increase employment accessi-
looking for a job. They could apply for ten bility (Avner and Lall 2016; Peralta Quirés
positions, and if they can effectively travel to and Mehndiratta 2015). Conversely, inade-
all ten daily, they would be able to choose the quate urban policies can foster disconnection
best one offered in terms of salaries, topics, within urban areas. The massive sprawl and
or desirable location within the urban area. low-density housing development in Mexican
When access is good, firms also benefit from cities was partly the result of the housing
the proximity to product and labor markets policy reform of 2000. In Mexico City low-in-
that the density of cities allows. When opening come households living in the peri-urban
a position, an employer would want to be able areas can spend an additional four hours
to choose from the largest possible pool of commuting per week compared to low-income
candidates to select the one that is the fittest families residing in more central areas (Kim
for the job. This matching is made possible and Zangerling 2016). And nowhere is the
through connectivity: the ability to learn impact of policies on the shape of cities and
about suitable opportunities and travel to residents’ accessibility as visible as in South
them regularly. Conversely, when accessibility Africa, where apartheid policies produced
is limited, the likelihood of finding a good an entirely segregated spatial structure with
match is smaller, since firms/households must Coloureds and Africans living in peripheral
select from a smaller pool of workers/employ- and areas of Cape Town mostly disconnected
ment options. Jobs located outside high-den- from employment opportunities. As a result,
sity economic clusters tend be scarcer, more Africans on average incurrTed commuting
informal, and lower paying. Low accessibility times that were 70 percent higher than for
levels also pressures families to locate closer Whites in 1998 (Rospabe and Selod 2006).
to jobs, which can be a disadvantage given Connectivity and accessibility are
that land and housing are more expensive, necessary - but not sufficient - conditions
forcing families to live in basic conditions, to achieve efficient urban labor markets.
thus fueling the phenomenon of central slums Creating jobs and achieving efficient labor
found in many African cities (Antos, Lozano- markets demand a multi-dimensional
Gracia, and Lall 2016). solution to overcome many obstacles, ranging
112
[page 129]
from the lack of a financial and banking lated activities to the national GDP (THSI 2007)
system to create businesses, low education and the cost structure of various transport
levels, and a costly regulatory framework. services. This study is, however, outdated.
Improving accessibility will not solve these À more recent effort led by the Inter-Amer-
issues, but failing to address urban acces- ican Development Bank (IADB) produced
sibility challenges will impede progress in a report documenting urban transport
terms of productivity and livability. patterns in the metropolitan area of Port-au-
Prince in 2010-2011 (Kopp and Prud’homme
Where disasters are common, matchmaking 2011). Although this report focuses only on
is harder Port-au-Prince, it is rich with information
Haiti’s extremely high exposure to natural and is therefore useful to summarize its main
hazards puts the economy at great risk. As findings here, with the assumption that the
mentioned in Chapter 2, Haiti is one of the documented challenges are likely to apply
countries most exposed to natural hazards in to other major urban areas in Haiti such as
the world. Ninety-three percent of its surface Cap-Haiïtien, albeit to a lesser extent.
and more than 96 percent of its population Motorized transport is dominated by
is at risk of two or more hazards (World Bank Tap-Taps in Port-au-Prince. Tap-Taps are
and ONPES 2014). As much as 56 percent converted pick-ups, often imported from the
of the countrys GDP is linked to areas United States and Canada, which can seat up
exposed to risk from two or more hazards, to fourteen people but often accommodate
and therefore every event, whether hurricane, up to twenty. Alongside Tap-Taps, there are
flood, earthquake, landslide, or drought, minibuses and buses, which can seat between
has economic consequences (World Bank twelve and thirty people and sixty people,
and ONPES 2014). According to the Poverty respectively. Moto-taxis are an increasingly
Assessment completed by the World Bank popular means of transport in Port-au-Prince,
and the Government of Haiti in 2014, vulner- as their small size allows them to partly escape
ability is extensive in the country. One million the high congestion in the metropolitan area
people live slightly above the poverty line and (Ryko 2014). Private cars and two-wheelers
could be pushed below it by a shock. Nearly represented in 2011 a marginal share of
75 percent of households are economically transport demand at 7 percent, the rest being
impacted by at least one shock every year, public (93 percent). By comparison, public
with weather-related disasters having great motorized transport is dominated by Tap-Taps
disruptive potential. (56 percent) and minibuses (24 percent). Buses
add an extra 8 percent while moto-taxis had a
URBAN TRANSPORT IN HAITI IS SLOW 3.7 percent market share in 2011, which is likely
AND UNAFFORDABLE TO MANY to have grown in recent years.
Data on mobility patterns of Haitians living À massive share of people walk in Haiti and
in cities and urban transport systems is scarce. motorized transport uptake is low. The share of
In 2004-2005 the Institut Haïtien de Statistique households with positive spending on any type
et d'Informatique (IHSI) conducted a survey oftransport in 2011-12 is as low as 46 percent at
documenting the contribution of transport-re- the national level, meaning that 54 percent of
113
[page 130]
households did not use any kind of motorized only at the Port-au-Prince metropolitan area,
transport (Cadena and Perge 2017). Looking the same figures show a higher daily/regular
only at “regular transport,” the transportation transport uptake, with the share of house-
that is used for commuting and ordinary trips, holds that never use motorized transport for
the share of households with positive expen- commuting purposes comprising between 66
ditures is even lower at 26.6 percent. In the and 80 percent for the first three quintiles, but
absence of a travel survey that could decipher decreasing to around 49 percent for the richest
trip mode shares, we interpret this figure as a quintile.
proxy for the proportion of people who take Natural disasters, by destroying the
motorized transport in cities on a regular connective infrastructure, can exacerbate the
basis; the remaining 73.4 percent either do not challenges of accessibility to opportunities
travel or walk everywhere. Figure shows that in urban areas. Whereas large disasters such
between the 1st and the 3rd quintiles, the share as earthquakes carry the potential to disrupt
of households that either do not commute or urban areas overall, lower magnitude events
commute by foot could be anywhere between such as floods can nevertheless disrupt local
79 and 92 percent at the national level. Looking economies by destroying transportation
MOTORIZED REGULAR/DAILY TRANSPORT UPTAKE AT THE NATIONAL
AND METROPOLITAN LEVELS ARE LOW
60% sl
50.7%
50%
42.6% 439%
40%
33.6% 324%
30%
24.1%
A 21.2%
20% IEEE .
14.0%
10% x
0%
ist 2nd 3rd 4th sth
National EH Metropolitan
Source: Authors’ elaboration using 2006 50cm QuickBird2 imagery and 2016 50cm WorldView2 imagery.
[page 131]
AMONG THOSE THAT USE REGULAR MOTORIZED TRANSPORT,
THE MAJORITY DOES SO DAILY
2000 17% EE
8.5%
90% el 11.2% ____......À
80% 21.0% | 92%
70%
74
60% Le” 137%
50%
40%
30%
20%
10%
0%
National Metropolitan
M À few times a year Once or twice a month Every week Afewtimesaweek I Every day
Source: From Cadena and Perge (2017) using ECVMAS (2012)
Note: Frequency of usage for regular transport users.
networks, making commuting and exchanges present chapter will help identify key corridors
extremely difficult. To increase the resilience that require robustness or redundancy in order
of urban areas it is essential to understand the to ensure access to opportunities in the event
vulnerability of the transportation network to of a disaster.
low-magnitude yet disruptive natural disasters. A little less than one-third of households in
One way of measuring the vulnerability of the the metropolitan area use motorized transport
transport network is to calculate the accessi- every day while 57 percent never use it. Figure
bility consequence of the destruction of specific 2 focuses on households that declare positive
links of the network. Where Chapter 2 investi- expenditures on regular transport and inves-
gated the consequences of lack of planning or tigates the frequency of this transport service
implementation of planning documents on the use. In the metropolitan area of Port-au-Prince
increased vulnerability to natural hazards, the the choice to resort to regular transport is
[page 132]
binary: either households use it every day or at diture was approximately HTG 9,700 or USD
least a few times a week (83 percent of users or 230. So, if a Tap-Tap trip was repeated twice a
36 percent of total households) or they do not day, five days a week, transport expenditures
use it at all. Irregular use of transport is low would represent anything between 25 and
(16 percent of users or 7 percent of total house- 73 percent of per capita expenditures in the
holds). Also, except for the first quintile, which lowest quintile. This would leave very little for
has a lower share of daily regular transport fundamental expenses such as food, housing,
users, usage frequency is quite steady across and clothes.
the income distribution with 72-78 percent of As a consequence of unaffordability,
households using regular transport every day transport budget shares are low. Instead,
versus 61 percent for the first quintile. At the households prioritize food and housing. The
national level, infrequent users of transport are ECVMAS (IHSI 2012) survey conducted in
more widespread. This appears to be mainly 2012 demonstrates that the poor spend very
due to the inclusion of residents of rural areas, little on average on regular/daily transport
which have lower needs for regular transport. even in proportion to their total expenditure,
Unaffordability of motorized transport around HTG 1,139 a year per household or
appears to be the main reason for high walking a little above USD 27 (2012 exchange rates).
shares. The Ministry of Social Affairs (MAST) Based on a Tap-Tap trip costing on average
oversees prices for public transportation USD 0.35, this budget could afford less than
and petroleum products. Tap-Tap fares are forty round trips a year. Non-poor households
therefore regulated to increase the affordability spend on average seven times more than poor
of motorized transport. The rule for defining households on regular/daily transport. This
these fares is unclear, however, and so is the is again indicative that motorized transport
degree to which fare regulation is enforced usage is highly dependent on income levels.
in practice. Despite this fare regulation, poor Given the unaffordability of motorized
inhabitants of Port-au-Prince cannot afford transport for many, transport (and regular
to travel using Tap-Taps on a daily basis. transport in particular) expenditure shares
Kopp and Prud’homme (2011) estimated the are low. The left pane of Figure 3 shows that
unit cost of riding Tap-Taps - the cheapest these oscillate between 1.5 and 2.1 percent of
motorized transport mode - to be around household expenditures for the three lowest
USD 0.07 per kilometer, which would approx- quintiles in the metropolitan area and are
imately amount to USD 0.35 for a 5km trip. lower in other geographic areas. The richest
More conservative anecdotal evidence suggests quintile spent 2.5 times more than the lowest
that Tap-Tap fares are lower, around HTG quintile relative to their total expenditures.
5 or USD 0.12 with 2012 exchange rate.! In These low figures can largely be explained by
parallel, the lowest quintile per capita expen- low usage of regular transport. When focusing
: À study investigating Tap-Tap fares is currently ongoing. Initial results report an average fare of HTG 11-12, which would
correspond to USD 0.17-0.19 using June 2, 2016 exchange rates. These prices cannot be easily compared to 2012 expenditures,
however. There is also a large variation in Tap-Tap fares depending on the circuit as can be seen from official tariffs: http://
www.haitilibre.com/article-13327-haiti-avis-nouveaux-tarifs-du-transport-en-commun-zone-metropolitaine.html. These
official tariffs seem generally to be consistent with Tap-Tap fares, according to the ongoing survey.
lé
[page 133]
THE SHARES OF EXPENDITURE ON REGULAR/DAILY TRANSPORT OUT
OF TOTAL EXPENDITURE BY INCOME QUINTILE AND GEOGRAPHIC AREA
FOR ALL HOUSEHOLDS (LEFT) AND FOR REGULAR/DAILY TRANSPORT
USERS (RIGHT) ARE LOW
20% 200
CE 8% ETS SES" —_—_
60 6%
1,8% 2.1% 27%
2% — - 2% =
0% 0%
ist 2nd 3th 4th sth ist 2nd 3th 4th sth
Rural Urban DM Metropolitan Rural Urban DS Metropolitan
Source: Based on Cadena and Perge (2017) using ECVMAS (2012)
specifically on regular transport users (Figure diesel (World Bank 2015). On average, the share
3, right pane), the picture is very different. of subsidies as a proportion of fuel costs was as
Expenditure shares are between 6.4 and 7.8 high as 29 percent when considering volumes
percent of total expenditures in the metro- of diesel and gasoline. These subsidies had
politan area, with the lowest income quintile limited fiscal impact in 2010 (0.34 percent of
having the highest expenditure share. While GDP), but as the price of oil products increased
these numbers are not high in absolute terms and the Haïitian Gourde depreciated, they grew
when compared to other countries (around 15 to represent as much as 2 percent of GDP in
percent in Argentina and France), they are for 2014. By comparison, fuel subsidies represent
a low-income country such as Haiti. To put on average 0.9 percent of GDP in the rest of
these results into perspective, expenditures the Caribbean countries and as little as 0.1
on rice represent up to 7 percent of household percent in the Dominican Republic (World
expenditures for the poorest income quintiles Bank 2015). The high share of GDP committed
(Q1 and Q2). to fuel subsidies is crowding out important
Fuel prices have historically been subsi- public spending, such as on health or social
dized, but the government of Haiti is in the protection, which amounted in 2015 to only 0.8
process of eliminating the subsidies through percent and o.3 percent of GDEP, respectively.
an automatic adjustment of fuel pump prices. Finally, the fuel subsidies are highly regressive
Fuel subsidies in 2014 represented 44 percent in Haïti with approximately 93 percent of the
of the fuel price for gasoline and 18 percent for subsidies benefitting the richest 20 percent of
[page 134]
the population, who are more likely to own cars ties. Potentially, it would also indirectly harm
and motorbikes (World Bank 2015). In light of Tap-Tap operators through lower occupation
these figures, and the unsustainable nature rates of their vehicles.
of the subsidies, the government of Haiti is Due to this situation, combined with low
looking to implement an automatic adjust- affordability of motorized transport, it is
ment mechanism of fuel prices, which would critical to devise compensation mechanisms
adjust according to international fuel prices that could ensure that the subsidy removal
and exchange rate movements. This automatic does not translate into higher fares or loss of
adjustment mechanism has been planned by a activity for Tap-Tap operators. Compensatory
1995 Legislative Decree, but was only activated mechanisms are needed to maintain or even
for the first time in 2003 and has been removed increase Tap-Tap ridership despite higher fuel
and reactivated on multiple occasions between prices. Many avenues to do so are possible.
2008 and 2014. Firstly, increasing speeds on the network,
The removal of the fuel subsidies and the through interventions on the road network
implementation of an automatic adjustment and by rationalizing Tap-Tap routes, so as
mechanism is likely to spur tension and to allow Tap-Tap drivers to complete more
worsen the unaffordability of public transport round trips in a given time. This option would
in the absence of compensatory mecha- increase the revenues and margins of Tap-Tap
nisms. Because Tap-Tap fares are regulated, operators and could lead to lower fares, and is
increased fuel costs would have to be absorbed the most promising. Another approach would
by Tap-Tap operators as a non-marginal loss. be making Tap-Tap vehicles, often operated
Preliminary results from an ongoing survey for more than 25 years (Kopp and Prud’homme
on the cost structure of Tap-Taps indeed 2011), more fuel efficient to lower the volume of
indicate that fuels represent 34 percent of fuel. Public interventions to scrap old, fuel-in-
cost spending, while previous studies place efficient, informal minibuses and subsidize
these as high as 49 percent (World Bank the purchase of more efficient vehicles were
2015). Previous attempts to implement the implemented in Senegal and the Dominican
automatic adjustment scheme failed in part Republic and could provide a blueprint
because of opposition from students, trans- for doing so in Haiti (as discussed further
porter unions, and popular community below). This option would require more in
organizations taking to the streets. The last depth analysis to uncover whether a suitable
attempt to reinstate the automatic adjust- model can be identified and negotiated with
ment mechanism in August 2016, led to a the operators. An ongoing technical assis-
20 percent increase in fuel prices and was tance of the World Bank is exploring different
suspended immediately after transporter mechanisms to offset fuel cost increases and
unions mobilized. Conversely, if the public the results will inform whether scrapping old
transport fare could increase to compensate Tap-Tap vehicles is a viable option.
Tap-Tap operators for the fuel price increase, Motorized travel is slow and lengthy
this would exacerbate the unaffordability in Port-au-Prince, so even those who can
of public transport and further exclude the afford it will incur high time costs. Kopp
poor from accessing economic opportuni- and Prud’homme (2011) used Inter-Amer-
118
[page 135]
BOX 1 - FUEL PRICES POLICIES AND THEIR IMPLICATION ON CONNECTIVITY AND
HOUSEHOLDS' HABITS
Since 2003, Haiti has subsidized fuel prices at high socio-economic and environmental costs. With subsidies
representing a high share of total revenues (15 percent), Haiti has underspent in key sectors such as health (0.8
percent of GDP) and social protection (0.3 percent). Subsidies are also regressive since poor households spend
very little on fuel products (0.11 percent of the average household’s budget). Artificially low fuel prices propped
up the demand in fuel products nonetheless, which increased levels of outdoor pollution and lowered the incen-
tives for industries to invest in more efficient technologies. In 2014, the Haitian government began to gradually
phase out fuel subsidies; the consequences of this policy on the Haitians’ welfare is, however, ambiguous. The
complete elimination of subsidies is not expected to have large direct effects on the real consumption of house-
holds in the bottom 40 percent of the welfare distribution given that they spend less than 0.06 percent of their
annual budget in fuel-related products, including cars, motorbikes, and generators for electricity. Eliminating
subsidies would result in a 29 percent increase in the cost of fuel, but the real consumption of the bottom 40
percent would decrease by only 0.02 percent. However, indirect effects through transport and food expenses
could be larger - especially for the poor and vulnerable in urban areas - for three main reasons. First, the vulner-
able and the poor represent 40 and 32 percent, respectively, of transport services customers, including Tap-Taps
and public buses. Vulnerable households, in particular, spend around 4 percent of their total budget on daily
and school transportation. An increase in transport tariffs due to higher fuel prices would negatively affect
poor households’ income. Second, increasing transportation costs could impact the share of food expenses in
households’ budgets (60 percent on average). Urban households are particularly concerned, since they usually
buy fresh products transported by traders from rural areas. At the national level, a 30 percent increase in fuel
prices would trigger a 1 percent increase in food prices. Third, most rural households and a portion of urban
households (26 percent) rely on kerosene for cooking and lighting their homes, which may become costlier with
higher fuel prices. Users will react to higher transportation fares by walking longer to reduce their expenditures
on transport; they will then be more exposed to pollutants from vehicle fumes, which may lead to fatigue and
underperformance at school or work. As Tap-Tap owners would try to maximize their profits by limiting their
circuits and overcrowding their vehicles, the quality of transport services would decrease and will ultimately
become a less attractive option for customers in the long run. Increased food prices may cause reductions in
poor people’s daily food intake. In urban areas, where cheaper food is more easily available, households would
consume lower quality meals, with consequences for their health. Finally, an increase in the price of kerosene
would push households to reduce the overall hours of house lighting and to shift core activities into daylight
times. This may have implications for opening hours for business, night schools, and study time at home.
The reduction in kerosene for cooking may put pressure on the environment as consumers will rely on other
more polluting types of fuel - e.g. charcoal. All in all, a reduction in fuel subsidies could increase poverty by
1.1 percentage point, with vulnerable households suffering the most. These results suggest that considering
secondary effects is essential to understand the full impact of reductions in fuel subsidies and that special
measures may be needed to minimize the impact on the poorest of the poor.
Source: "Haiti: Steering towards effective fuel subsidy reform” (Perge et al. 2017), based on ECVMAS 2012 data and Haiti
Public Expenditure Review (World Bank, 2015a).
119
[page 136]
ican Development Bank vehicles’ travel logs space is occupied by parked vehicles. Taken
to assess the speeds of various vehicles in together, nearly half of the devoted road is no
Port-au-Prince in 2010. In general, speeds longer available for traveling vehicles, leading
were as low as 10.9km/hour on average. The to considerable loss of speed and risking
speed of public transport is even lower because pedestrians’ well-being by forcing them off the
Tap-Taps stop regularly to pick up and drop off sidewalk. The frequent stops of Tap-Taps and
passengers. Tap-Tap users on average reported other minibuses with no dedicated space also
an on-board travel time of 44 minutes per trip contributes to congestion. Finally, poor road
with an average speed and distance of 8km/ maintenance forces vehicles to brake regularly
hour and 5.9 km. If travel time and distance to avoid potholes or to absorb the shock.
to the Tap-Tap route are included, as well
as waiting time, the average trip duration STRUCTURE OF THE URBAN AREAS OF
becomes 76 minutes and distance about 7.2km. PORT-AU-PRINCE AND CAP-HAÏTIEN:
Assuming a round-trip a day, that would mean WHERE ARE THE PEOPLE? WHERE ARE
that a Tap-Tap user would on average travel for THE OPPORTUNITIES?
152 minutes, i.e. above 2.5 hours.? Cars, taxis, Traditional data needed to characterize
moto-taxis, and motos travel at slightly higher the level of accessibility to opportunities in
speeds, 11km/hour at least, so a similar trip to Haitian cities is unavailable or outdated.
that of a Tap-Tap user would be 32 minutes In order to understand the degree of spatial
instead of 44 minutes. mismatch between economic opportunities
Slow speeds of motorized transport are and housing and assess the level of labor
caused by a combination of lack of road market fragmentation, it is important to
infrastructure, poor road maintenance, but document where economic opportunities are
above all by suboptimal use of street space. in relation to residential areas. Such a task
There are some narrow streets in Port-au- is usually tackled by using a combination of
Prince, but many others are wide enough to up-to-date population and firm censuses.
accommodate two-way traffic, so that the slow Population censuses would provide a highly
speeds described above can only be partially disaggregated image of where residential areas
explained by lack of road infrastructure. The are, while the economic census information
other factors leading to congestion, Kopp and would provide insights about the location of
Prud’homme argue, are the competing uses of jobs. Similarly, understanding travel patterns,
road and street space and poor road mainte- including commuting within the urban areas
nance. In particular, sidewalks are used by of Port-au-Prince and Cap-Haïtien, usually
merchants for commercial purposes leaving implies the existence of personal travel
no other option to pedestrians than to walk in surveys. None of these exist in Port-au-Prince
the traffic lane. In parallel, a large share of road and Cap-Haïtien.? The analysis is focused on
2This is a conservative estimation, as we disregard any supplementary trips that Tap-Tap users might undertake during the day.
3 The last population census dates back to 2003 (TIHSI 2003) and does not capture the impacts of the 2010 earthquake likely to
have substantially impacted households’ locations. Similarly, although a firm census was conducted in 2012 (“Répertoire des
Entreprises”: http://www.haitibusiness.com/), the coordinates of the firms are not directly available. Finally, to the best of our
knowledge, no travel surveys exist for major urban areas in Haiti.
120
[page 137]
RESIDENTIAL POPULATION IN PORT-AU-PRINCE, À STAR-SHAPED CITY
WITH À DOMINANT CENTER
Population Distribution - Port-au-Prince
Home Locations - < 50,000
ve
F4 - s 42.857 —
r, E
d + s Sat
! f s
z -< 28.572 5
Ë
-< 21429 >
- < 14,286 ©
- < 7,143
Source: Authors’ elaboration using Digicel data.
Port-au-Prince and Cap-Haïtien because they used mobile operator data for develop-
are the two largest urban areas of Haiti and ment of applications (Tatem et al. 2009)
play major economic and cultural roles. to predict population displacement after
Big data innovations involving mobile the 2010 earthquake (Lu, Bengtsson, and
phone data were used to fill this knowledge Holme 2012), as well the spread of cholera
gap and contribute to a better understanding in its aftermath (Bengtsson et al. 2015), this
of commuting challenges in Haitian cities. is the first time CDR data is used to identify
For this report, a sample of de-identified job location in Haitian cities. Several billion
Call Detail Records (CDR) collected over voice call event records were included in
3-month period from March 1 to May 30, the dataset. CDRS contain the geolocation
2016 was analyzed for this work.4 This work information of the cell tower to which the
was possible thanks to the partnership built subscriber is connected at the start of a voice
between Flowminder and Digicel, the largest call. This information can be used to measure
mobile network operator in Haiti with over the collective mobility patterns of popula-
two-thirds market share in mobile phone tions over time, as well as the local popula-
subscriptions in the country (CONATEL tion densities at various times of day (see
2016). While Flowminder had previously Box 2 for a summary of the methodology).
4Data analysis was carried out by the Flowminder team, with whom the authorship of this chapter is shared.
[page 138]
BOX 2 - IDENTIFYING JOBS AND RESIDENTIAL LOCATIONS USING MOBILE PHONES
The identification of jobs and residential locations follows a two-step approach: identification of “meaningful
places” and categorization of such places. This approach, and the complete analysis of the CDR, was devised and
carried out by Flowminder, who are the co-authors of this chapter.
First, it is necessary to ascertain the locations that structure callers’ days and nights. Cell towers are ranked by
the number of days a subscriber was connected toit. Since a subscriber’s location is not static, and because cell tower
coverage can overlap, towers are clustered together based on their call-days and the proximity between them. À
weighted average of cell tower location provides the best estimation for a subscriber’s “meaningful place.” Call-days
are aggregated across clusters, and only those with a minimum of activity are considered for further analysis.
Figures.
€; LEA DES DE QE SL ITAN à d =
RATE SR Te TER TE NE MES
4 Eye SES ae TS SAS M. dre
(ER CARE 1 er CE 0) RS 22 1744
à PRE m6. RU ARE" fr LATE
Towers and number of days user connected to 1. Algorithm selects tower with highest number
each tower (call-days) of call-days as the first centroid
ORNE à Et NE 4 FR | DT 4 et. LME 7 PT 2
7 A ËNS "TA € - AA a Raul NN ef, ee AN
BR dt Eure 0
PAT LORS AB Te RONA an
2. Algorithm scans the space for the next tower within 3. Algorithm finds new centroiïds and continues
the threshold (1km) and re-calculates the centroid table scan
122
[page 139]
Me :, 42 D id. : Te ED ad
>> DER Een SR MALTE EL E
BE De AR nd EE TT |
Re ON Re MAS nr" Eur Len,
PFÉE) ip à PSS D, Wix Poe VE var. le, ES / UE)
=: P TRE | ni É Seb LES
4. Algorithm finishes scan and finds all centroids 5. Algorithm selects only the centroids with
call-days above nine as the set of meaningful places
Source: Authors’ elaboration.
Second, “meaningful places” are labeled as “home” or “job” locations based on their call pattern. This is done with
the assumption that callers are likely to spend most of their early morning, evening, and night time at “home,” and
conversely, most of their day-time at “work.” Another important difference is people’s behavior on weekends where
they are less likely to work. In order to be able to identify “home” or “job” locations, Flowminder built a scoring system
that attributes different scores to calls made during different times of day and days of week. On the first row, a score
of -1 represents an evening time call, while a score of 1 represents a call passed during work hours. On the second row,
a score of 1 represents a called passed during a work weekday and a score of -1 represents a weekend call. The overall
result approximates both the location and importance of areas for jobs and residences.
This novel methodology necessarily relies on a certain number of assumptions. These are discussed in detail in a
background technical report that accompanies the Haiti Urbanization Review. Let us, however, list two main caveats
in the analysis: the resolution for identifying meaningful places and the labeling of these places as home or job.
LABELING MEANINGFUL LOCATIONS AS "HOME" OR "JOB" ACCORDING
TO A SCORING CRITERIA
0:00 7:00 8:00 17:00 19:00 24:00
Mon Fri Sat Sun
Source: Authors’ elaboration.
[page 140]
The identification of clusters is dependent on the distance buffer employed to cluster close call locations
together. Low distance buffers would lead to numerous clusters, each with low call-days, presenting a picture
without much structure. At the other end, high distance buffers would lead to a loss of information, as short trips
would not be picked up. The distance buffer retained for this study aims to be a compromise: identifying the main
structure of meaningful places by limiting the number of clusters, yet still capturing the most important travel
patterns. It is, however, possible that the study fails to capture the movement of people who work very close to or
from their home. Second, the labeling of locations as “job” or “home” relies on the assumption that people will
tend to work during daytime. The study will, therefore, miss people with unusual work patterns such as night or
weekend workers. While all necessary methodological precautions have been taken to limit these cases, in partic-
ular by carrying out in-depth sensitivity analyses of the results to the variation of these criteria, this study remains
an approximation and could usefully be complemented by a firm and travel survey.
Port-au-Prince - a star-shaped city with a Carrefour. The east of Carrefour is the most
dominant city center populated part of the neighborhood with
Port-au-Prince has a dominant center population densities slightly lower than the
with three subcenters. There are 3.5 million center of Pétionville. To the northeast of the
people living in Port-au-Princes, and Figure National Palace, population is concentrated
4 shows their residential distribution across around Delmas. Past the airport, high relative
the metropolitan area (identified from densities are observed in Croix-des-Bouquets
evening calls, see Box 2). The population of to the east and along Route Nationale 1 until
Port-au-Prince is scattered in a three-pointed the intersection with Route Nationale 3.
star-shape with its center at the National Around this intersection, one finds Canaan
Palace and the edges reaching Carrefour with around 10,000 to 15,000 people/km2 in
to the west, Pétionville to the southeast, its densest part. This is one ofthe most recent
and Canaan and Croix-des-Bouquets in the additions to Port-au-Prince, formed from
northeast. The center of Port-au-Prince sees temporary camps set up post-earthquake.
the highest population densities, reaching up The city center of Port-au-Prince attracts
to 60,000 people/km2. The density around workers® traveling beyond their home cluster
the center, which includes neighborhoods (1km). À clearer understanding of the main
such as Portail Leogane, Turgeau, and Fort day and night destinations can be gleaned
National, can be above or around 50,000 from Figure 7, which focuses exclusively
people/km2. Pétionville is the second most on the relative distribution of commuters
populated area in Port-au-Prince, reaching at different times of the day. It shows the
population densities of up to 50,000 people/ percentage of commuters with respect to
km2 in its center. To the west of the National the total local population during daytime
Palace high population density is observed (left) and nighttime (right). Unsurprisingly,
along Route Nationale 2, which leads to downtown Port-au-Prince appears as a prime
SWe are looking at a rectangular surface given by a set of coordinates, so when we speak of the metropolitan region, it might
include a larger area than the administrative boundaries.
6Commuters in this study are defined as people that have distinct home and work clusters, which means that work is situated at a
distance greater than the 1km threshold used as a buffer to limit the number of meaningful call locations in the sample of callers.
124
[page 141]
COMMUTERS DURING DAYTIME FOR WORK-RELATED ACTIVITIES
(LEFT) AND DURING THE EVENING (RIGHT)
Commuters as Percentage of Population
Work Locations Port-au-Prince Home Locations
Fa ee - 75.00%
/ » 1 - 64.29% +
| £
SR VE L 53.57% &
7 £
- 42.86% ©
L Ta Es
- 32.14% FA
“ E
21.43% ©
- 10.71%
Source: Authors’ elaboration using Digicel data.
CUMULATIVE DISTRIBUTION OF POPULATION AS À FUNCTION OF
DISTANCE TO CITY CENTER IN PORT-AU-PRINCE FOR VARIOUS TIMES OF
THE DAY (DAYTIME/EVENING) AND FOR VARIOUS CATEGORIES OF
POPULATION (COMMUTERS/NON-COMMUTERS)
Cumulative Population Distibution
From City Center - Port-au-Prince
' i '
100.00% = s
EE À E
80.00% - 4 M Z 1à
60.00% — | 1 9 [
| i '
l / Il
40.00%-! /y
l #i Evening Time (All)
1 /# à — Daytime (Commuters)
20.00% - if : — Non-Commuters P
Fu — Evening Time (Commuters)
J l Daytime (All)
0.00% 1 i î
0 5 10 15 20 25 30 35
distance from city center (km)
Source: Author's own elaboration using DIGICEL data.
[page 142]
attractor during daytime with commuters shown in Figure 9. The highest evening
to the downtown area representing up population density can be found around La
to 72 percent of the local population. In Fossette, a popular low- to middle-income
the evening, the trend is reversed when residential neighborhood to the west of the
commuters to downtown represent only Mapou River and close to a bridge linking
40 percent of the local population. In the both sides of town. Densities in these regions
residential areas of Carrefour and Canaan, can reach about 40,000 people/km2. On the
we see an opposite trend, with low shares of other side of the bay, densities are highest
commuters going there during the day, but around Petite Anse where they oscillate
many returning in the evening after work. around 20,000 people/km2. Population
Another interesting finding from Figure 7 densities decrease as one travels south along
is that we see numerous commuters repre- the Mapou River. Cap-Haïtien is not as big
senting large shares of local population as Port-au-Prince, and population density is
alongside Route Nationale 1 and 8 leading, high only within a narrow 2km strip west of
respectively, to Canaan and Croix-des- the Mapou River and 6km from the mouth of
Bouquets, indicating that these might host the river until Haut-du-Cap. Outside of this
commercial activities during daytime. region, density drops dramatically, reaching
The overall picture is one of concentra- 500 people/km2. Outside of Cap-Haïtien,
tion toward the city center during daytime population is relatively higher along Route
and, inversely, one of diffusion toward the Nationale 1 from Vaudreuil to Moustique to
outskirts during the evening. Figure 8 shows the southwest, in Quartier Morin, Limonade,
that total population within 5skm of the and Trou-du-Nord to the southeast, and in
city center is about 5 percent higher during Milot to the south. Arguably, most of those
daytime than in the evening. If the focus is regions are not part of the metropolitan
exclusively on commuters, then the picture area of Cap-Haïtien. Population density
is even more striking, with 46 percent of in those areas fluctuates between 500 and
commuters within 5km of the city center 1,000 people/km2 and is particularly higher
during daytime versus less than 37 percent in in Vaudreuil and Trou-du-Nord. Outside of
the evening. those satellite regions, density drops dramat-
ically, reaching below 500 people/km2.
Cap-Haîtien - the center has it all The business district in the center of
Population in Cap-Haïtien is mainly Cap-Haïtien strongly dominates any other
concentrated in a strip along the Mapou daytime destination. During the day,
River. Cap-Haïtien hosts approximatively commuters can represent nearly 70 percent
500,000 people.7 The vast majority of people of the local population in the city center of
live closer to the center of town on the west Cap-Haïtien (Figure 10). This figure drops to
side of the bay and Mapou River and along just a quarter of the total population during
the south bay, east of the Mapou River as the evening, meaning that most people in
7 As in Port-au-Prince, we are looking at a rectangular surface given by a set of coordinates and thus when we speak of the
metropolitan region it might include a larger area than the administrative boundaries.
126
[page 143]
RESIDENTIAL POPULATION DISTRIBUTION IN CAP-HAÏTIEN, A
DOMINANT CENTER
Population Distribution - Cap-Haïtien
- < 45,000
Home Locations
n *
ù . - < 38,572 _
c ù ei
. | er
Y
32,143 ©
Fr & , a.
[es
[e]
ZX - & 25,714 =
[er
[e]
ae
- + 19,286 ».
FE
n
[es
[9
- < 12,858 ©
- < 6,429
Source: Authors’ elaboration using Digicel data.
the city center are there for work or other Cap-Haïtien is a small and very concen-
purposes during the day and at night return trated urban area with a highly dominant
to their homes, located outside the city center. Figure 11 shows that close to 60 percent
center. The other densely populated area of of its population is concentrated within 5km
Cap-Haïtien, Petite Anse, sees an opposite of the city center. The attraction exerted by
trend with incoming commuters in the the city center is powerfully illustrated by
morning representing 30 percent of the local the fact that during the day 40 percent of all
daytime population, but outgoing commuters commuters can be found within 1km of the
being close to 40 percent. city center and nearly 80 percent within skm.
[page 144]
COMMUTERS DURING DAYTIME FOR WORK-RELATED ACTIVITIES (LEFT)
AND DURING THE EVENING (RIGHT)
Commuters as Percentage of Population
Ë Work Locations Cap-Haïtien : Home fpcations
q k q \ 75.00%
: ; il ‘ 5429% —
= - 53.57% ë
L 42.86% E
32.14% 8
21.43% $
- 10.71%
Source: Authors’ elaboration using Digicel data.
CUMULATIVE DISTRIBUTION OF POPULATION AS A FUNCTION OF
DISTANCE TO CITY CENTER IN PORT-AU-PRINCE FOR VARIOUS TIMES
OF THE DAY (DAYTIME/EVENING) AND FOR VARIOUS CATEGORIES OF
POPULATION (COMMUTERS/NON-COMMUTERS)
Cumulative Population Distibution
From City Center - Cap-Haiïtien
! } 1
100.00% - L , =
(l L 7 : 1
IE VE F 1£
80.00% — j ja Z 14
60.00% — | | Ï
Î ( [
40.00% °
l Evening Time (All) (
\ ÿ 1 — Daytime (Commuters) (l
20.00% }1ff 1 — Non-Commuters 0
l, | — Evening Time (Commuters) |
/ | Daytime (All) {
0.00% +! L '
0 5 10 15 20 25 30
distance from city center (km)
Source: Author's own elaboration using DIGICEL data.
[page 145]
FRAGMENTED LABOR MARKETS - FEW commutes are not negative per se - actually,
COMMUTERS NOT TRAVELLING FAR they have many benefits such as low fuel
Only a small share of people travel to consumption - if they correspond to self-selec-
work. Only 42 percent and 40 percent of the tion processes whereby people settle near the
population are considered to be commuters job they want, they probably reflect the diffi-
in Port-au-Prince and Cap-Haïtien, respec- culty and unaffordability of travelling. In this
tively, meaning that they travel beyond their sense, generalized short commutes are indic-
home cluster (1km radius). The remaining 58 ative of local, rather than integrated, labor
percent and 60 percent either work from home markets in the two urban areas. Fragmented
or in its immediate vicinity or do not work.f labor markets are unlikely to act as match-
Ideally, this figure would be compared to the makers, decreasing the probability of effec-
distribution of population in Port-au-Prince tively pairing employers and employees.
and Cap-Haïtien by age group. In the absence Central residents tend to commute less
of this information, we can compare to the than people living farther from the city center.
average at the country level. Given that 64 Às numerous opportunities are available very
percent ofthe Haitian population is of working locally, there is less of an incentive to travel
age (Singh and Barton-Dock 2015), commuters far from home. Commuters that live the
in the two urban areas represent a maximum°? farthest from the city center (beyond 5km)
of two-thirds of the active population. in Cap-Haïtien and Port-au-Prince have the
The distances travelled by commuters in longest commutes, as they are more isolated
Port-au-Prince and Cap-Haïtien are short, from economic opportunities and have to
which is indicative of local matching. In incur longer trips to reach them. However,
Port-au-Prince, it is estimated that the median the increase in the median distance travelled
trip is 1.1km and 3.1km if only commuters are remains limited to 1.5km and 2.5 km compared
considered. In Cap-Haïtien, the corresponding to the most central locations in Port-au-Prince
statistics are slightly higher at 1.6km and and Cap-Haïtien, respectively. This pattern
3.3km, respectively (Table 1). In both urban is again indicates fragmented labor markets;
areas, these figures are low. For example, even although job densities in the vicinity are much
focusing on commuters only, these median lower, travel distances do not increase in
trips represent less than an hour of walking. commensurate proportions.
Consequently, the access to a large array of À non-negligible share ofcommuters travels
economic opportunities is low (Tables 2 and long distances. Figure 12 shows the distribu-
3). By comparison, commuter trips in Buenos tion of distances travelled by commuters that
Aires, Argentina are between 7.5km and 10km, live (left column) and work (right column)
depending on the gender of the commuter in each distance from the city center buffer
and the existence of children (Peralta Quirés, in Port-au-Prince. What is striking is that
Mehndiratta, and Ochoa 2014). While short although there are high concentrations
8 Or have other very local regular activities such as attending school, for example.
°1t is possible that part of the people identified as commuters are, in fact, going to school rather than to work or a center of
opportunity. This would bring the share of commuters down further.
129
[page 146]
Table 1. TRAVEL BEHAVIORS IN PORT-AU-PRINCE AND CAP-HAÏTIEN: FEW
COMMUTERS NOT TRAVELLING FAR
PORT-AU-PRINCE CAP-HAÏTIEN
Total Population 3.5 million 0.508 million
ALL COMMUTERS ALL COMMUTERS
Mean Trip 2.5 km 4.5 km 2.8 km 4.7 km
Median Trip 1.1 km 3.1tkm 1.6 km 3.3 km
NON-COMMUTERS COMMUTERS NON-COMMUTERS COMMUTERS
As percentage 58.14% 41.86% 60.51% 39.49%
oftotal
Live less than 1km 413% 2.86% 12.02% 6.13%
from the center
Mean Trip — 3.37 km oo 3.73 km
Median Trip — 2.11 km oo 2.52 km
Live less thanikm 413% 31.67% 46.87% 56.81%
from the center
Mean Trip — 3.29 km oo 3.09 km
Median Trip = 2.52 km oo 2.55 km
Live less thanikm 61.67% 65.27% 40.94% 36.98%
from the center
Mean Trip — 5.12 km oo 7.24 km
Median Trip — 3.66 km oo 5.84 km
Source: Author's own elaboration using DIGICEL data.
130
[page 147]
ACCESSIBILITY TO OPPORTUNITIES IN PORT-AU-PRINCE FOR
VARIOUS TRAVEL TIME THRESHOLDS IN PORT-AU-PRINCE Table 2.
SHARE ACCESSIBLE DEPENDING ON TRANSPORT MODE USED
CARS TAP-TAP + WALKING WALKING ONLY
<30min 24% 7% 3%
<45 min 43% 16% 7%
<60min 61% 27% 12%
Source: Authors’ elaboration using Digicel data.
of commuters that travel short distances, can access respectively 24, 43, and 61 percent
there are also fat tails indicating that some of total opportunities® in the urban area
commuters incur long trips, up to 20km. within a 30, 45, and 60 minutes in congested
Finally, Figure 12 also reaffirms that the city conditions. For Tap-Tap users the situation
center is a main attractor, as there are approx- is drastically different, as on average they
imately 4.5 commuters travelling to the city can only access 7, 16, and 27 percent within
center for each commuter that leaves the city a 30, 45, and 60 minutes. These “accessi-
center for work purposes. We find similar bility to opportunities” figures for collective
patterns in Cap-Haïtien (Figure 13), with an transport are low and likely optimistic, as
even larger share of people commuting long they do not account for waiting times." They
distances to the city center, particularly from are in line with figures for Nairobi (Avner and
Trou-du-Nord. Lall 2016), which is notoriously congested,
having ranked as one of the cities where the
Low accessibility limits the potential for journey to work is the lengthiest (IBM 2011).
matchmaking By comparison, in the metropolitan area of
Accessibility, measured by the share of Buenos Aires, an urban area that has four
opportunities that can be reached within a times more population, accessibility figures
given timeframe, is low in Port-au-Prince. using public transportation are 7, 18, and 34
On average, car users within Port-au-Prince percent for the same time thresholds (Peralta
+ Our assumption is that “opportunities” mainly correspond to jobs or occupations capable of generating income, although
opportunities could also correspond in a limited number of cases to repeated social gathering and other non-job related activ-
ities. The term “job” should be interpreted widely as an activity that takes place regularly in a specific location. Opportunities
are identified, as described in Box 2 of this chapter, as “locations where people frequently spend time during the day.”
# Waiting times could add on average 12.5 minutes to a Tap-Tap trip based on figures from Kopp and Prud’homme (2011).
131
[page 148]
Figure 12.
Flows from Buffer (Commuters Only) - Port-au-Prince
: Living in Buffer (N = 41,678) Working in Buffer (N = 187,141)
L 1
14.0 = oùt
(N = 462,263) IN = 487,398)
E x
sé | si ïE
(N = 952,739) IN = 782,515)
Notes: Home to work trips are represented on the left (people living in the buffer) while work to home trips are to the right
(people working in the buffer). The first row shows results for locations within 1km from city center, the second row for
locations between 1km and 5km from the center and the last row for locations beyond 5km and within 25 km from the center.
The red shade indicates trips that originate and end in the same buffer while the blue shade indicates that the commute spans
over two or more distance buffers.
Source: Authors’ elaboration using Digicel data.
[page 149]
Figure 13.
Flow of Commuters from Buffer - Cap-Haïtien
fs Living in Buffer (N = 12,301) joie Working in Buffer IN = 74,266)
0
= ot
{N = 114,078) IN = 74,650)
ù | où fl
IN = 74,268) Er IN = 51,829)
Note: Home to work trips are represented on the left (people living in the buffer) while work to home trips are to the right
(people working in the buffer). The first row shows results for locations within 1km from city center, the second row for
locations between 1km and 5km from the center and the last row for locations beyond 5km and within 25 km from the center.
The red shade indicates trips that originate and end in the same buffer while the blue shade indicates that the commute spans
over two or more distance buffers.
Source: Authors’ elaboration using Digicel data.
[page 150]
SHARE OF ACCESSIBLE OPPORTUNITIES IN PORT-AU-PRINCE WITHIN
ONE HOUR BY CAR (LEFT PANEL) AND BY TAP-TAP (RIGHT PANEL)
1 Mere AVE Dt | À Le ES HER |
NERE be: DEPPACE TEEERS \ NER ; ES] AGE Ja \
DLL by car within one hour mate by Tap-Tap within one hour
3 he SOS a: HE rt ÉÉORREEERS
Source: Authors’ elaboration using Digicel data.
Quirés 2015). And in Greater Dakar, an urban ties and live in an area where the road and the
area roughly equivalent in size to Port-au- Tap-Tap network are the densest. Conversely,
Prince, with a population above 3 million accessibility sharply drops as one moves away
(World Bank 2016), the share of accessible from the city center, albeit more gradually
jobs within one hour is 52 percent, nearly for car users whose vehicles can compensate
twice the level in Port-au-Prince (Stokenberga longer distances with higher speeds.
2017). Pedestrians in Port-au-Prince have While we do not have the Tap-Tap network
lower accessibility levels with a maximum in Cap-Haïtien, so cannot compare for this
of 12 percent of opportunities that can be transport mode, accessibility is higher for car
accessed within one hour. As discussed in the users and pedestrians than in Port-au-Prince.
previous sections, given that a large share of À smaller urban footprint and lower popula-
the population cannot afford to commute by tion means that it is easier to commute to
Tap-Tap, accessibility levels will remain low, jobs and other opportunities, even the most
closer to the levels displayed for pedestrians. distant ones, including by walking (Table 3).
Central residents of the Port-au-Prince The share of opportunities that can be
urban area have better access to opportuni- accessed within thirty minutes by car is nearly
ties. Figure 14 shows the spatial distribution twice as high in Cap-Haïtien (42 percent)
of accessibility to opportunities for people than in Port-au-Prince (24 percent). This
commuting by car and by Tap-Tap. Unsur- can be explained easily by a smaller urban
prisingly, central residents benefit from footprint in Cap-Haïtien, which mechani-
higher accessibility levels, as they both are cally reduces distances to jobs, markets, and
physically closer to a large share of opportuni- other opportunities (Figure 15).
[page 151]
42% 8%
52% 12%
63% 18%
Source: Authors’ elaboration using Digicel data.
SHARE OF ACCESSIBLE OPPORTUNITIES IN CAP-HAÏTIEN WITHIN
ONE HOUR BY CAR
As || ! E-
TT L EL EEE
= LT 31) ! pl
ET ET le | AS-ORA sa
(CR 1 M SNPARE: ©
VD IUT mn 4 Ne
Le E “UE J JE $ RL snare of accessiie opportunities
a 1e myAE by car within one hour
_arÉ g 000 LE #02 940 M 020-600
Source: Authors’ elaboration using Digicel data.
[page 152]
Surprisingly, however, despite the smaller roads beyond the core center of Cap-Haïtien,
urban footprint of Cap-Haïtien, the accessi- as well as the low intensity of land develop-
bility within one hour is similar to Port-au- ment, which means that opportunities are
Prince (63 vs. 61 percent). This can be sparse beyond the urban core as seen in
explained by the decrease in space devoted to Chapter 2.
Table 4. IMPACTS OF INCREASING SPEEDS ON THE TRANSPORT
NETWORKS IN PORT-AU-PRINCE, COUNTERFACTUAL SCENARIOS
ACCESSIBILITY IN PORT-AU-PRINCE FOR VARIOUS SPEEDS ON THE NETWORK WITHIN ONE HOUR
CARS TAP-TAP
Baseline: 50% of official speeds 61% 27%
40% of official speeds 48% 21%
60% of official speeds 71% 33%
70% of official speeds min 80% 40%
80% of official speeds 85% 45%
Official speeds 91% 55%
Source: Authors’ elaboration using CNIGS data on road and Tap-Tap networks and regulatory speeds.
TRANSPORT INTERVENTIONS THAT FOCUS In Cap-Haïtien we find similarly strong
ON SPEED AND RESILIENCE CAN REDUCE impacts of increasing speeds. We display the
SPATIAL MISMATCH results for car users.
Improving speeds on the network Increasing speeds in the urban areas of
Increasing speeds in Port-au-Prince is Port-au-Prince could help cities become
one way of achieving higher accessibility, matchmakers to boost economic growth.
especially for Tap-Taps. If current speeds There are many options to do so. The most
could double and reach the regulatory speeds obvious one would be to invest heavily in
of the network, then average accessible oppor- roads and public transport. However, such an
tunities using the Tap-Tap network would option would require large financial resources
double and reach 55 percent. and is unlikely to be very effective before the
136
[page 153]
VISUAL DEPICTION OF INCREASING THE SPEEDS ON THE NETWORK
FOR TAP-TAP ACCESSIBILITY IN PORT-AU-PRINCE
(A) Baseline: 50% of official speeds (B) Official speeds
° 5 Ê 1 Dim : Ééiec PE % = ° 5 10 1 œim “: *< BA % *
+ F EL Lt h: x Ha Lt
AS, Si à F4 HR à à F4
PACS LS HELD Hs
A WE “op +
ka ape LES 28 IS RÉRER M: 10€ ka Hate EE pr Se XF VS
M A in
DH RE 2247 TN MR pH RE 2247 PNR
(C) 70% of official speeds (D) 80% of official speeds
° 5 10 1 Dim JE ë : 4 { : ° 5 10 1 Dim MA me : ee < -
HS. EN Res HR METRE
CR Hat © PT ©
GRR. A0 ape. C9
ner LIEU ee TIR Qi
7 Da ce Le TN 2 7 CEE: EEE
) Eu à mn à ET DÉS : il : sue sn D à; LE MRBRIE “ad
2
HER RSR Re | en RSR
Source: Authors’ elaboration using CNIGS data on road and Tap-Tap networks and regulatory speeds.
137
[page 154]
Table 5. IMPACTS OF INCREASING SPEEDS ON THE TRANSPORT
NETWORKS IN CAP-HAÏTEN, COUNTERFACTUAL SCENARIOS
ACCESSIBILITY IN PORT-AU-PRINCE FOR VARIOUS SPEEDS ON THE NETWORK WITHIN ONE HOUR
CARS
Baseline: 50% of official speeds 63%
40% of official speeds 55%
60% of official speeds 72%
70% of official speeds 78%
80% of official speeds 83%
Official speeds 90%
Source: Authors’ elaboration using CNIGS data on road and Tap-Tap networks and regulatory speeds.
chronic challenges on the current network reach, but in central areas of Port-au-Prince it
are addressed. À more immediate solution often only means going from 5km/hour (barely
consists on first improving the operation and quicker than walking) to around 10km/hour.
maintenance of the current network. Both
options are not mutually exclusive, but the Road network vulnerability to natural
most effective sequencing would be to begin hazards: accessibility implications
improving the existing network. Road space Natural hazards have both direct and
management and road maintenance can go indirect costs. They have obvious disastrous
a long way to increasing speeds, and they are humanitarian consequences such as loss
both achievable. Road space management of life, injuries, and grief. But by damaging
implies ensuring that roads are used for circu- infrastructure such as housing, roads, and
lation, rather than to accommodate on-street electricity production facilities, they also
parking or pedestrian movement. In turn, this impose high direct costs of repairs and
means securing the sidewalk for pedestrians rebuilding. Finally, the disruption to the
so that they do not have to step on and off the network infrastructure, typically roads and
sidewalk. Road maintenance could also pay electric transmission lines, also imposes high
high dividends as drivers would no longer indirect costs to society through ripple effects,
have to slow to a near halt to avoid a pothole, where people are no longer able to reach their
for example. Doubling speeds can seem out of jobs or by disrupting supply chains.
138
[page 155]
VISUAL DEPICTION OF INCREASING THE SPEEDS ON THE NETWORK
FOR TAP-TAP ACCESSIBILITY IN CAP-HAÏTIEN
(A) Baseline: 50% of official speeds (B) Official speeds
Lee — = 4
=", _” 5 = à
“us El Le: | 4 , BuURE EP. re ,
ÉRC EEE. 0 bi e me PRE. db Han PR En
A BETETE CUS Ce CCC | Fa Da DR eu: SF EL ET
NE | ns LE TUEESSSSSS Ÿ LRESS Et G CSSS CC RE
TT FRÈRES CCC CES LE STE _j _…
a Cr La D CCS eu ES PE ter à
En ETECR TT CRERE - A'VLfe: CLOUS EYssége)) HE Ace:
EA CENT ul LE DAT HA qui CR RIUR ee EU L'ART LE | FA)
Let LE D FR NS l OA ra SRE | a ER
ER DERRRRGRES “HER | | mi DEN NE HACHrE at À
Ra! | | M ‘ER CT RES E e, , rs Ag ra L a EL 1
Mo RREN. pisse. JE) <CRDEER Hô | 14
ET e nee 1 {à Mann té D by car within one hour
A EN PS bu fe D y 20 _Pue: « 2 Es |; | Bai Menten « 0
METANE CEE Cry ie Le LL 0 4) = sers .
2 2 + e 2. 4 4 < P7 2 Lé Pa A
(C) 70% of official speeds (D) 80% of official speeds
= __— = ___—
7-1" RERsEn — arE l'E —
_N_ pe fs TOR re
EE EE ere TE + RE
LA ENS id MT | | | RE LP DD can Pond CORRE EN
2 Po 6 | ec: ER MMM Me © ET salle |
ET . En BAUDE < © 00 SE ie CE 2 < 3
FT NE] RL un Le - RL EL | NE = Le. .
Source: Authors’ elaboration using CNIGS data on road and Tap-Tap networks and regulatory speeds.
139
[page 156]
Figure 18.
ù 5 1 15 20 km DE le
DS ail 4
RÉ ARNRE 2 f| (Crce SE DIT d
PE SR RS Le
SE
[Dax K {>
\ Q
Critical links in the road network Le
— critieal_links 4 ET. A
— Road nebaork Sr 0 2
Source: Authors’ elaboration using CNIGS data on road and Tap-Tap networks.
Identifying the most critical links in the as a consequence of hurricanes and river
road network is the first step to address these flooding (World Bank 2010). These repeat-
potential vulnerabilities and build resilience edly damage the road network, entailing
in the face of disruption. As mentioned longer commuting times at best and, in some
in Chapter 2, Haïti is highly vulnerable to instances, the disconnection of entire areas
disasters; over the course of the last century of the country, particularly urban. Under-
up to 2016, a minimum of 100 hazard events standing which road sections are the most
took place, according to the Emergency critical links in the road network is a first step
Events Database (Guha-Sapir, Below, and in building a strategy to increase resilience
Hoyois 2017). Geophysical, hydrological, to these low-key yet costly disruptions. The
and meteorological events alone affected a analysis presented below focuses on Port-au-
minimum of 11.7 million people directly or Prince, because of its importance in terms of
indirectly. While the 2010 earthquake was population, wealth production, and exposure
by far the deadliest and most disruptive, to floods, but could be extended to Cap-Haï-
Haiti also experienced lower magnitude tien and other frequently exposed urban
yet recurring flood episodes, frequently areas in the future.
140
[page 157]
TWO EXAMPLES OF THE LOSS OF ACCESSIBILITY WITHIN AN HOUR
COMPARED TO THE BASELINE TRIGGERED BY THE DISRUPTION OF
ROAD LINKS TOWARD CARREFOUR AND CANAAN. THE IMAGE SHOWS
CONSIDERABLE LOCALIZED LOSSES IN ACCESSIBILITY FROM DAMAGE
TO SPECIFIC ROAD LINKS.
Ë 5 pe æ 20km =
| SET |
CET OT]
AT [1
2 RPREH ER
Ne ee”
CEVREREEAREUT 1]
PETER RRENRRENRLT TT LT
FRERES
FR RE
_ PRE
[LE SISSUEARMÉS, AGEN VTR VURANNREE EE Q
PE CR UN RL SO EN ENRENER
MUBBUE 0 __ _ SFSOAREDS TE SAR TISUVENEE] PA Le ANS
Énnecassmnun - SLA CDTENNMENC ANA \! At
Rat CPR (UD MERAUSSZIRARRARE "LIT Hi CIE AVES V
LP OTATItTE D CETTE LE LERRIMERER »"
CS NOT CTI EEE TELEREEEEPT FFE
1 DO CLEO TEETIT EE D
ETF CI ELA |
; _ Cry 0 Ps
Loss of accessibility (% point)
road network D) 25.0 - 20.0 MN 65.0 - 70.0
414143 EM %.0-35.0 M 700-750
= 00-0.0 ES 350-400 M 75.0- 30.0
C2 00-50 En 40-450 MM 600-850
"CI 50-100 EM 45.0-50.0 ME 85.0 - 90.0
*k C3 100-150 SM 500-550 90.0 - 95.0
"2 [I 150-200 MN 55.0-60.0 MN 95.0 - 100.4
En 200-250 (M 600-650
| LEFPEEFERÉRRE EE
PRES 4
ATEÉÉDTOT OT EE 1
LTLEFFEEENLELELELERTTIT
CÉSAR
D 3 2 LE XL 4 a
LA DR Fi 23 BAD 1 La LS SL 22 2 € 2 IN EE TL
REPOS PRAIRIE
ERFÉRRRREC EEE PERP EEE
; Pnncanannnann : 4m iU ie: CCM EAREURSSEES UN
\ EE ON NS A 7 2 CT MG 2 27 SN 2 2 OR NA 3 PS ON EE ES A ES
PACE] CT ECECEASPEM RER RIRE DMePPL EE T PETIT TT +
S } CHE TIRE ET ET TT
Re"... CEE ETETETREEEE LERRIIMERENTY NET L
RS D HPELCERECEEFTEPELEPIT PTIT
< CEE RES
LOF
< Es SA
ET]
‘ Loss of accessibility (% point)
road network F1 25.0- 30.0 MB 65.0 - 70.0)
d_14101 En %0-350 MB 70-750
- 00-00 (EM 350-400 HE 75.0 - 0.0)
LD 00-50 EM 400-450 M 500 -85.0|
JC 50-100 (M 450-500 IN 85.0 - 90.0
# 2 C2 100-150 M 500-550 M 00 -595.0|
AC 150-200 MN 550-60.0 M 95.0 - 100.
On 200-250 (MN 600-650
Source: Authors’ elaboration using CNIGS data on road and Tap-Tap networks.
141
[page 158]
The most critical links in the road network hazards, such as floods, by implementing
of Port-au-Prince are (1) the segments of measures that would make them less
the RN2 (Route Nationale 2) that connect vulnerable. This could involve, for example,
downtown to Carrefour and beyond to the elevating a road where floods are most likely
west, (2) the RN1 going from the downtown to occur. The second primary option is to
to the north of Port-au-Prince, (3) an isolated invest in redundancy. By building alternate
link that connects downtown to Petionville, routes, the impact of a disruption to a specific
and (4) a couple of links that join Canaan link would remain small, as residents,
to the rest of the network. The most critical workers, and enterprises would have an
links, in red in Figure 18, are identified based alternative option to bypass the bottleneck.
on the impact that their removal has on Deciding which of these options makes most
average accessibility within the urban area sense should be done on a case-by-case basis
of Port-au-Prince.!? When a specific link is and goes beyond the scope of the paper. The
disrupted, it forces users to choose an alter- analysis presented here, however, provides a
native route which will lengthen the trip and first step to investigate further.
potentially lead a number of jobs to become
out of reach within specific timeframes. The MATCHING PEOPLE AND JOBS - OVER-
accessibility impacts of the road network COMING THE CHALLENGES
disruption ignore second-order effects such The previous sections have highlighted
as increased congestion on alternative roads. that the two main urban areas in Haiti
While average loss of accessibility suffer from low employment accessibility,
remains moderate when particular road which hampers the potential for growth
links are disrupted, specific urban areas and inclusion. The spatial distribution of
can be strongly impacted, losing access to opportunities (mainly jobs) resembles that
up to 80 percent of opportunities.# This is of homes, meaning that there is limited
typically the case in Canaan and Carrefour, clustering of economic activity occurring.
for example, as shown by the maps in Figure This outcome is both a consequence of low
19. The loss in accessibility to the west of accessibility and constrained mobility and a
Carrefour is much more severe, as indicated cause for fragmented and local labor markets
by the dark brown shade; however, it is less unlikely to benefit from economies of concen-
widespread and affects many less people tration. Of course, increasing accessibility is
than in Canaan. only one step in creating jobs and achieving
The identification of the most critical efficient labor markets, but it is a key part of
links in the network is a first step to build the solution. In parallel, the high exposure
resilience into road infrastructure. There are of Haïti to natural hazards imposes the need
two main options to do so. The first involves to think about vulnerabilities and the resil-
better protecting the road links from natural ience of the road network. There are three
2 The criticality analysis has been carried out without the use of a traffic assignment model. It therefore cannot account for increases
in congestion levels, and thus speed reductions, on alternate links when one route becomes unavailable. In consequence, the
figures displayed here represent a lower bound of the impacts of road disruptions; real impacts are likely to be higher.
3See appendix for more information on the criticality analysis.
142
[page 159]
broad avenues for improvement: increasing the pavement. It should be noted, however,
travel speeds and improving comfort through that simply banning street vendors from
more investments and improved efficiency in sidewalks would carry potential negative
Port-au-Prince and Cap-Haïtien; increasing social impacts and should only be done if
the affordability of collective transport for accompanied by a well-designed strategy
inclusive matching (including through travel to offer alternative options and transitional
speeds increases); strengthening coordina- support for street vendors. An experience
tion of land use and transport investments in Panama City is of interest here, as close
for improved access and increased resilience. to 300 street vendors were relocated to an
We will discuss these three broad priorities in underutilized property, de facto creating
detail below, laying out the possibilities for what became a popular market. Progress
improvement and drawing, where available, was also made in Delhi, India to safeguard
from successful examples around the world. pedestrians while providing vendors, an
integral part of urban streets in Delhi, a
Increase speeds and improve comfort separate space for commercial activities
through more investments and enhanced (WHO 2009). The solution was to identify
efficiency the road segments with the most fatalities
One area for improvement is investing and to create a protected pedestrian lane.
in and better managing sidewalk space for Sidewalk investments and management will
pedestrians. As argued in this chapter, a not only speed the trips of pedestrians, but
large share of the population in the urban equally those of cars and Tap-Taps that will
areas of Port-au-Prince and Cap-Haïtien are no longer have to stop or swerve to avoid
pedestrians. It is very important to make sure pedestrians.
that their travel conditions are as good and More efficient use of road space can go a
safe as possible, as approximately a quarter long way in reducing travel times. Evidence
of road fatalities worldwide are pedestrians on Port-au-Prince suggests that lack ofurban
(WHO 2015). Ensuring comfort and security road space is not the current main cause of
of those commuting by foot should be a congestion and low motorized travel speeds
priority, particularly where sidewalks do (Kopp and Prud’homme 2011). Rather, it is
not exist in urban areas. Where sidewalks the sub-optimal use of road space. Lack of
exist in Port-au-Prince, evidence suggests dedicated parking space results in stationed
that they are used mainly for commercial vehicles occupying one of two lanes where
purposes by street vendors who occupy two-lane roads exist, both ways. As street
most of the available space and frequently vendors force pedestrians off the sidewalks,
force pedestrians onto the pavement where these can be pushed farther onto the street
they are in danger of getting hit by a vehicle by stationary vehicles. Besides the risks, this
(Kopp and Prud’homme 2011). Besides the also means that a sizeable portion of street
risks associated with sharing road space with space is not used by traffic. Finally, the lack
vehicles, competing uses of sidewalks can of dedicated stops where Tap-Taps could
also lengthen trips made on foot by forcing pull over to pick up and drop off customers
pedestrians to constantly step off and on slows traffic considerably. Identifying areas
143
[page 160]
on main streets with enough space for a Tap-Tap fares, rendering motorized transport
Tap-Tap stop to be added would be a low-cost further out of reach for a large share of the
option to relieve traffic congestion. Similarly, urban population. There is thus a need to
where possible, it would be important to think of mechanisms that could offset rises
identify space that could be used for parking, in Tap-Tap fares or even reduce them. We will
therefore freeing up a large chunk of road explore below a number of avenues for doing
space. To be effective, parking enforcement so while acknowledging that more careful
will be key. analysis is needed, in particular by better
Road maintenance can save both vehicle understanding the economics of Tap-Tap
maintenance costs and travel time. Potholes operations. À World Bank study tackling
and uneven road surfaces force vehicles these questions is currently underway. What
to slow down. They also damage vehicles, most of the explored options have in common
increasing repair and maintenance costs. is that they seek to reduce costs for Tap-Tap
Regular road maintenance could reduce operators, crucial actors of urban mobility,
both these effects. À road maintenance fund likely resulting in lower transport fares.
exists and should be properly supported. Improved transport speeds, already
In the longer term, collective transport discussed in the previous section, would
lanes could be a promising approach to allow Tap-Tap drivers to increase the
reduce travel times in urban areas. Tap-Taps number of trips that they can make within
mainly run on roads that have two lanes in a given timeframe. This would also result in
each direction. If road space can be freed up more paying customers and higher profits.
for traffic as argued above, and given current Therefore, all options that can reduce travel
low motorization rates, it would be sensible times through road space management
to reserve space for collective transport. would participate in lowering operational
costs. It cannot be emphasized enough:
Increase affordability of collective transport increasing travel speeds will enhance both
for inclusive matching accessibility and affordability of motorized
Affordability of collective transport is a key transport.
constraint for urban areas in Haiti to act as Boosting the energy efficiency of
matchmakers, better connecting people with Tap-Taps, while likely increasing the initial
opportunities. While a pedestrian in Port-au- capital investment in the vehicle, would
Prince can access on average 12 percent of reduce the cost burden of fuel and thus the
opportunities within one hour, a Tap-Tap cost of operating the vehicle. Options to do so
rider can access 27 percent. Yet affordability involve either the purchase of higher capacity
of collective transport is further threatened vehicles, which would have a lower fuel
by the need to eliminate fuel subsidies, consumption by passenger, or the purchase
which are both unsustainable from a fiscal of more fuel-efficient vehicles of similar
and macroeconomic perspective and highly size. Both these options appear reasonable
regressive, overwhelmingly benefiting the and warrant further investigation. The hilly
richest households. The removal of fossil fuel landscape of some Haitian cities (in partic-
subsidies, however, will likely result in higher ular Port-au-Prince), as well as the existence
144
[page 161]
of narrow roads, deserve careful thought In the longer term, carefully targeted
when advising for the purchase of larger and transport subsidies could be directed toward
less maneuverable vehicles. As for incentiv- the poorest households in urban areas in
izing the purchase and operation of higher Haiti. These targeted demand-side subsidies
fuel efficiency vehicles, experiences in other are widely recognized as the most efficient
countries can provide some guidance based mechanisms to ensure that the poorest get or
on lessons learned. The authorities in the retain access to opportunities without exces-
urban area of Dakar, for example, created sively burdening the local or national budget
incentives for informal minibus operators to (Estupiñän et al. 2007). Such subsidies,
purchase more fuel-efficient vehicles. From however, require detailed registries that aptly
2003 to 2008, operators were provided a subsi- capture households’ or individuals’ socio-eco-
dized loan for the purchase of more fuel-ef- nomic conditions. While these seem out of
ficient minibuses, which covered nearly 75 reach in Haiti at present, in the longer term,
percent of the purchase cost of the vehicle they could be an interesting option.
(Kumar and Diou 2010). In exchange, car
rapides" 4 owners had to retire their previous Strengthen coordination of land use and
vehicles, become a member of a transporta- transport investments for better access and
tion association (thereby formalizing their resilience
activity), and accept to run a specific route There are two main ways of improving
for a fixed set of tariffs. The success of the accessibility to opportunities in urban areas:
operation is still debated; while evidence increasing speeds and reducing distance.
suggests fares were reduced, usage appears These two opposite options are famously illus-
to remain low (Kumar and Diou 2010). In trated by Atlanta, on one hand, and Barcelona,
particular, the assessment of this project on the other (Bertaud 2002). The first one is to
concludes that leasing mechanisms can be increase travel speeds, primarily by investing
effective in replacing aging public transport in the connective network, but also by making
fleets, but that their success depends on motorized transport more affordable so that
“operator inputs at the design stage, technical a larger proportion of the population can
assistance to professionalize operators and travel at higher speeds. The second option
drivers, and restructuring of the network of is to reduce the distance between homes
informal transport operators.” This option and opportunities. This entails reducing the
would require more in-depth analysis to fragmentation of the urban footprint, incen-
uncover whether a suitable model can be tivizing density of people and opportunities
identified and negotiated with the operators and better integrating land use and transport.
in Haïti. An ongoing technical assistance of Population densities in Port-au-Prince and
the World Bank is exploring different mecha- Cap-Haïtien are high (up to 90,000 people/
nisms to offset fuel cost increases, and the km2 in Port-au-Prince) suggesting that the
results will inform whether scrapping old potential to increase accessibility by reducing
Tap-Tap vehicles is a viable option. distance is limited. Chapter 2 on planning
% Informal and colorful paratransit vehicles in Dakar.
145
[page 162]
actually suggests that these urban areas are vulnerable to river floods as it is situated on a
crowded, in the sense that higher densities slope. However, it is situated at a long distance
have not been supported with adequate infra- from the center of Port-au-Prince and is
structure. In fact, urban growth has continued connected by few roads, limiting accessibility
at the same pace in central Port-au-Prince to economic opportunities (as can be seen in
as in the more peripheral area of Croix-des- Figure 18). In Cap-Haïtien, as documented in
Bouquets, indicating continued increases the planning chapter, urban growth has taken
in population in an area that benefits from place close to the city center and, thus, close
highest accessibility. This pattern contrasts to the economic opportunities, but at the cost
to that observed in many other major cities of high risk, as urbanization between 2005
around the world where more rapid growth and 2015 encroached on the riverbed by 21
occurs in the outskirts of urban cores (Angel percent. Careful planning should avoid these
et al. 2011). In the short term, therefore, trade-offs and incentivize settlements that
there is only limited scope to reduce distance are in areas relatively safe from multiple risks
between people and economic opportunities (or can be protected more easily) and benefit
by increasing densities further. To be able to from proximity to economic opportunities,
do so without worsening living conditions either through physical proximity (infill rather
would require the construction of taller multi- than leapfrog urbanization) or through access
family buildings. In the medium term, such a to transportation options.
solution should be encouraged, but it requires Planning itself is not sufficient; imple-
the emergence of a skilled construction sector mentation is key. The planning chapter has
able to enforce building codes to help units documented that informal and uncoordi-
withstand seismic hazards. nated urban growth has happened despite a
There is, however, considerable scope to wealth of national, sectoral, and local plans
promote accessibility by planning for urban for both Port-au-Prince and Cap-Haïtien.
expansion, while simultaneously reducing Three recommendations appear to be relevant
exposure to natural hazards. Planning for here, too. First, increase coordination and
urban expansion should have a double focus cooperation across implementing agencies
in Haitian urban areas: limit the exposure of to maximize the chances of success of these
people to natural hazards and promote acces- plans. Second, set achievable goals which
sibility to economic opportunities. Examples are more likely to be taken seriously and less
in Port-au-Prince and Cap-Haïtien show that likely to trigger unintended consequences.
urban growth can achieve one of these, but Third, “plan for the best, but prepare for the
not both simultaneously. In Port-au-Prince, worst.” Tunis, Tunisia provided clear and
recent development north of Croix-des-Bou- transparent information on where future
quets, in Canaan, came in the aftermath of infrastructure would be laid out. This did not
the 2010 earthquake. It appears to be less prevent unplanned urbanization from taking
3 À recent World Bank report describes the consequences of ill-adapted land use regulations to a country’s development state.
In some cases well-intended regulations such as minimum lot size, which aim at providing a basic living space per person,
can be unaffordable for residents and force them into informality (Lall, Henderson, and Venables 2017).
146
[page 163]
place, but it had two advantages: it effectively main options. The first is to retrofit/improve
guided the new informal settlements into the road links to increase their resilience to
areas where the government had planned certain types of disasters. This could involve
expansion, and it incentivized households to improving the drainage system of the road or
leave the rights of way that would be servicing elevating the road. The second option is to
these areas in the future (with roads, sewer invest in network redundancy. This option
systems, etc.). By doing so, the government can be more favorable when the cost of
reduced construction costs as retrofitting is improving the resilience of the road segment
typically more expensive. is high or when it is difficult to assess the risks.
Creating functional land markets is a notori- Considering that risk is a function of
ously arduous task. Yet it is essential ifland is to physical vulnerability and level of hazard
be used at its highest value. Throughout cities exposure, improving infrastructure and
across the globe, high-value land typically promoting urban development in less-ex-
promotes density, as it supports accessibility posed areas are complementary measures that
to economic opportunities through reduced contribute to building resilience and reducing
distances. The planning chapter has provided disaster risk. The rehabilitation or protection
some ways forward. They do not always involve of critical infrastructure such as roads, as a
formalizing land titles, but they should allow corrective measure, will decrease the vulner-
for their transferability. ability of the infrastructure, thus reducing
In a resource-constrained country such as disaster risk. Proactively guiding urban devel-
Haiti, there is an even greater need to make opment and new transport investments in
the most efficient use of funds devoted to road areas that are less exposed to natural hazards
maintenance/improvement. Given the high through land use planning and the use of risk
exposure of the country to natural hazards, information, as a preventive measure, will
attention should be paid to building the also reduce the overall risk.
resilience of the network. Indeed, recurrent However, improving or protecting infra-
localized natural hazard events (such as structure as a risk-reduction measure can be
floods) can lead to the isolation of neighbor- extremely expensive for local and national
hoods, which impacts commuting patterns governments. Large scale, city-wide infra-
and disrupts economic value chains. One structure investments for flood protection or
method for identifying the most urgent measures to make roads, ports, and power
areas of intervention is through a criti- generation facilities more resilient to extreme
cality analysis. This chapter has provided a events may be necessary in many cities in
roadmap for road work/maintenance prioriti- the short term, but they are expensive. For
zation. While incomplete, as it does not build example, the cost of protecting the 100km
in congestion costs, it still identifies the most coastline of Dar es Salaam with a sea wall
critical road segments. would be USD 270 million. Therefore, it
While the criticality analysis presented is imperative to develop accountable and
in this chapter identifies priorities, the type responsive governance systems that can
of intervention needed will warrant a more build long-term resilience through capacity
in-depth economic analysis. There are two building, and land use planning.
147
[page 164]
The Can-Tho Urban Development and
Urban resilience Project in Vietnam combines
both approaches to reduce the risk of flooding
and build long-term resilience. The project
aims to improve flood risk management and
environmental sanitation through priority
flood control infrastructure investments in
the urban core, including surrounding the
embankment, building tidal gates/valves,
and improving the drainage system. It also
promotes the development of new low-risk
urban growth areas by enhancing connectivity
with the city center through the construction
of transport investments on higher grounds.
The new and improved transport infra-
structure aims to increase accessibility and
connectivity, land values, and investment
opportunities. Project activities are supported
by the development of management systems
to improve spatial planning, flood risk
management, and transport, including a
web-based geospatial database that serves
as a single platform for spatial data and is
intended to be used across departments for
purposes of spatial planning and infrastruc-
ture development. These lessons can be
applied to a Haïtian context.
148
[page 165]
REFERENCES Franklin, S. 2015. “Location, Search Costs and
Youth Unemployment: The Impact of a
Angel, S., J. Parent, D. L. Civco, and A. M. Blei Randomized Transport Subsidy in Urban
2011. “Making Room for a Planet of Cities.” Ethiopia.” CSAE Working Paper WPS/2015-11.
Policy Focus Report, Lincoln Institute of Land Guha-Sapir, D., R. Below, and Ph. Hoyois. 2017.
Policy. “EM-DAT: Emergency Events Database.”
Antos, S.E., N. Lozano-Gracia, and S.V. Lall. 2016. Brussels, Belgium: Université Catholique de
“The Morphology of African Cities.” World Louvain. http:/www.emdat.be/. :
Bank Policy Research Working Paper, no. 7911. IBM. 2011. Global Commuter P ain Survey:
Avner, P., and SV. Lall. 2016. “Matchmaking in Traffic Congestion Down, Pain Way Up.
Nairobi: The Role of Land Use.” World Bank http://www-03.ibm.com/press/ us/en/pressre-
Policy Research Working Paper, no. 7904. lease/35359:wss. k
Bengtsson, L., J. Gaudart, X. Lu, S. Moore, IHSI. 2007. “Enquête Transport 2004-2005.”
E. Wetter, K. Sallah, S. Rebaudet, and R. Institut Haïtien de Statistique et d’Informa-
Piarroux. 2015. “Using Mobile Phone Data to tique. : |
Predict the Spatial Spread of Cholera.” Scien- ——— 2012. “Enquête Sur Les Conditions de Vie
tific Reports 5 (1). doi:10.1038/srepo8923. Des Ménages Après Seisme (ECVMAS).
Bertaud, A. 2002. “The Spatial Organization of Institut Haïtien de Statistique et d’Informa-
Cities: Deliberate Outcome or Unforeseen | tique. : :
Consequence?” World Development Report Kim, Y, and B. Zangerling, eds. 2016. Mexico
2003, Background Paper. http:/siteresources. Urbanization Review: Managing Sp atial
worldbank.org/DEC/Resources/spatialorg- Growth for Productive and Livable Cities in
citpdf. Mexico. The World Bank. http-//elibrary.
———. 2014. “Cities as Labor Markets” Marron worldbank.org/doi/book/10.1596/078-1-4648-
Institute on Cities and the Urban Environment, 09163.
New York University. Working paper, no. 2 Kopp, P. and R. Prud'homme. 2011. “Urban
(February). Transport in Port-Au-Prince” prepared for
Cadena, K., and E. Perge. 2017. “Transport and TADB. www.rprudhomme.com/resources/
Poverty in Haiti Existing Evidence from Rap+2011+Port+au+Prince+#28BID$29.pdf.
Household Survey Data.” Draft report. World Kumar, À, and C. Diou. 2010. “Renouvelle-
Bank. ment Du Parc d'autobus a Dakar : Avant
CONATEL. 2016. “Tableau de Bord Du Secteur de : Apres.” 11. Sub-Saharan Africa “Transport
La Téléphonie Mobile.” Conseil National des Policy Program (SSATP) Discussion Paper.
Télécommunications. http://conatel.gouv.ht/ Washington, DC: World Bank.
node/283. Lall, SV., JV. Henderson, and AÀ.J. Venables. 2017.
Estupiñän, N., A. Gémez-Lobo, R. Muñoz-Raskin, Africa's Cities: Opening Doors to the World.
and T. Serebrisky. 2007. “Affordability and Washington, DC https:/openknowledge.
Subsidies in Public Urban Transport: What worldbank.org/handie/10986/25806.
Do We Mean, What Can Be Done?” World Le Gallo, J., Y. L'Horty, and P. Petit. 2017. “Does
Bank Policy Research Working Paper Series, no. Enhanced Mobility of Young People Improve
4440. Employment and Housing Outcomes?
149
[page 166]
Evidence from a Large and Controlled - Toward a New Narrative: Systematic
Experiment in France” Journal of Urban Country Diagnostic” Washington, DC:
Economics 97 (January): 1-14. doi:10.1016/j. World Bank. http:/documents.worldbank.
jue.2016.10.003. org/curated/en/642131467992805241/
Lu, X., L. Bengtsson, and P. Holme. 2012. Haiti-Toward-a-new-narrative-systemat-
“Predictability of Population Displacement ic-country-diagnostic.
after the 2010 Haiti Earthquake.” Proceedings Stokenberga, A. 2017. “Urban Accessibility
of the National Academy of Sciences 109 (29): Analysis for Dakar, Senegal.” Draft. World
11576-81. doi:10.1073/pnas.1203882100. Bank.
Peralta Quirés, T. 2015. “Mobility for All: Getting Tatem, AJ. Y. Qiu, DL. Smith, ©. Sabot, AS. Ali,
the Right Urban Indicator” Connections - and B. Moonen. 2000. “The Use of Mobile
Transport & ICT, no. Note 25 (November). Phone Data for the Estimation of the Travel
http:/pubdocs.worldbank.org/pubdocs/publi Patterns and Imported Plasmodium Falci-
cdoc/2015/11/67931446737085683/Transport- parum Rates among Zanzibar Residents.”
ICT-Newsletter-Note2sa-Nov-highres.pdf. Malaria Journal 8 (1): 287. doi:10.1186/1475-
Peralta Quirés, T., and S.R. Mehndiratta. 2015. 2875-8-287.
“Accessibility Analysis of Growth Patterns in WHO. 2009. “Global Status Report on Road
Buenos Aires, Argentina: Density, Employ- Safety: Time for Action.” Geneva: World
ment, and Spatial Form” Transportation Health Organization.
Research Record: Journal of the Transporta- ———. 2015. “Global Status Report on Road Safety
tion Research Board 2512 (November): 101-9. 2015.” Geneva: World Health Organization.
doi:10.3141/2512-12. World Bank. 2010. “Analysis of Multiple Natural
Peralta Quirés, T., S.R. Mehndiratta, and M. Hazards in Haiti (NATHAT)” http:/
Catalina Ochoa. 2014. “Gender, Travel and reliefweb.int/report/haiti/analysis-multi-
Job Access: Evidence from Buenos Aires.” ple-natural-hazards-haiti-nathat.
Perge, E., M. Muller, G. Fleurantin, and K. ———. 2015. “Better Spending, Better Services - a
Cadena. 2017. “Haiti: Steering towards Review of Public Finances in Haiti” Public
Effective Fuel Subsidy Reform.” Draft report. Expenditure Review. Washington, DC:
World Bank. World Bank Group.
Ryko, J.M. (2014, December 3). La problématique ———. 2016. “Perspectives Urbaines: Villes
de la moto-taxi dans la zone métropolitaine Émergentes Pour Un Sénégal Émergent.”
de Port-au-Prince. Le Nouvelliste. Retrieved World Bank. http:/documents.worldbank.
from http:/lenouvelliste.com/lenouvelliste/ org/curated/en/666911467995082776/
article/138681/La-problematique-de-la-moto- Perspectives-urbaines-villes-émergentes-
taxi-dans-la-zone-metropolitaine-de-Port-au- pour-en-Sénégal-émergent.
Prince World Bank, and ONPES. 2014. “Investing in
Rospabe, S., and H. Selod. 2006. “Does City People to Fight Poverty in Haiti : Reflec-
Structure Cause Unemployment? The Case of tions for Evidence-Based Policy Making.”
Cape Town.” Poverty and Policy in Post-Apart- World Bank. http:/documents.worldbank.
heid South Africa, 262-87. org/curated/en/222901468029372321/Reflec-
Singh, R.J., and M.A. Barton-Dock. 2015. “Haiti tions-for-evidence-based-policy-making.
150
[page 167]
SPOTLIGHT 3. INTER-CITY CONNECTIVITY:
WHY IT ALSO MATTERS FOR HAITI'S
PRODUCTIVITY
Marisa Garcia Lozano*
GAINS FROM INTER-CITY CONNECTIVITY
Chapter 3 focused primarily on assessing the state of Haiti’s intra-city connectivity, and its
impact on employment generation, accessibility, and productivity. Inter-city connectivity, however,
also plays a pivotal role in harnessing the benefits of urbanization and economies of agglomera-
tion. How cities, regions, and ports are connected proves critical in fostering economic prosperity,
reducing poverty, and promoting livability (Ellis and Roberts 2016). So that the benefits of increased
economic density are more widely shared in rapidly urbanizing countries such as Haïti, connective
infrastructure is key (World Bank 2009).
Connecting cities is the springboard to increasing the growth potential and productivity level of
city markets - including markets of labor, goods, and services. Investing in connecting infrastruc-
ture is expensive (at times representing more than 15 percent of a developing country’s GDP), but
it reduces trade costs and facilitates more efficient allocation of resources (Ellis and Roberts 2016).
Inter-city connections benefit both producers and consumers; they give producers access to input
(including labor) and output markets in other cities and regions, and offer more options and better
prices for consumers (World Bank 2013). With better connections, businesses have the possibility
to relocate when land is too costly and hence, grow their profits by moving to other areas. When
access to cities is not adequate, firms are left with no option but to bare these costs.
In addition to enhancing productivity, investing in spatial connectivity also translates into
higher livability levels, as measured by access to non-network basic services, such as education and
healthcare. The quality of life of populations residing in lagging areas improves as they become
well-integrated with places that provide these services. There is evidence pointing to the impact
of distance required to travel to schools on attendance rates. À survey in Sri Lanka indicated that
long distances to travel or lack of adequate transport to schools were given as reasons for non-en-
rollment by children (17.8 percent). Further, a study conducted in Ghana (Vuri 2007) showed that
the farther a school was located from a child’s home, the less likely child was to attend school by
0.03 percentage points for each additional minute of travel.
*The author acknowledges Sarah E. Antos and Katie L. McWilliams for their valuable input.
151
[page 168]
À World Bank report! points to three steps policymakers can take to identify the most effective
improvements to connective networks.
1. Value the city’s external and internal connections. For external connections, this means
comparing a city’s transport costs - and data on density, quality, and capacity of roads, railways,
waterways - with those from similar cities, to identify the biggest improvement needs.
2. Coordinate among transport options and with land use policies and related infrastructure
plans. This calls for identifying the modal mixes that a city demands and encouraging compe-
tition to reduce the gap between transport prices and costs.
3. Leverage investments that will yield the highest returns for cities - collectively and individu-
ally. City leaders must identify connective investments in areas with the highest demand of
inter-city infrastructure and transport services and in corridors that yield the highest returns
for efficiency and equity.
HAITI'S PERFORMANCE IN CONNECTING ITS CITIES
Às mentioned above, connectivity and access to cities brings numerous gains to different stake-
holders. But how well are Haitian cities connected? We can see how cities are performing by assessing
access to markets, as well as access to services that raise living standards. One approach to measuring
physical accessibility is looking at the current road network.
Physical accessibility to markets was calculated for 138 cities and towns in Haiti using the road
network and weighting by the size of markets? À cost matrix function within the network analysis
toolset in ArcGIS was used to measure market accessibility. This function uses the road network to
determine the cost (time) to get from an origin point to a destination point. First, a grid of 27,077 origin
points was created across the entire country using a resolution of 1km , and destinations were identified
as 238 market towns. Travel time calculations resulted in over 3 million routes through the transport
network, connecting the origin points with each destination market.
Às shown in Figure 1, areas with higher levels of accessibility are depicted in red while areas with low
levels of accessibility to markets are in blue. The map below suggests that while market accessibility
in Port-au-Prince and its surrounding areas is high (in red), there are some valleys of limited access
in the north and southwest (in blue), as well as in some areas in the middle of the country (yellow).
Particularly striking are the low levels of accessibility in the south and northwest areas of the country.
Access to schools, hospitals and health facilities was measured across urban and rural populations
based on travel times by road and walking (see Figure 2 [A-C] below). Travel times were measured
based on the speed limits in the Haitian CNIGS road dataset, and a 4km/hour walking speed. The
CNIGS dataset was improved around Port-au-Prince and other small cities in Haiti by using satellite
imagery and/or OpenStreetMap to identify roads that needed to be added to the dataset. Roads were
then individually digitized to create a complete network. Areas were defined as either urban or rural
: World Bank, 2013. Planning, Connecting, and Financing Cities - Now: Priorities for City Leaders. The report discusses
connections both within and between cities, but this piece brings in information related only to inter-city connections.
2 Market accessibility measures were calculated using the following formula: Accessibility of any given Origin Point X = Popula-
tion of Market Town Y ‘e [(-Time between X and Y) / (2* a2)]) where Y is the destination point, e is a constant fixed at 2.71, and
a is the maximum distance across the country.
152
[page 169]
Figure 1.
Market Accessibility R
De à je jet LAS Al
D'ANTTEE L SAN
L # nc À K/
LÉ KE
Reine 4 si
<= è se
Le, ÿ
£ > © Cité Soleil HAS
(se Ÿ
- 0 125 25 50 75 100
RC — Kilometers
Source: World Bank Urbanization Review Team's calculations
based upon the European Commission designations: densely populated areas, intermediate density
areas, and thinly populated areas. The intermediate density areas and thinly populated areas were
consolidated into a “rural” categorization, and the densely populated areas into an “urban” categori-
zation. Hospitals and other health facilities, and schools (provided by the Haitian government) were
then determined to be either “urban” or “rural.”
Catchment areas around the locations of the schools, hospitals, and health facilities were built
based on the following parameters:
+ Hospitals: Urban - within 30 minutes of driving; Rural - within 60 minutes of driving
+ Other Health Facilities: Urban - 15 minutes driving; Rural - 30 minutes driving
- Schools: Urban - 30 minutes walking; Rural - 60 minutes walking
Catchment areas were created by linking the hospital, health facility, and school locations to the
closest point along the road network (with a maximum snapping distance of 5km). All hospitals and
health facilities were within this threshold of a road, but there were 152 rural schools that were not. In
such cases, it was confirmed with satellite imagery that there were no apparent roads in the vicinity.
153
[page 170]
Figure 2.
(A) Access to Schools
100%
75%
50%
25% ee,
®,
0%
M Lopuiation Not Near a school on
EM Rural Population Within 60 Minutes Driving nd
© Urban Population Within 30 Minutes Driving
(B) Access to Hospitals
100%
75%
50%
25% %
>
0%
BH Population Not Near a Hospital un
D Rural Population Within 60 Minutes Driving nn
= Urban Population Within 30 Minutes Driving
(C) Access to Health Facilities
100%
75%
50%
25% ms — %
35 _+
0% es
M Population Not Near a Health Facility 0
EM Rural Population Within 30 Minutes Driving di
Urban Population Within 15 Minutes Driving
Source: World Bank Urbanization Review Team, with data from the Haitian CNIGS road dataset and population data from
Haiti WorldPoP (www.worldpop.org).
[page 171]
Figure 3.
O9 OO
0.816
0.800
0.700 —
0.600
0.460
0.500 3
O.40O
O3.
0.200 A
0.100 — mnt 0.080,0.003 00040 005 0.018 9.086 0 10 11
0.000
552882885225 298585S 219 2 2 2 % à 8 ©
© © Q © re} Q © © Q Q © e] © Q © Q Q Q Q Q Q Q © re]
SR À 8 À À 8 À À 8 À À À À À À À & À S À à À
SO D OS OL © OL SO 3 © 8 © gs OS OL &œ © 2 SO s Ep E 2 « v
a D À 5 2% D £ © 2 TT D À E nm ® & © À % © 3
PÉSES SI ŸÉ L 5 $ 5 4 8 SE 8 $ 2 à à 8 ©
& M SG À © à m à > 3 À Ë OO $ 3 S L CS
d N S D EE 8 £ À & CE 5) EE TT
ê 5 $ 5 0 à ÿ 0 à 2 2
Z à à A E ÿ 3 - Ë
5 A El Ë
- n =
Source: Authors’ elaboration using Digicel data.
For these unconnected schools, the catchment areas were created by building a 4km buffer around
each school (which approximately equals one hour of walking time). Once all the catchment areas
were created, 1km buffers were added around the periphery of the road-based results in order to better
account for people who may be walking to the road network. Finally, zonal statistics were calculated
using Haiti WorldPop* data to determine the number of people within each of the catchment areas.
According to the results, access to health facilities shows the largest gap, with as much as 3.8
million people not being near a facility. Rural populations are farther away from hospitals compared
to urban residents, with an average travel time of thirty minutes longer. Access to schools is more
evenly spread across the country, but rural populations remain at a far greater disadvantage than
urban dwellers.
3Based on IHSI 2015 estimations.
155
[page 172]
The key to stronger connectivity is a well-functioning and efficient transport network.4 Haitis
transport sector plays an important role in its economy, contributing 12 percent of the national GDEP.
Terrestrial transport moves an estimated 80 percent of goods and people across the country, and hence
the performance of the trucking industry provides a good indicator of connectivity between cities.
In terms of prices for transport services, moving goods around Haiti is highly costly. The price
per transported ton-km is USD 0.43, the highest in LAC, and among the highest when compared
to countries in other regions. In the group of countries shown in the figure below, only Tunisia
(USD 0.45), Japan (USD 0.67), and South Korea (USD 0.81) have a higher haulage price per
ton-km than Haiti.
Fuel, maintenance and tires, and labor are the three largest components of operating costs for all
Haitian operators, representing 44, 27.9 and 22.1 percent, respectively. Road quality is a major factor
contributing to the high expenses operators allocate to tires. They spend as much as 15 percent oftheir
operating costs, compared to a visibly lower average of percent in Central America. According to the
survey, the “road condition” variable increases the price per ton-km by 25 percent on average.
Some progress has been made to improve and expand the road network, and hence improve overall
country connectivity. But greater investments are needed to enhance mobility of markets and produc-
tivity, especially for rural populations. Around 50 percent of the country’s territory is poorly connected,
affecting 3.6 million people, including 3.2 million in rural areas.
An overview of Haitis inter-city connectivity shows that physical access to markets and basic
services such as schools, hospitals and health facilities, is lagging. This is particularly true for cities
and towns outside the Port-au-Prince metropolitan area, which tends to be better connected. To foster
productivity and enhance livability, greater links between cities and between rural and urban areas are
crucially needed. While more work is required to better understand the gaps in connectivity, pointing
to areas for improvement, such as roads, is a starting point. Identifying the bottlenecks in the north
and southwest regions of the country is also key to developing effective policies that contribute to
improving overall connectivity.
WHAT HAVE OTHER COUNTRIES DONE - OR ARE DOING - TO INCREASE INTER-CITY
CONNECTIVITY?
The Republic of South Korea. The Government invested heavily in a major road infrastructure
program to increase connectivity between provinces and cities. The construction of the highway
system yield great economic gains; between 1995 and 2010, levels of gross regional domestic
product increased substantially, especially in areas with better connectivity. The country’s spatial
evolution of the economy also changed with a more integrated transport infrastructure. It enabled
the development of new towns and the deconcentration of manufacturing jobs from Seoul and
Busan into secondary cities.
4This section draws heavily from the 2014 World Bank report on the trucking industry in Haïti. The report discusses the results
of a trucking industry survey developed and implemented by the Etude Economique Conseil (EEC) Canada between March
and May 2014. Its purpose was to develop a better understanding of inter-city and trans-border transport costs in Haiti.
It is based on 280 origin-destination combinations obtained from 100 respondents, including individual Haitian truckers,
medium and large Hatian companies, as well as operators transporting from the Dominican Republic into Haiti.
156
[page 173]
The People’s Republic of China. Since the late 19805, the country has heavily invested in physical
infrastructure to connect cities and regions across the country. The construction of highways and
integration of transport systems has substantially improved connectivity and facilitated mobility
of labor, especially from rural to urban areas (World Bank 2014). More recently, between 2006 and
2012, China built 780,500 kilometers of roads, 50,860 kilometers of expressway, 65,230 kilometers
of rural highways, 20,900 kilometers of railway, 2,3631 kilometers of high-grade inland waterways,
and 41 airports (World Bank 2014). Thanks to the new expressways and high-speed railways, inter-
city travel time has been cut by 50-70 percent. Enhanced connectivity has also improved accessi-
bility to and from second- and third-tier cities, and finance, information technology, tourism, and
manufacturing sectors have gained from facilitated connections between firms.
Sri Lanka. The Government of Sri Lanka carried out major investments to develop its road
sector in order to increase connectivity for social integration and economic development. With
assistance from the World Bank, and other development partners, Sri Lanka launched the Road
Sector Assistance Project. The national road system was made more efficient through investments
in road rehabilitation and maintenance. Improvements in rural roads benefited communities
in terms of access to public amenities, schools, health care, business centers, and markets, thus
promoting spatial equity. Some noteworthy changes include: agricultural sales points increased by
143 percent; 14 percent of students moved from poorly resourced schools to schools in towns with
better facilities and higher quality teachers; and school attendance increased by an average of 45
percent (World Bank 2016).
India. In 2001, India launched the Golden Quadrilateral (GQ), a 6,000 km roadway connecting
the four major Indian industrial and cultural centers: Delhi, Mumbai, Kolkata, and Chennai. The
GQ had improved the connectivity and market accessibility of districts closely located outside
these four cities compared to those farther away. For instance, districts 0-10 kilometers away from
the GQ network show a significant entry of new manufacturing firms and increases in productivity
(Ghani, Goswani, and Kerr 2013).
England. The UK government has put forward a “Northern Powerhouse” policy agenda to
reduce the productivity disparities between the north and south regions of England. In the last 30
years, GVA per capita in the north has averaged 25 percent below than the rest of England (SQW
2016). Initially introduced in 2014 by the then Chancellor of the Exchequer, the Northern Power-
house - home to 10.7 million people - seeks to strengthen the economic and physical connections
of six main city regions: Hull, Leeds, Liverpool, Manchester, Sheffield, and the North East. The
results of an independent economic review concluded that improved transport connections across
the north, along with better skills, innovation, and inward investment, could increase GVA by 15
percent (approximately USD 124 billion) and create an additional 850,000 jobs by 2050. Transport
for the North (TfN), a partnership of elected and business leaders, is currently working on an
ambitious vision for a rail network that will link the six city regions and the regions’ largest airport.
157
[page 174]
REFERENCES
Ellis, P., and M. Roberts. 2016. Leveraging Urbanization in South Asia: Managing Spatial Transfor-
mation for Prosperity and Livability. Washington, DC: World Bank.
Etude Economique Conseil - EEC. 2014. “Report on the Trucking Industry in Haïti - 2014.”
Ghani, E., A.G. Goswani, and W.R. Kerr. 2013. “Highway to Success in India: The Impact of the
Golden Quadrilateral Project for the Location and Performance of Manufacturing.” Policy
Research Working Paper #6320. World Bank.
Institut Haïtien de Statistique et d'Informatique. 2015. Population totale, population de 18 ans et plus,
ménages et densités estimés en 2015. Retrieved from http:/www.ihsi.ht/pdf/projection/Estimat.
PopTotal 18ans Menag2o15.pdf
SQW. 2016. “The Northern Powerhouse Independent Economic Review: Final Executive Summary
Report,” from http:/www.sqw.co.uk/files/5414/6723/8824/16987 - TN - NPH IER - Executive.
Summary _- Final 24 June 2016.pdf.
UNICEF. 2013. “Out-of-School Children in Sri Lanka: Country Study” from http://www.uis.unesco.
org/Education/Documents/srilanka-oosci-report-2013.pdf.
Vuri, D. 2007. “The Effect of Availability and Distance from School on Children's Time Allocation
in Ghana and Guatemala.” Understanding Children's Work working paper series. Washington,
DC: World Bank.
World Bank. (May 5, 2016). Feature Story: 10 Years of Better Roads in Sri Lanka. http://www.
worldbank.org/en/news/feature/2016/05/05/10-years-of-better-roads-in-sri-lanka.
World Bank. 2004. Sri Lanka - Reshaping Economic Geography: Connecting People to Prosperity.
Colombo: World Bank.
———. 2009. World Development Report 2009: Reshaping Economic Geography. World Bank.
———.2013. Planning, Connecting, and Financing Cities - Now: Priorities for City Leaders. Washington,
DC: World Bank.
World Bank. Development Research Center of the State Council, the People’s Republic of China.
2014. Urban China: Toward Efficient, Inclusive, and Sustainable Urbanization. Washington, DC:
World Bank.
158
[page 175]
[page 176]
[page 177]
CHAPTER 4
FINANCING HAITIAN CITIES
Jonas Ingemann Parby
and Joseph Denis*
[page 178]
re - ] . > — ee
4,” : dns 2 7 + KE ERCNE, Le | 21 - L -
LA ‘Rd : y DL 7. x en. * Ve, Er » re | : Lee nd, “ Z "
2 de US ER
y, - _. > 4 d s più S'er d L " "2 — PE à Ter, 1
_n à —…. : sû SAUT TE LEE tee 45 AU TE L"
Le. i «un .— (V1 2e LS € LA VE rer N'AÆL En * 4 Le
D 27 | _ ! oi LI, 4 4 # « »
1 ” 7 41. NS 1! CRE F .. FO : si a
vs - un PAT) f 5 on 2n Le: 27 NS | Cor
RES PULLS me du. SAS 170% À Ve ee
1 T2 &-"?7 à LL. 2 : F A 3e
pa ND EN 2 pts | PA Fu 7-2 Ra: ge
nn. DES 2 " J # , “#
F. + Pat dun, Ja _ hd : ven di CE Le #7,
Er Sr fe ? : > PT y % re « ), ne Pr LT
MEHR... jeun à De 6
ne 7 Te D, Î 5 0 Ve IT CN : ; — ee. Gt
ne DE Dé Si: SRE, Cr RS ire
STE ue ._ —— s | Le 7 ne L 5
+. | Le CPOTERELT Es rITT eT7
- FCI PP TE re de » ”
[Sn EL PR 27 =: PTE 27: à 46e ! 7 rs
2 4 AE ? DRE LATE % FF AD TS na >
» . Cu! « HAL, | AT . à “ k L .
À L . # ra 4 JE ; rer € re Es à RE
dé £ dé in Xe D 2, 7 +. Lu LA z M Ke Nez] | eu Der x
s : : 2 . À 'TIBOR pi: ‘
M ET Mr CES
nes. a =; Le fs ’ pi [ALIS D CLASS #'! + \
Poe en fl EC PE CIAL Bb, UBLIC DOMAIN
DL ver RAPHEDIBY € RE RER IxIMEDIA AUS NA n
. _—— mn — nu Je s n+' 1 . PR + ré = 2 2. % Pere
- . F a: L . , , Er k
[page 179]
CHAPTER 4 — FINANCING HAITIAN CITIES
As mentioned in earlier chapters, cities urbanization, the ability of local governments
become vibrant and livable places for both or communes to finance basic public services
people and firms when they offer adequate and infrastructure is increasingly pressing.
coverage of basic services - such as water, Better planning, connecting and servicing
sanitation, electricity, roads, and solid waste cities and towns in Haiti require significant
collection. But like all large investment interventions to review, revise and scale up
projects, upfront capital is needed to put in existing financing arrangements. The ability
place the proper infrastructure to support of municipal governments to provide services
such services. With the existing gaps in efficiently is heavily constrained when local
infrastructure and services, and the flow of revenues are limited, remain unchanged, or
aid progressively declining, Haiti faces big do not grow a la par with increased population
challenges in strengthening public finances, and responsibilities. In Haïti, due to financial
specifically adapting to the reductions, raising and technical constraints, municipalities are
more resources, and making better use of unable to carry out all the functions estab-
existing funds (World Bank 2016). Despite lished under the 1987 Constitution and other
improvements in Haiti’s own fiscal revenue, decrees related to decentralization (IMF 2015),
from less than 10 percent of GDP in 2004 to as it will be further detailed in this chapter.
12.6 percent of GDP in 2014, Haiti remains Current levels of resources fall extremely short
the poorest performer in revenue mobilization of the requirements and demands for services,
in Latin America and the Caribbean (World and coordination failures increase the risk of
Bank 2016). This greatly hinders the country’'s suboptimal use of resources.
ability to carry out much-needed development Cities need to have resources to address
spending in infrastructure, health, education, the deficiencies across major urban services,
and other key sectors. The infrastructure including drainage and sanitation, solid
financing gap remains very wide and signifi- waste, transport and spatial planning, and
cant amounts of capital are needed to narrow management for future urbanization. Master
this gap. In Haitis current framework of plans for many cities remain unfinanced
decentralization, and in a context of rapid and out of sync due to delays in implementa-
* The team wishes to thank Digicel for granting access to the CDR data. The authors thank Katie L. McWilliams, Benjamin P.
Stewart, and Lauren Nicole Dauphin for providing important help in running the network analysis and the calculation oftransport
times in Port-au-Prince and Cap Haïtien. Pierre Xavier Bonneau provided crucial guidance and, together with Malaika Becoulet
and Franck Taillandier, helped the team navigate the issues of urban transport in Haïti. Emilie Perge’s in-depth knowledge of the
ECVMAS survey was key to understand transport expenditures and to the writing of the corresponding sections in this chapter.
163
[page 180]
tion. Intra-urban transport in Port-au-Prince municipal governance. Public financial
requires investments to upgrade, diversify, management capability is weak in municipal
and scale public transportation systems. Some governments, and budget execution is ineffi-
missing road links need to be built to connect cient, resulting in poor service delivery. In
key cities to stimulate domestic economic addition, budget reporting is very limited,
integration. This requires improving the and classification of expenditures is not
volume, predictability, timeliness, and homogeneous. Fiscal transfer mechanisms do
management of finances for infrastructure not sufficiently provide incentives for public
and maintenance, as well as harnessing the financial management improvement in local
potential additional mechanisms for revenue government, as fiscal transfers are not linked
generation. It also requires a systematic effort to performance in services delivery and
to adjust and implement existing reforms financial management, and current transfer
aimed at improving national and local govern- principles are not adequately needs-based.
ment management and oversight of resources, Therefore, strengthening public financial
along with a thorough review of existing management capability of municipal staff
local government support grants and their should be of continuous importance and
management. These efforts may substantially well-coordinated between the main stake-
contribute to help Haiti reap the benefits of holders, Ministry of Finance and Ministry
devolution and bringing services closer to of Interior and Local Authorities, to ensure
citizens, as well as addressing inequity.' harmonization of the PFM reform agenda
Public financial management (PFM) at between government agencies.
the subnational government level is vital Policy options should first focus on fixing
for successful decentralization. Financial inconsistencies and gaps in the institu-
management is an important competence for tional, regulatory, and financing framework
municipalities as “it enables local government for all municipalities. This means to first
to plan, mobilize, and use financial resources address the inconsistencies in devolution
in an efficient and effective manner, as well and decentralization so that functions
as fulfill its obligation to be accountable to its follow finances and basic minimum human
citizens” (Farvacque-Vitkovic and Kopanyi resources capacity is in place within subna-
2014). Effective devolution of key expen- tional entities. Second, it will be important
diture and revenue functions to municipal to review, revise, and strengthen the fiscal
governments has not taken place yet. Critical transfer systems in key areas, specifically
reforms first need to be implemented to addressing the gaps and inconsistencies in
enhance equalization and transparency the allocations, transfers, and monitoring of
in fiscal transfers, develop more dynamic the Local Government Development Fund
sources of local revenue, and strengthen (FGDCT). Third, the national government
: This chapter is based on the work conducted under two separate studies, one looking at municipal financing in Haïti as a
whole, and the other a case study analyzing the financial situation of six communes in the North Department (Municipal
Finance in Haïti [2017, working paper] and Diagnostic des communes de l’agglomérat du Cap-Haïtien [World Bank 2017, working
paper]). Please refer to Annex 2 for specific consideration and limitations regarding methodology and data.
164
[page 181]
should focus on boosting own-source revenue available can contribute to transparency and
collection, including expanding the registra- build long-term trust. À participatory process
tion of taxpayers, upgrading the cadastral that involves citizen from early planning
register, as well as revising the formulas for stages can ensure that actions respond to
distribution and allocation of taxes collected local needs.
at national level to increase transparency and In the following sections, this chapter
objectivity. In addition, it will be important reviews the state of municipal finances within
to support and enable better collaboration the current decentralization process and
between departments, communes, and the highlights key areas that need strengthening,
utilities to generate economies of scale in providing specific recommendations for
public service delivery. action in the short, medium, and long term.
Improved planning and accountability and
enhanced transparency can help increase THE PROCESS AND PROGRESS OF DECEN-
citizen confidence in local government. While TRALIZATION IN HAITI
urban local governments in general have been Urbanization in Haïti brought about two
better able to collect own-source revenue, significant challenges in local public invest-
the demand for services is also much more ment. The first is to improve the level of urban
expansive. In a context of high urbanization, infrastructure in cities to enable economic
the development and management of cities activities and reduce urban inequality. Over
play a decisive role in the development of the the past two decades, the gap between the
country. Unfortunately, local governments funding capacity of the country and the pace
struggle to provide adequate services due to of urban growth has led to a constant deficit
a chronic shortage of resources. At the local of urban infrastructure in towns and cities,
level, insufficient attention is paid to citizens” as covered in earlier chapters. The other
needs in the planning process, and account- challenge is to finance urban development to
ability and transparency in the use of public “keep pace with urban growth” as cities sprawl
funds are critically lacking. and expand in size and population. As shown
Scaling up upward and downward in Table 1 below, access to basic services
accountability can, in turn, improve local remains limited.
service provision in the long term. Building The Constitution of 1987, and its subse-
on lessons from local programs and projects quent 2012 amendment, anchors the decen-
that have managed to successfully respond tralization process in Haïti. In its preamble
to citizens can shed light on how to build and Articles 81, 83, 87, and 217 - which
the necessary systems for ensuring stronger explicitly outlines the autonomy of the local
accountability. Existing efforts to strengthen communes, the decentralization of public
the capacity of local governments to take services, and the establishment of a framework
charge of their development would need to be for local finances - Haïti laid down the basis
accompanied with efforts to bolster financial of decentralization. As part of the democratic
management, as well as capacity for internal reform process following the departure of the
monitoring and control. Further, efforts to Duvalier regime, the 1987 Constitution lays
make information on local finances publicly the foundation for good local governance
165
[page 182]
Table 1. ACCESS TO BASIC SERVICES COVERAGE RATES (2001-2012) (IN PERCENT)
INDICATOR NATIONAL URBAN RURAL
2001 2012 2001 2012 2001 2012
School-age children in school 78 90 84 93 74 87
Under-5 mortality (per 1°000 live births) 137.7 92 111.7 88 149.4 99
Children (12-23 months) fully vaccinated 33.5 45.2 33.6 2012 2001 2012
Access to improved drinking water sources
WHO definition * — 53 — 55 — 52
Access to tap water (in house) 7 11 13 18 3 5
Expanded definition ? — 73 — 91 un 56
Treated water purchased — 20 — 36 — 4
Access to energy © 32 36 62 63 11 11
Rate of open defecation 4 63 33 44 11 76 53
Access to improved sanitation ‘ — 31 — 48 — 16
Habitat, nonhazardous building materials 48 60 71 81 33 Ai
Sources: ECVH 2001; ECVMAS 2012; World Bank and ONPES (2014). Note: — = not available. WHO = World Health
Organization?
* According to the international definition (WHO), access to improved drinking water is the proportion of people using improved
drinking water sources: household connection, public standpipe, borehole, protected dug well, protected spring, rainwater.
? The expanded definition includes the international definition (WHO), plus treated water (purchased).
<Includes electricity, solar, and generators.
4 Rate of open defecation refers to the proportion of individuals who do not have access to improved or unimproved sanitation. This
indicator is part of the Millennium Development Goals (MDG) and is a key element of discussion for the post-2015 agenda. The open
defecation rate declined from 63 to 33 percent nationwide between 2000 and 2012, reflecting gains in both urban and rural areas.
° Improved sanitation is access to a flush toilet or an improved public or private latrine.générateurs.
2International WHO definitions used.
166
[page 183]
with an emphasis on bringing public services and 570 communal sections (Figure 1). There
closer to citizens. In moving forward with a are thus four administrative levels ofthe State.
decentralization process, the national govern- Three levels for the local authorities are set
ment recognized that good local governance out in the constitution and in the subsequent
could become an important avenue toward decrees: the department, the commune,
the revival of the national economy, as well as and the communal section. Executive and
for improving and expanding the provision of deliberative bodies, govern each body. In the
basic services. case of the communes (hereafter referred
To ensure the effectiveness of government interchangeably as local governments), it is
interventions, the 1987 Constitution and the important to note that the powers given to
laws? of the country organized Haiti in such them by the law are specified in title IIT of the
a way as to encourage and foster the partici- decrees, defining the operating and organizing
pation of local communities in public affairs. principles of the territorial collectivities. Each
As such, Haiti is a decentralized unitary state. commune has a municipal council (conseil
Article 61 of the 1987 Constitution defines municipal) consisting of three members
local and regional authorities at three levels: elected by the population of the commune for
the department, the commune, and the a four-year term. The municipal council is led
communal section (section communale). by a president - the mayor. Each commune
They are made up of deliberative organs (the has a municipal assembly (assemblée munic-
assemblies) and executive structures. These ipale) whose members assist the council in its
structures enable local governments to have work. Assembly members are also elected for
decision-making power and management four years.
autonomy. Since local governments are closer The Constitution aimed at building local
to communities than the national govern- and regional authorities as powerful instru-
ment, they are in the best position to decide ments for decentralization and with the
on the selection of projects to meet the devel- ultimate objective of improving the effec-
opmental objectives of the communes and tiveness of public service provision. By their
improve the well-being of their constituents. mandate and functions as stipulated in the
Às of 2017, Haiti has 10 departments, which Constitution, local and regional authori-
are further subdivided into 42 arrondisse- ties have a wide range of competencies and
ments4, 146 communes (6 communes have responsibilities in the provision of services
been added in the last 2 years, but are still (see Box 1 which outlines the main mandates
subject to clarification of their boundaries), of communes). They are created to contribute
5 For example, the law on the organization of communal sections (1996), the creation of the Management and Development
Fund of the Territorial Collectivities (FGDCT) (1996), the publication of the five decrees related to the charter of territorial
collectivities: Organization of the departments, organization of the communes, organization of the communal sections, and the
framework decree of decentralization (2006), and the creation of the Local Development and Land Use Planning Fund (2007).
4Arrondissements are group of municipalities. They have only administrative functions and most often are not well established
structures. They do not have any executive authority.
sDecree defining decentralization framework, as well as the organization and operating principles of the territorial collectivi-
ties, passed on February 1, 2006 and published by the official gazette Le Moniteur on June 14, 2006.
167
[page 184]
TERRITORIAL DIVISION OF HAITI
MN Departement Ÿ
Commune
M Section LC HE
« ÿ FY f1
D
Source: Author's elaboration.
to the improvement of the living conditions basic and vocational levels. In theory, they are
of the population at all levels. Local govern- empowered to collect taxes to finance their
ments are involved in several key areas of operations and investment projects. The legis-
service delivery, including: environmental lative framework also confers management
protection, land use planning, watershed and administrative autonomy to local author-
management, solid waste management, ities. Local and regional authorities also have
drinking water distribution, parks and recre- the ability to appoint individuals for positions
ations, and the safety of populations and at different levels of the state, in particular in
provision of education services at both the the local justice system.
As such, local and regional authorities have competencies to designate judges for the Justices of the Peace, the Courts of First
Instance, and those of the Courts of Appeal, while the councils of the commune sections are legally empowered to prepare
the list for members of a jury and ensure compliance with laws and regulations.
[page 185]
BOX 1 - FUEL PRICES POLICIES AND THEIR IMPLICATION ON CONNECTIVITY AND
HOUSEHOLDS' HABITS
Below, the key mandates for local governments included in the 1987 Constitution are summarized according
to the main functions.
Territorial Management: roadway construction; development and implementation of subdivision plan,
after approval of the supervisory authority; issuing building permits; issuing of compliance certificates; regula-
tion of urban traffic; designation, construction, and maintenance of the sites of railway stations and parking
lots; numbering of the houses, road signs, and naming of the streets; construction of public spaces; construc-
tion of recreational areas; construction of sanitation infrastructure.
Land Management and Registration: allocating plots and issuing operating titles related to the communal
property sector or the parts of the national land that have transferred management to their benefit; tax collec-
tion, taxes, tickets, and rights and royalties linked to real estate and land ownership.
Environmental and National Resource Management: sanitation and treatment of liquid pollutants; fight
against squalor and pollution; removal of solid waste.
Health and Hygiene: construction and participation to the management of first health level structures; imple-
mentation of hygiene service and sanitary police; inspection of food products’ quality; inspection of expiry date of
medicines; regulation and action taken regarding hygiene, squalor, and illness prevention; water quality control.
Education and Vocational Training: promotion of universal enrollment; localization, construction, and
involvement in the management of public secondary schools or high school; promotion of vocational and
technical schools.
Culture and Sports: construction and management of cultural, sports, and youth infrastructure; valoriza-
tion of historical, natural, archaeological, cultural, and artistic potential; promotion of cultural, sports, and
youth activities; construction and management of museums and libraries; management of sites and historic
monuments; creation of green spaces.
Civil Protection, Assistance, and Relief: contribution to the organization and relief management for the
benefit of vulnerable group and victims; management of asylums; management of public orphanages and
youth rehabilitation centers; participation to the organization of civil protection and firefighting.
Funeral Homes and Cemeteries: cemeteries development; issuance of exhumations permits; oversight
of compliance with regulation in terms of funeral operations and transfer of human remains; construction,
maintenance, and management of funeral homes.
Water and Electricity: production and distribution of drinking water; drilling and management of wells
and publics standpipes; development and implementation of the water supply scheme; management of energy
infrastructure; installation and management of the street lighting system.
Markets and Slaughterhouses: construction and regulation of markets, slaughterhouses, and slaughter
spaces; organization of fairs; management of municipal markets. Public Safety: participation in the municipal
security council.
Source: Authors’ elaboration based on the Constitution of Haïti, 1987. Source: Authors’ elaboration based on the Constitution
of Haiti, 1987.
169
[page 186]
While a decentralization framework limited own-source revenue mobilization
is in place, several obstacles still impede (even in large urban areas) contribute to
the effective devolution of competencies poor service delivery at the local level. The
and the implementation of public services second obstacle is related to the devolution
under a decentralized model. The first of competencies. While some progress has
obstacle is systemic and affects the delivery been made, the framework for devolution
of local services. Limited and unpredictable continues to feature contradictions and
financing, delays in central government overlaps in the existing legislation and in the
transfers, and the lack of transparency application of the existing mandates, leading
about the application of regulations for to confusion between ministries and local
the key national transfers combined with governments about financing and service
Figure 2.
9
83%
8%
7
5.9%
6% ”
3%
| 2.4%
2%
1%
EEE per
= œ “5 Lo = 2 Le} Le Le pe. PA
a 8 5 Si E} Es Ft Fi A =] 8
É c © O É] & =
A & Ô Si
s
sl
&
ë
(e]
M Local expenditure (as % of GDP) mm Average LAC
Sources: ECLA and World Bank.
170
[page 187]
Figure 3.
30% nl
24.0%
= 25 D
me
È
F2 18.0%
E
8 15%
&
&
ë 10%
ë
$
È 2.0% 2.0% 1.7%
0%
Colombia Brazil Panama Paraguay Haiti
Sources: ECLAC, MEF, DGI, and MICT.
delivery mandates. This means that devolu- vein, the share of revenue collected at the local
tion in some cases is not complete, or the level also remains low in Haïti compared to
related financing for a specific function is not other countries in the region.
transferred to the local governments, hence Despite the legal framework providing an
creating inefficiencies and unpredictability assignment of competencies between the
in the provision of services. central government and local government, the
In comparison with other countries in the delineation of responsibilities is not always
region, the relative share of expenditures and clear. Beyond the Constitution and other legal
resources spent at the decentralized level documents such as the organic law of the
remain limited in Haiti. Only 0.6 percent of General Tax Office (DGID) and the Ministry of
GDP is spent at the commune level, and total Economy and Finance (MEF), a series of five
municipal revenue makes up only 1.7 percent decrees from February 2006 cover important
of total revenues (see Figure 2 above and Figure aspects related to municipal resources
3 below). Participation of local governments and some legal prerogatives granted to the
is very small compared to other countries in commune” The five decrees lay the general
the region. Thus, urban local governments in and comprehensive legislative framework of
Haiti face massive constraints in addressing decentralization, along with the organization
increased service delivery demands in the and operating principles of the Haitian terri-
context of rapid urbanization. In similar a torial collectivities.
171
[page 188]
Lack of clarity in the current legal in the law and legal frameworks. De jure,
framework leads to confusion and overlap of municipalities are responsible for providing
responsibilities. According to the provisions basic services, but their weak planning and
of the Constitution and the 2006 decrees, financial capacity constrain them from
several areas of responsibility are being fulflling this function in its entirety. In most
shared by both levels of governments (central cases, the national government steps in and
and local). In some sectors, the delineation takes charge of these responsibilities. There
is clear, while in others, it is opaque. As are, however, some overlaps among agencies
highlighted earlier, local governments have a of the national government in the de jure
broad mandate, covering several sectors (see responsibilities. This creates deep coordina-
Box 1). In the organization of the territory, tion challenges, not only between national
the communes play a central role in land agencies, but also with international
property management, including markets, agencies and NGOSs that also enter the field
fairs, slaughterhouses, cemeteries, and to fill the void of service provision. Figure 4
trash-collection being the responsibility of below illustrates the point of duplication of
local governments. However, although the functions and institutional fragmentation
legal framework provides a broad definition using the water sector as an example.
of the roles and duties of local governments,
lack of clarity leaves room for broad inter-
pretation, and increases the risk of dupli-
cation of functions in some cases, and lack
of a leading actor in other instances (for
example, in the cases of the transport sector,
education, water, and sanitation). As a result,
both citizens and local and national authori-
ties do not have a clear understanding of the
responsibility and role of local governments
with regard to the delivery of services and
local economic development.
De jure, overlapping responsibilities
create confusion; de facto, limited local
capacity leads to local governments not
being able to meet their mandates in the
provision of public services. Responsibili-
ties overlap both in practice and as written
7 The five decrees included provisions for the organization of the various levels of local government: (i) Organization of the
departments, (ii) Organization of the communes, (iii) Organization of the communal sections, (iv) Territorial civil service,
and (v) provided a framework decree for decentralization.
SRefer “Le Moniteur” No 57 of Wednesday June 14 of 2006) and the one setting the organization and operation of the commune
(ref. “Le Moniteur” No 2 of 2006).
172
[page 189]
OVERLAPPING OF RESPONSIBILITIES IN WATER GOVERNANCE - NATIONAL,
DEPARTMENTAL, AND COMMUNAL LEVELS
Ù
> Z
z Ô Z u
5 & 64 a u
E 5 CA & LS
3 5 Z484852z É z à
3 Ÿ £a ob «y z © ©
[ec] mi E Z 5 zZ © =
M OO <Zs G<C <
œ Lu La QÉË=Z > z ©
un & nu Lz uu & ps E a Z
E: zkt< > ss œ | œ v
<é O& z Z zx =
NO 20 da SE n<Ss à à
0ZWZ GO aZOZz© © à
National CIAT Management of x
water resources
Ministry of Management of
Environment/ water resources
Ministry of Agriculture,
of Natural Resources,
and Rural Development
MARNDR Irrigation x x x x
DINEPA, Ministry of Drinking water and
Public Works, Transport sanitation services [1]
and Communications
Regional Regional Office for the Drinking water and
management of water sanitation services x x x x
and sanitation services
(OREPA) of the DINEPA
Departmental Unité Rurale Drinking water and
Departemental (URD) of sanitation x x
the DINEPA
Municipality Technical Operations Drinking water and
Center (CTE){1] for sanitation x x x
urban areas, “Comités
d’Approvisionnement
en Eau Potable et
Assainissemen”t (CAEPA)
and professional operators
(OP) for small towns
and denser rural areas,
“Comités de Point d'Eau”
(CPE) for rural areas
“Technicien en Eau Drinking water and
Potable et Assainissement sanitation x x
Communal” (TEPAC)
Irrigation association Irrigation x
[1] The 2009 Act gives DINEPA broad powers and responsibilities in the field of drinking water, through the
Ministry of Public Works: tariffs, water quality, licensing, monitoring and evaluation of water quality and system
performance, approval of infrastructure projects and mediation between contractors.
Source: Authors’ elaboration using information from Ryan Stoa (2015). Water Governance in Haïti: An Assessment of Laws
and Institutional Capacities. Available at: http://ecollections.law.fiu.edu/faculty_publications/97
173
[page 190]
INCOMPLETE DECENTRALIZATION AND A Lu . Lu
WEAK LEGAL FRAMEWORK FOR MUNICIPAL cighties, moving from building to actually
FINANCE CONFOUND RESPONSIBILITIES implementing à legal framework has been
difficult, leading to what today is an incomplete
À fragile and fragmented legal framework decentralization. Political instability under-
governs municipal finances in Haiti and mined the actual and full implementation
does not facilitate revenue collection by and enforcement of decentralization. In many
local governments. Municipal finance is cases, this has left local governments inactive,
governed by several laws and regulations, dysfunctional, and in some cases, without an
including, (i) the 1987 Constitution (and 2012 official mandate due to substantial delays in
amendment), (ii) a set of laws and Presiden- holding local elections. Furthermore, the lack
tial decrees including the organic law of the of both financial and human resources at the
General Tax Office (DGI), (iii) the organic local level have constrained implementation.
law of the Ministry of Economy and Finance Serious efforts from the central government
(MEF), (iv) several outdated tax legislations, to equip local governments with the tools and
as well as (v) a law creating the Local Govern- technical competencies they need to deliver
ment Development Fund (Fonds de Gestion et on their mandates have been limited and
de Développement des Collectivités Territoriales sporadic. In addition, the magnitude of central
[FGDCT]). Article 217 of the Constitution government transfers is marginal with respect
stipulates that “the finances of the Republic to the needs of local authorities, which affects
have two components: National Finance and their capacity to provide service delivery at the
Local Finance. They are managed by bodies local level. Estimates suggest that resource
and mechanisms provided for this purpose.” needs are at least five to eight times larger than
However, new rates and new sources of local existing transfers. In 2015, the per capita alloca-
taxation can only be created by Parliament, tion of the FDGCT ranged between USD 0.3
not by the Communes. Article 218 of the and USD 2.23 per capita among Haïit’s depart-
Constitution further contends that “no tax ments, compared to estimated needs of about
for the benefit of the State may be estab- USD 10 per capita, that would be required to
lished except by law. No charge, no taxation, bridge infrastructure gaps.
whether departmental, municipal, or Since their establishment in the 1987
communal, can be established only with the Constitution, local and regional authorities
consent of these Territorial Collectivities.” have never been fully operational in accor-
In the absence of a robust legal framework, dance with the law. Communal and depart-
municipalities are not empowered to substan- mental assemblies have never been constituted
tially increase their tax base, imposing new due to successive political and electoral crises
local taxes and enforcing collections. and lack of institutional capacity, thereby
The decentralization system mandated hindering accountability in local govern-
by the 1987 Constitution has never been fully ments. The election of new mayors in all
implemented due a combination of factors, communes in 2016 marks a new opportunity
including political instability, lack of resources, for decentralization in Haiti, which now
and complex political economy issues. Despite requires consolidation via the establishment
efforts on decentralization starting in the late of the communal sections to constitute the
174
[page 191]
councils (this is expected in 2017). These delib- decrees may have a positive contribution in the
erative authorities have the task of guiding the decentralization process moving forward, due
decisions of the executive authorities at the to the institutional innovations they bring to
level of the communal sections, communes, bear.? These decrees lay the foundations ofthe
and departments. Each level has its own three levels of local government by providing
executive and deliberative governing body, a clear definition of their mission, functions,
with each commune being ruled by a munic- and operations.
ipality. Members of the communal section Among the provisions introduced in
governing bodies, the Communal Council 2006 is the definition of the main sources of
(CASEC), the Communal Section Assembly funding for local governments. Articles 133
(ASEC), and the Municipal Council are all to 140 of the decree provide the framework
elected by popular vote. The rest of the local on decentralization and set out the various
government structures are elected indirectly. types of revenues for the territorial collec-
The Municipal Assembly is elected indirectly tivities: regular revenues and extraordinary
by the communal sections, and in turn, the revenues. The regular revenues include tax
Municipal Assembly elects the members of revenues, municipal royalties, user fees,
the Departmental Assembly. Further, the and central government transfers to the
Departmental Assembly selects, among its territorial collectivities. The extraordinary
members, three people to sit in the Depart- revenues include loan proceeds, temporary
mental Council. The Departmental Assembly or occasional revenues, grants, and public
also appoints one member to integrate the or private subsidies. Article 142 of the same
Inter-Departmental Council (CID), who decree grants to the commune competen-
participates in the Council of Ministers as an cies in terms of mobilization and collection
assistant in decentralization activities and of the property tax (CFPB), mobilization
represents the interests of the departments and collection of business tax receipts, and
and the communes. the creation of some duties and municipal
After the Constitution, the most important royalties. As to the decree on organization and
changes to the legal framework came with five functioning of the communes, Section V on
decrees in 2006. Since the 1987 Constitution, local finance (Articles 157 to 202) details the
few legislative improvements had been made general framework and mechanisms to ensure
for the implementation ofthe decentralization efficient management of municipal finance.
process until the introduction of five decrees Despite the steps taken by the 2006 decrees,
in February 2006. The five decrees focused on the current legal framework remains incom-
a framework for decentralization, organization plete and contains contradictory provisions
and functioning of communes, and provisions regarding decentralization of responsibilities.
for grants to communes. The 2006 decrees Most of the institutions and mechanisms
are considered an important breakthrough to proposed in the 2006 decrees have not been
improve the legal framework for decentraliza- established yet or their operation is still in
tion, and despite their imperfections, these early stages, so their effectiveness cannot yet
°E.g. refer Paul and Charles (2014).
175
[page 192]
be assessed. Further, to some extent the 2006 LIMITED SOURCES OF MUNICIPAL REVE-
decrees contradict certain provisions of the NUE HAMPER THE CAPACITY TO PROVIDE
Constitution regarding taxation, such as the SERVICES
creation of tax by municipalities. Local government financial resources
Effective decentralization of fiscal resources are limited with municipalities outside
remains the major impediment to effective of Port-au-Prince and surrounding cities
implementation of decentralization in Haiti. (Petionville and Delmas) being highly
The principle of fiscal and financial autonomy dependent on national transfers. Local
of the local government is stated in the 1987 governments in Haiti have four main
Constitution and its 2012 amendment, but sources of revenue: transfers from the
local communities lack resources that enable central government, mainly the Local
them to perform the functions entrusted Development Fund (FGDCT); taxes
to them by the legislation. This situation collected on behalf of the communes by the
is even worse in major cities (notably in National Tax Authority (DGI); duties and
Port-au-Prince and Cap-Haïtien) where local royalties collected by the communes; and
authorities lack resources to solve the serious other external sources of income, such as
infrastructure deficits (including housing, those from development partners. Apart
water and sanitation, drainage of waste water) from the three big cities in the metropolitan
and are unable to properly provide basic urban area, the majority of communes depend
services such as garbage collection or trans- heavily on the FGDCT as their main source
portation. Additional options for infrastruc- of income (typically ranging from 80-95
ture financing and the implementation of the percent), while other types of revenue
decentralization legal apparatus are needed to remain low (almost negligible). See Table
capitalize on the benefits of decentralization 2 below outlining the resource distribution
and bring services closer to citizens - and to between central and local governments.
address both spatial and social inequity. Taxes collected by the DGI are second
In a context of limited financial resources, in importance as a source of local revenue.
creation of new local government entities The agency is placed under the supervision
may lead to increased strain over resources. of the Ministry of Economy and Finance
The recent creation of new local government (MEF), which is entrusted with the govern-
entities needs to be carefully balanced to avoid ments fiscal policy. The operating mode of
misalignment with resourcing, further compli- DGl is governed by the decree of September
cating the implementation of the decentral- 28, 1987, which sets out in Article 2, among
ization framework. For local authorities to other things, the following powers: enforce-
be operational, they must have the human ment of tax laws and duty collection, as
resources and financial means to meet their well as other public revenues. DGI is the
needs. The recent creation of six additional authority that receives all tax income of the
communes without the necessary financial central government and territorial collec-
and human resource allocations is of concern, tivities and has administrative bodies that
and the additional breakup of entities that are allow it to collect local taxes established by
already small may create further inefficiencies. the law. These devolved bodies are the tax
176
[page 193]
RESOURCE DISTRIBUTION BETWEEN THE CENTRAL GOVERNMENT AND
THE COMMUNES (2014-15) MILLIONS OF HTG
TOTAL RESOURCES CENTRAL FGDCT DGI DUTIES & TOTAL
GOVERNMENT ROYALTIES
76,639 647 942 60 1,649
Source: Own figures based on data from the MEF, DGI and MICT.
centers that operate in the major towns of torate of the Treasury. Lack of inter-gov-
the departments and districts, and then the ernmental coordination leads often to
local tax agencies operating in small rural delays in the transfer of these tax receipts.
governments. In theory, the local taxes are Municipalities receive the total amount of
regularly transferred to the accounts of the property tax collected by the DGI and 80
local governments on behalf of which these percent of the total amount of Business Tax
collections were made. However, cumber- Receipt collected. Other local collections
some administrative procedures cause (for example, building permits, markets
delays in the release of funds collected fees, facilities rental, payments for use of
by DGI to local governments. In some cemeteries) are generated at the munic-
cases, delays can range from three to six ipality level with little transparency and
months, thereby negatively impacting accountability in the use of these proceeds
service delivery and daily operation of (see Table ). According to the Ministry of
the commune. There is an urgent need to Interior and Local Authorities, property tax
engage all stakeholders in identifying and accounts for about 86 percent of the total
removing the key administrative bottle- amount of revenue, while the business tax
necks, so that funds are released promptly (patentes) is 10 percent.
to municipalities. The concentration of economic activities
Even though overall tax collection in the metropolitan area of Port-au-Prince
remains under the control of the DGlI, is reflected in the large share of revenues
municipalities are responsible for collecting collected at this level. Data gathered from
local taxes and for negotiating the rules of the Directorate of the Treasury confirm
local transfers. Taxes collected by DGI are the dominant role of Port-au-Prince and
banked into temporary collection accounts its surrounding areas as the economic
at the central bank and then transferred to center of the country since 98 percent of the
the account of the commune at the national taxes collected by DGI for the communes
bank following authorization of the Direc- are concentrated in the Port-au-Prince
177
[page 194]
Table 3. MAIN REVENUES COLLECTED IN FY 2013 (HTG) AND LEGAL
REFERENCES
LEGAL TOTAL ANNUAL AMOUNT
TAXES REFERENCE COLLECTED
Property Tax April, 5 1979 287,450,480.00
Business Tax Receipt September, 28 1987 214,700,154.00
Building Numbering Permit February 18, 1971 235,257.00
Construction Permit April 5 1978
Setback Regulations August 10, 1961 1,016,963.00
Right of Way Regulations August 7, 1913 497,875.00
Cattle Sales Permit August 2, 1950 438,469.42
Materials and Commodities September 9, 1918 60,639.00
on the right of way
Tent Permit August 7, 1913 756,792.15
Taxe Calibration October 7, 1975 212,753.50
Burial Permit Septembre 28, 1938 1,199,868
Others 10,731,884.38
TOTAL 517,301,136.56
Source: DGI
178
[page 195]
metropolitan area. As depicted in Table DGI account for only 4 percent of total
4 below, the commune of Delmas has the revenues collection. Recent experiences
highest level of revenue collected by DGI with various donor-funded projects aimed
(dominated by the patente and CFPB with at mobilizing local revenues have shown
37 percent, followed by Petionville and that the communes could have increased
Port-au-Prince with 21 and 20 percent, the amount of property tax collected if they
respectively. Due to anemic economic had control of the collection process and
growth in the other regions and a limited received technical assistance to build local
local private sector, the amount of tax capacity. For instance, the municipality of
generated through the business tax receipts Carrefour had more than quadrupled their
remains limited outside of the metropol- revenue collection, from USD 309,000 in
itan area. Other local taxes collected by 2011 to USD 1.8 million in 2012.1°
REVENUES COLLECTED BY DGI ON BEHALF OF COMMUNES IN THE
METROPOLITAN AREA OF PORT-AU-PRINCE (IN HTG), OCTOBER Table 4.
2013-MARCH 2015
TOTAL
Deimas 264,280,509.89
Petionville 149,189,782.23 37%
Port-au-Prince 142,013,642.25 21%
Tabarre 64,411,172.31 20%
Carrefour 36,687,347.95 9%
Cité Soleil 27,786,339.02 5%
Croix-des-Bouquets 14,732,771.62 4%
Total 699,101,565.27 2%
Source: MEF. 98%
#USAID Fact Sheet: Revenue Collection Provides Opportunity. One of the projects is Lokal+ financed by USAID. The project
was designed to improve local governance and support the decentralization process in Haiti by strengthening the capacity
and transparency of local governments and improving their ability to provide goods and services to their communities
179
[page 196]
Municipalities often only collect a fraction 15 percent being transfers from DGI from
of potential revenues, and they lack the revenues collected on behalf of communes.
required capacity to effectively use resources However, in FY 2015 FGDCT annual alloca-
for the delivery of local services. Except for tion ranged from a mere 22 HTG or USD
the municipalities in the metropolitan area, 0.33 per capita in the metropolitan area to
more than eighty percent of the overall 163 HTG (around USD 2.60) in the North-
revenue of local governments come from West Department. At the same time (FY15),
central government transfers, whereas on total tax revenues for the country’'s 140
average only about five percent of revenue municipalities totaled only 1,250 million
were own-source revenue collected by HTG - roughly USD 20.1 million. About 93
communes themselves with the remaining percent of this amount (1,166,000,000 HTG)
Figure 5.
500,000,000.00 LR
400,000,000.00 5
pl ü
& à
& 300,000,000.00
È a ss
ë $ _&
s« 200,000,000.00 _ El =
Te e & : D sa
CS 5 $ FI à D ss
100,000,000.00 rs
ès F ê&
S $
0.00
CC
a 8 + Ou 5 a
Si = =
[e]
Ô
Municipalities
Sources: MICT, PRAFIPUM.
# Exchange rate on 1/1/2015 was 46.86 HTG:USD 1
180
[page 197]
BOX 2 - EXAMPLE OF REVENUE COLLECTION IN ACUL DU NORD IN THE NORTHERN
DEPARTMENT, 2013-2016 (IN HTG)
REVENUE 2013-14 2014-15 2015-16
Property tax (CFPB) 97,378 180,797 139,884
Business tax (Patente) 1704 1120 2952
Total amount received from DGI (CFPB+ Patente) 123,822 213,167 197,736
Transfer from central government (FGDCT) 5,713,875 5,713,875 5,713,875
Extraordinary or ad hoc Transfers 285,000 175,000 510,000
Revenue collected by the commune 347,163 436,050 293,925
Totalrevenues 6,568,942 6,720,009 6,858,372
As seen in the table, annual central government transfers account for about 90 percent of the commune total
revenues for the three years covered, and overall revenue remains limited in volume (around USD 105,000). The
share of central transfers as share of total commune revenue declined slightly from 87 percent in FY 2014 to 85
percent in FY 15 and 83 percent in FY16. Revenue collected directly by the commune increased from HTG 347,163
(about USD 5,500) in tFY 14 to HTG 436,050 (about USD 6,900) in FY 15, but declined in FY 16 to stand at HTG
293,925 (around USD 4,600). There is not enough data to identify the reason behind this decline, but the fluctua-
tion may have highlighted the existence of untapped revenue potential.
Revenue generated from the business tax remained limited, representing less than 1 percent of total revenue.
This may be the result of the limited economic opportunity in the commune, but may also highlight a deeper
issue: the low level of voluntary tax compliance. Property tax, which is usually a leading source of municipal
revenue, is also limited in the commune of Acul du Nord, with a value ranging from 1.45 to 3 percent of the total
revenue of the commune.
[page 198]
is collected by only 10 municipalities, while manner to finance current and capital expen-
the other 130 communes collected only 7 ditures. The amount allocated for opera-
percent of these resources, about 83.3 million tional expenditures represent an estimated 15
HTG (See Figure 5). In other words, average to 20 percent of its total transfers. In the case
annual tax revenue for a municipality among of project funding, in the FGDCT budget
the rural and small communes is only 641,180 there is an amount of around 671 million
HTG (or about USD 10,100), which is about HTG whose distribution is the responsibility
53,432 HTG per month (approximately USD of the MICT. There are great differences in
847). It is worth noting that this amount is the allocations provided to communes across
insufficient to cover the salary of two mayors regions, and across rural and urban areas. In
of a municipality of that size. Limited collec- FY 2015, the average FGDCT allocation was
tion capacity of municipalities is reflected about 59 gourdes (or USD 1) ranging from a
in collection levels with own-source revenue mere 22 HTG per capita (or USD 0.35) in the
highly concentrated in major cities. The five metropolitan area to 163 HTG (USD 2.6) in
communes of the Port-au-Prince metropol- the North-West Department. Similarly, the
itan area collect more than 80 percent of all northeastern department receives four times
the Haitian communes’ own resources. more resources than the Artibonite depart-
To further illustrate the ranges of revenues ment.
available for most local governments in Haiti Finally, several local governments also
outside of Port-au-Prince and a few other benefit from external support for local
major cities, a detailed example is provided development. Municipal governments are
in Box 2 below. Box 2 shows the trends in eligible to receive funds from various sources
revenue collection, indicating the overall including, from international cooperation.
reliance on national transfers, the low and Some local governments have either direct
unexploited level of local revenue collection collaboration with NGOSs and partner cities
(around 4 percent of total revenues), and (such as in France) or are benefitting from
the insufficient level of overall volumes of support through donor financed projects on
financing available to enable communes to local development, local governance, and
deliver services. It also provides the trend in infrastructure, among others. In general,
revenue collection for a small municipality these programs do not transfer resources
in the Northern Region with a population directly to the communes but instead have
of about 55,000 people, predominantly rural used a principle of delegated implementa-
(76 percent of the population is estimated to tion, often with NGOs, due to the limited
reside in rural areas). capacity of the local governments (for
Municipalities also receive other support example, in the case of the World Bank-fi-
through central government transfers and nanced projects PRODEP and PRODEPUR).
grants. This includes subsidies and miscella- The support can be both in the form of
neous grants for financing local government financial assistance for service delivery, as
spending. As highlighted above, the national well as technical assistance and capacity
government through MICT provides regular building in various areas (including revenue
transfers to communes in a discretionary mobilization, financial management, devel-
182
[page 199]
opment planning, etc.). In 2016, there were at Taxes collected on behalf of the communes
least seven agencies working on local devel- by DGI
opment support, including but not limited The Haitian law identifies taxes under the
to: the Canadian International Development responsibility ofcommunes - a total of 10 taxes
Agency (CIDA), the United States Agency with property taxes and business licenses as
for International Development (USAID), the most important ones!?. Nevertheless, the
the African Development Bank (AFD), the communes are not collection agents (it is
European Union, the United Nations Stabi- DGD) nor do they have provisions to set the
lization Mission in Haiti (MINUSTHA), the tax rate which falls under the authority of the
National Democratic Institute (USA), and central government.
Initiative Développement (France). Property tax and business licenses
The volume of financing from develop- account for almost all own-source revenue
ment partners varies substantially, but in collected. The only taxes with weight from
general, local development programs have a quantitative standpoint are property taxes
not been national, but rather applied a and business licenses, which account for
regional or departmental focus or covered 98.1 percent of total collection (62.5 percent
limited technical areas. For example, there of property tax and 35.6 percent of business
are several specific support programs licenses) for FY13. À survey of the built
targeting revenue collection, including environment (see Figure 6 below) carried
LOKAL+ (USAID), which covers about nine out by MICT in 2015 has identified twenty
communes for collection of local revenue. communes with high potential to increase
Similarly, a program supported by CIDA short-term revenue derived from CFPB.
targets the Palme region. In general, most of There has been a significant increase of
the programs are oriented towards capacity collection in recent years, albeit from low levels,
building and have more limited financing and mainly in the communes ofthe larger cities
available for capital investments. However, (particularly in the Port-au-Prince agglomerate).
because of the fragmentation of efforts, it is Overall own-source revenue collection levels
difficult to obtain a more precise estimate almost doubled from 517 million HTG for the
of the level of financing provided to local year 2010-11 to 757 million HTG (2012-13) and
governments through these channels. Going 942 million HTG for the year 2014-15.
forward, and with the commitments of the There are vast differences in collection
recently installed government, it is expected levels between predominantly urban and rural
that more development partners will engage areas. In the Port-au-Prince metropolitan area
or re-engage on decentralization and local and Nippes, the share of revenue of business
government support, in combination with licenses reaches 35 percent of the total, but
support for the reconstruction efforts in the for the rest of the country it is not higher than
Grande Anse, following damage caused by 20 percent of the total (see Figure 7). On the
the Hurricane Matthew in 2016. other hand, outside Port-au-Prince, the CFPB
# Property taxes, business licenses, livestock certificate of sales, alignment duties, calibration, cemetery plots, wreck tax /sale,
small shop, arbor, ajoupa, character reference, and tax on materials and food products on public road.
183
[page 200]
Figure 6.
2, CO
180,000
& 160,000 E
$ 140,000
à 120,000 []
È l
S 100,000
È
S 80,000 - - l I
[A
60,000
00 RER
PS LEREERERERERERENENE
o RRRRRRRRRRRRERERENR
8 8 3 2 8 L £ Le dE 8 2 £ # 8 8 ? £ 2 8
o 2 8 à El E > à E À > = ©
ARSSÉEGS EË 8 2 À Se < à à 8
& 0 5 0 à À LA ii Es LS € À
à Ÿ D à SA £ £ à b J $
en £ Ê 4 A ©
Ê S À €
Ê ä
en
Sources: MICT, PRAFIPUM. Municipalities
accounts for 80 percent of collection. Never- to increase their revenue collection levels. The
theless, it should be noted that these percent- collection level in the Port-au-Prince metro-
ages are strongly influenced by the situation of politan area is not comparable to any of the
the Port-au-Prince metropolitan area, where 81 other regions. The data shows that there are
percent of the total is collected with 22 percent real possibilities to increase revenues in most
of the population. Four departments: Wes of the country's departments. For example,
f th lat F d t ts: West f th t d t ts. F
(including the metropolitan area of Port-au- the differences in collection of revenue per
Prince), the South, the North, and Artibonite. capita between the Nippes and South regions
e analysis of municipal revenues per are almost a factor o , yet their level o
Th ly: f pal P il t a fact f fifty, yet their level of
capita (Figure 8) demonstrates the vast differ- development does not explain this situation.
ences in collection levels between depart- Hence, there is ample opportunity to expand
ments, and the potential for emerging cities the revenue collection levels in Nippes.
184
[page 201]
TAXES COLLECTED BY DGI BY DEPARTMENT (FY 2012-13)
100% =. LL din = os
3,3 2,4 LU. . Hi — ”
6, 8,3 - ke 7,2
90% 3 s 2414,0 * Do 90
EMEA ARELE
O, u 6:
80% À VI 43 RER 565]
ERRENRERENEERH
MERE
MERE
50%
40% mn D8, 60! 5
ERRESERM F
30% SR 4
ERERENENELES
20%
MERE RENENENE
MERE
2 a a A A 2 L 8 TZ B 8 TS
É È 8 El À Ë 8 É Ë 5 à. 5
< a © Le) T e] & del À JE er
5 Ô 5 3 8 () à Z
Ê] E Z œ El D
S © < s
Ô Z a
[e]
en
M Property Taxes M Business Licenses M Other Taxes
Sources: MICT, PRAFIPUM.
Finally, it is important to provide further government action program for PFM reforms.
information on the legal framework and the À short presentation of the constraints and
current application of the property tax system key issues associated with the current tax
in Haiti, given its relative importance for local regime is presented below. The government
revenue. The ambiguity of the framework and should consider a review of the current law
application of the code and regulations for and the way it is applied in a selected number
property tax is likely to increase the risks of of communes. This review could then inform
losses and inefficiencies in revenue collection, further actions to be taken to make the
and therefore requires attention as part of a property tax system function more effectively.
[page 202]
REVENUE COLLECTED BY DGI BY INDIVIDUAL AND BY DEPARTMENT
IN GOURDES (2012-13)
300 nl
250 = D
200 = mn
150 = mn
100 == EE
50 = mel
Le QE
E 8 5 & SO À 8 $ à »< À À
ä © à 2 OS n À SO à zx à
É = a 5 g 2
en
n
Lo)
=
LA
Source: Authors’ figures based on MICT, DGI, and IHSI.
Note: The data from the five Port-au-Prince communes are not included. The amount from the Nippes department is so small
that it does not appear on the graph.
[page 203]
BOX 3 - PROPERTY TAX IN HAITI — THE CONTRIBUTION FONCIÈRE DES PROPRIÉTÉS
BÂTIES (CFPB)
The CFPB is the leading source of the municipalities’ own resources collected by the General Tax Office
(DGH1). It is therefore important to understand its main characteristics and limitations.
According to Article 1 of the Decree of 1979 on property tax5, the Contribution Foncière des Propriétés
Bâties “is a real municipal tax calculated on the rental value of a building. The rental value is the price at
which the immovable property is rented or the one to which it can be rented.” In most countries, this tax is
computed per the estimated market value of the builtproperties and not based on its rental value. The levy on
the rental value is similar to a tax on income derived from renting the property, rather than a tax on capital.
Another limitation of the CFPB is that it is restricted to the built environment and not extended to all proper-
ties, whether built or not. Thus, this tax leaves out empty lots, which are great source of municipal revenue in
other countries. Furthermore, the Article is not clear in terms of the calculation of the rental value and provides
a lot of ambiguity.
The 1979 Decree proposes to calculate rental value in cases where the property is not rented as 3 percent of
the value of the property (about 0.25 percent per month). Compared to international practices where rental
values vary in the range of 4 to 6 percent, this percentage is very low in a country with limited housing stock.
Article 1 also states that the CFPB is a communal tax even though it is set at the national level by the central
government. In practice, this means that the revenue collected is transferred to the municipality.
The decree also defines a series of rebates (deductions) related to the policy of urbanization and others that
are not clear. In all cases the deductions are high and, in general, these types of deductions create risks for graft
and accumulation of tax arrears. Articles 5, 6, 9, and 10 are relevant examples:
— Article 5: Any new construction of buildings in cities other than Port-au-Prince and Pétionville will benefit
from a tax deduction of the CFPB over four years until full tax payment is required
— Article 6: Furnished apartment buildings will benefit from a deduction of the CFPB in proportion to the
value of the furniture with deduction not to exceed the third of the annual amount of the tax owed.
— Article 9: Exceptionally, any building with multiple apartments (housing units) rented will benefit from a
reduction of the CFPB in the order of fifty percent if these apartments are rented furnished and thirty percent
if they are rented unfurnished. Under the terms of this decree, the word “apartment” means a unit comprising
at least one bedroom, a dining room, and a bathroom.
— Article 9: Buildings erected in industrial parks, designed to serve as a place for industrial or artisanal
operations, will benefit from total CFPB exemption for the first year of operation and a gradual one for subse-
quent years, based on the location of industry with different exemptions for industries inside and outside the
metropolitan areas (up to 21 years’ exemption and deductions)
— Article 10: buildings belonging to entities are exempt from the CFPB: The State and the communes,
religious institutions and nonprofit associations, the Catholic Church or other religious groups recognized by
the State and not producing income, and non-income producing congregations, unions, or cultural associations.
3 Article 1 of the Decree published in the official journal Le Moniteur, No. 32-A, April 19, 1979.
187
[page 204]
Taxes collected by the communes The duties and royalties represent a tax
The third source of income for the type that is not fully institutionalized, lack
communes are revenues generated from duties control and oversight, and is characterized
and royalties, collected by the communes by limited transparency and accountability.
themselves. The duties and royalties are There are multiple duties and royalties in the
set by the municipalities and constitute an various municipalities of the country. In the
uncertain source of revenue. In this case, the case of six northern communes, reviewed in
statistical information is not aggregated in the case study prepared for this report, a total
financial reporting or at the central level and of 25 duties and royalties have been identi-
must be found in each commune. fied. Often, these taxes are not collected or
Figure 9.
23 C2 CP
u 26.3%
25%
18.7%
20%
16.4%
u 12.8%
10% _
7.0%
53% ,
. u 4.4%
5%
> 3.0% 1.7%
0%
s 2 ÆE D ne) E ‘& El
c ES à É &
(e] 2 pe! 5
[es] E] Ô
_
[1
5
fs]
©
A
Source: ECLAC.
4The six communes covered in the study are Cap Haitian, Limonade, Quartier Morin, Acul du Nord, Plain de Nord, and Milot.
188
[page 205]
only at a minimal level. The most common tory framework that the country is unable to
duties and royalties according to the survey attain yet. Às can be seen in Figure 9, relative
undertaken in the six communes of Cap-Hai- to the region, the participation of municipali-
tian are the following: construction permits, ties in government expenditures is very small
burial permits, garbage collection charges, in Haiti.
advertising, and certificates of attestation. Regarding Haitian budgetary planning,
The relative importance of duties and it is done based on the distinction between
fees have been low, but in recent years, it operating expenditures and capital expendi-
appears that the level of revenue generated tures. In the case of the budget of the central
from these sources has increased, and may government, the share of operating expen-
potentially continue to do so. Estimates made ditures is estimated at around 76 percent
by MICT indicate that this source is used in and the capital expenditures at around 24
various ways depending on the municipality percent. Wages constitute 40 percent of
considered, and it represents in the national total spending. MICT does not have aggre-
total a value fluctuating around four percent gated data on the distribution of municipal
of the total resources of the municipali- expenditures, although it is estimated that
ties. However, the estimate of four percent operating expenditures represent between 60
is only representative of the smaller and and 70 percent of the total. In the distribu-
rural communes, i.e. Type 3. In department tion of resource programming from FGCDT
capitals and in the metropolitan area of Port for fiscal year 2014-15, 846 million HTG is
au Prince, it appears that these resources allocated for municipalities and communal
have become increasingly important over the sections’ operations, and 670 million HTG
past few years. In the case of Cap-Haïtien, for for projects’ funding (i.e., approximately 56
example, duties and fees comprised almost percent for operating expenditures and 44
thirty percent of the commune resources over percent for capital expenditures). Unfortu-
the period of 2013-16. nately, there was no information available
concerning actual expenditure. However, in
Local government expenditures and the Cap-Haïtien agglomerate, the expendi-
controls ture distribution across the six communes
Spending of local governments remains at covered in the study is very different (see
levels considerably lower than those of other Figure 10) - on average, the capital expendi-
Latin American countries. The spending of tures represent only 20.6 percent of the total
the territorial collectivities represents only spending. If we differentiate between the
3 percent of total public spending, with, 2.7 Cap-Haïtien commune and the five other
percent being at communes’ level and 0.3 smaller, less urbanized communes, one
percent at the municipal sections. From observes different results as evidenced in
this purely quantitative standpoint, it is the figure. Given the data available (absent
obvious that the decentralization process expenditure data at the national level), it is
in Haiti is very weak in connection to the likely that the actual distribution across the
rest of the countries of the continent. This country is closer to the levels seen in the
situation coexists with an ambitious regula- region of Cap-Haïtien.
189
[page 206]
Figure 10.
100%
90%
80%
70%
60%
50%
40%
30%
20%
334% 20.6%
10% ELLE sl
93%
RE |
Cap-Haitien Other Five Municipalities Total
D Investment Operating Expenses
Source: Municipalities’ accounting department.
LACK OF TRANSPARENCY AND LIMITED and the law of May 28, 1996 constitutes
RELIABILITY OF THE TRANSFER SYSTEMS the legal basis for fiscal transfers from the
EXACERBATE FINANCIAL CONSTRAINTS central government to municipalities. The
Challenges from high dependency FGDCT was created to facilitate access by
from transfers are exacerbated by lack local and regional authorities to financial
of transparency and limited reliability resources that can enable their develop-
of the existing transfer system. In Haiti, ment. The law established the fund, its
the decentralization framework decree of funding sources, and its management
February 1, 2006, the law of August 20, 1996 structure. The framework decree calls for
on the Local Government Development ordinary and extraordinary fiscal transfers,
Fund (Le Fonds de Gestion et de Développe- but the modalities of these transfers are
ment des Collectivités Territoriales [FGDCT]), not well-defined, nor are they publicized
190
[page 207]
on a regular basis, and statistics on actual accordance with the provisions of the law, and
transfers from the central government to the management of the FGDCT is therefore
communes remain limited and opaque. the de facto responsibility of the MICT.
Further, the management of FGDCT is not The allocation and disbursement of central
fully in compliance with the legal framework, transfers is not implemented in full accor-
and the overall level of fund mobilization dance with existing regulations. Only half
could be improved. According to the legal of the funds designated for the communes
framework, the fund management board are transferred, and a significant share of
is composed of the three members of the funds is transferred to structures that are not
Inter-departmental Council, assisted by a active. The amount of the FGDCT disburse-
representative of the MEF, a representative ment foreseen for the 2014-15 budget was
of the Ministry of Planning, and a represen- 2,300,293,375 HTG (around USD 37 million).
tative of MICT. The objective of the fund is to Given that total internal revenues anticipated
ensure the efficient functioning of the terri- in the FY15 budget was 60,130,190,000 HTG,
torial authorities. According to the law, this it appears that fund disbursement represents
fund is financed by tax collections by DGI only 3.8 percent of the total internal revenues
on a series of products or activities: sale of of the central government. Out of the total
cigarettes, insurance premiums, international expenditure forecast of the FGDCT, only
phone calls, customs invoices, international 1,129,501,955 HTG (49.1 percent) are directly
travel ticket purchases, tax withholding on assigned to the territorial collectivity bodies
payroll, withholding of net taxable income of as specified in the law (see Table 5). It is
any taxpayer, tax withholding on lottery wins worth noting that 170,130,000 HTG (around
and other games.!$ These levies are designed USD 2.7 million) are assigned to bodies that
to finance operations of five local govern- have not been functioning for several years
ment bodies specifically mentioned by the or have never existed (the interdepartmental
law: organization of meetings of the territorial council, which is assigned HTG 6,000,000).
collectivities, communal sections (CASEC), The basis for allocating central govern-
municipalities/communes, the departmental ment transfers needs review. Lack of
councils, and the interdepartmental council. predictability in central government
Out of the five bodies, there is one that has transfers impedes on planning, budgeting,
never been created to date (the interde- and service delivery in local government.
partmental council), and two that are not FGDCT allocations to local governments are
operational (the assemblies of the territorial disbursed monthly and are used primarily to
collectivities and the departmental councils). cover operational costs (63 percent). Salary
This means that, currently, the management accounted for 76 percent of the operational
board of the FGDCT is not established in costs. Only 23 percent of the fund expendi-
: As the 1996 law prescribed, the FGDCT resources come from (a) 20 percent of the cigarette tax, (b) 5 percent of the tax on
insurance policies, (c) 8 HTG per international mobile telephone call, (d) 2 percent of the customs tax (with some excep-
tions), (e) 25 HTG per international airplane ticket, (f) 1 percent of the income tax on salaries greater than 5,000 HTG, (g) 1
percent of the net revenue from all taxpayers, and (h) 5 percent of the winnings from lotteries and other games.
191
[page 208]
Table 5. DISTRIBUTION OF THE FGDCT ALLOCATIONS
LINE AMOUNT (HTG) AMOUNT (USD)
Expenditures of the bodies of the territorial collectivities 1,129,501,955 18,217,773
Support to current expenditures 77,000,000 1,241,935
Project funding 699,891,420 11,288,571
Subsidies to territorial collectivities association 40,500,000 653,226
Other expenditures 267,000,000 4,306,452
Other bodies 86,400,000 1,393,548
Total 2,300,293,375 37,101,506
Source: National Budget 2014-15. Supplementary Documents.
tures were spent on investment projects (see of the fund and transform it into an effective
Table 6). In the absence of the interdepart- fiscal transfer mechanism to finance service
mental council, allocations decisions rest delivery at the local level.
solely with the central government through Lack of prudent, effective, and efficient
the MICT, without consultations with local financial management of the local govern-
governments. In theory, 40 percent of funds ments meager resources further impedes
in the FGDCT are earmarked for capital service delivery provision. In most
investments, but there is no clear guidance communes, the budget lacks credibility, as
and criteria for the selection of these projects. it is considered more as a legal requirement
According to data received from the Ministry to receive funds from the central govern-
of Interior, average total central government ment rather than a management tool. This
transfers to local government for all 140 has usually resulted in poor expenditure
municipalities are estimated to be less than controls, inadequate reporting, and an
600 million HTG. This amount is grossly incentive to spend the budget allocation as
insufficient to cover the costs of operation of soon as possible, thus lacking focus on actual
local government, let alone provide needed service delivery. As such, revenue forecasting
financial resources to invest in local infra- is not realistic and expenditures often
structure. There exists a window of opportu- exceed revenue collection by more than ten
nity to review current management practices percent, leaving some communes in a state
192
[page 209]
DISTRIBUTION OF FGDCT EXPENDITURE IN 2015-16 (FY), IN HTG Table 6.
OVERALL EXPENDITURE
CATEGORY CATEGORY AMOUNTS TOTAL TOTAL (USD)
Operations Cost Salary 891,716,950 1,161,551,950 18,405,720
Rent 31,800,000
Commune 77,425,000
Holidays
(Patronales)
Other Subsidies 160,610,000
Capital Projects 415,005,663 415,005,663 6,576,097
Expenditure
Others Recurrent Costs 67,000,000 260,899,400 4,134,160
Subsidies to May- 38,500,000
ors Associations
Others 155,399,400
Totals 1,837,457,018 29,115,976
Source: MICT.
of continuously accumulating payments lack of external controls increases the risks
arrears to service providers. In addition, for accountability gaps and potential misuse
salary and other fixed administrative costs of funds.
dominate the expenditure patterns of local The government has recognized the gaps,
governments. While some monthly financial and fiscal decentralization is an important
reporting is required by law, municipalities part of the government’s reform program
do not produce annual financial reports and on public financial management (PFM).
the Cour Supérieure des Comptes (Supreme If implemented effectively, this program
Audit Institution) lacks both the financial could help the government in addressing
and human resources capacity to carry out some of the key deficits. Since May 2014, the
annual audits of the 146 communes. This government has developed a comprehen-
193
[page 210]
. . A PATH TO STRENGTHENING MUNICIPAL
sive PEM reform strategy and action plan,
; ; Lo FINANCES
organized around six main pillars related to
budget management, treasurÿy management, There is a clear need to strengthen
internal and external controls, revenue municipal finances for cities to be able to
mobilization, financial decentralization, and close the urban infrastructure and services
financial information systems. The vision gap, as well as to accommodate the growing
of the PEM reform strategy is to ensure a urban population. As detailed in Chapters 1,
public finance system that promotes trans- 2, and 3, Haïitian cities are marked by high
parency, accountability, fiscal discipline, deficits of basic services, including supply
and efficiency in the management and use of of water, sanitation, waste collection, and
public resources for improved service delivery electricity. Poor city management is another
and economic development. The program defining feature, which negatively impacts the
aims at increasing revenue from taxes and way urban areas are expanding, since local
tariffs, thus increasing the autonomy of local governments are insufficiently equipped to
government entities in decision-making as guide growth away from crowding and toward
well. During this period, important regula- “healthy” and productive densities. Based on
tory measures have also been implemented the review of municipal finances in Haiti,
to improve financial management at the this section offers a set of priority measures
local government level, such as standardiza- to mitigate the identified shortcomings
tion of accounting processes in local govern- described above.
ment, regulation of communal own-source Despite efforts by the government to
revenue collection, review and amendment address fiscal decentralization in the broader
of the local finance law, creation of an inter- PEM reform action plan, many weaknesses in
communal fund, etc. The implementation local government PEM remain. The Govern-
of a fiscal decentralization action plan has ment will need to review the existing roadmap
not progressed at the desired pace due to for reforms to address PEM at the local level,
a combination of financial, logistical, and including prioritizing areas that see limited
human resources issues, as well as the period progress, as well as potentially reconfig-
of transition in 2015-2016. Therefore, to date, uring and updating the existing roadmap
Haiti has made limited progress in terms of by considering the progress made in some
increasing fiscal and financial autonomy of areas. In addition, it is imperative to review
local government entities. the existing legal and regulatory framework
to clarify the roles and responsibilities of
each level of government for the delivery of
services and the provision of infrastructure
at the local level and to set out actions to
address weaknesses in systems, capacities,
26 PMAC - Programme de Modernisation des Administrations Locales. This is a program conceived by MICT and currently
under implementation.
194
[page 211]
incentives, and accountability that currently tax) is obsolete and outdated, and therefore
impede service delivery. Since intergovern- impedes the capacity of municipalities to
mental transfers (particularly the FGDCT) increase revenue collections. À key require-
have not been based on a transparent formula ment for improved local service delivery
and clear objectives and criteria, the govern- is that local governments receive greater
ment should consider reviewing the existing funding for basic service provision. In turn,
regulatory framework for the FGDCT and this means that all local governments have
develop a framework for financing local basic budgeting, accounting, reporting, and
government provision of services and infra- procurement functions in place so that they
structure. This should include outlining the can effectively use this funding to improve
principles for strengthening the management service delivery. Increased funding must also
and operations of FGDCT and considering go hand-in-hand with improved account-
other options (such as additional grants) ability for the use of funds. Therefore, a
that need to be put in place to adequately review and clarification of the current local
finance local service delivery. Finally, it is finance legislation in Haiti could pave the
advisable to strengthen the PMACH in order road for boosting tax collection.
to provide a human resources framework for
local governments that articulates a set of Consolidate, harmonize, and enforce the
principles, systems, and practices that should legal and regulatory framework for munic-
be developed and followed to ensure that local ipal financing
governments are adequately staffed. Haitïs urban development is taking
À more efficient, accountable, transparent, place under a context of incomplete decen-
and fiscally responsible decentralization tralization and an unclear legal framework
system will need municipalities with stronger for municipal financing. The basis for the
and broader sources of own revenue. There effective implementation of decentraliza-
is a lack of significant revenue autonomy at tion, one that provides clarity of roles and
the municipal level and a large dependency resources, is a strong legal and regulatory
on central government transfers. However, framework. Three main courses of action
evidence suggests that current levels of have been identified. First, it is necessary to
transfers remain extremely inadequate given review the normative framework of the terri-
the broad responsibilities of municipalities. torial collectivities as established in the five
This creates a situation whereby local author- decrees of 2006 and identify possible actions
ities are held responsible by their constitu- for implementation. Second, the govern-
ents for mandates that are not adequately ment must formalize the taxation functions
funded. Legislation and administrative and responsibilities entrusted to the munic-
requirements underpinning the collection of ipalities as stipulated in Article 142 of the
municipal taxes (property tax and business decentralization framework.” Thirdly, there
‘ Framework for decentralization passed in 2006. Article 142 of the same decree grants to the commune competencies in terms
of mobilization and collection of the CFPB, participation in the mobilization and follow-up on business licenses, and the
creation of some duties and municipal royalties.
195
[page 212]
is an urgent need to undertake a review of to advocate for a special law on local finance
key legislation and regulations, particularly and measures to increase tax and non-tax
those related to property tax and business revenues, accruing to local government.
tax (for example, address the issues around In addition, the government is currently
rate setting and the fact that many of the tax piloting a series of programs designed to
rates are outdated and not in line with current strengthen administrative decentralization
market trends). Together, these actions seek (such as PMAC [Programme de Modernisation
to clarify the responsibilities, systems, incen- des Administrations Locales]) and enhance
tives, and accountability relationships for revenue collection at the communal level.
the delivery of services, the financing needed
for services, and the capacity of local govern- Strengthen the system for municipal finance
ments to effectively use increased funding, and expand financing opportunities
and so lead to improved service delivery. Às emphasized throughout the chapter,
The lack of detailed regulations about cities are constrained by limited revenue
the different local government levels has sources and are highly reliant on transfers
limited the effectiveness of the decentral- from the central government. Reduced
ization reforms, but a new emerging legal financial autonomy of local governments
reform work map opens further opportuni- calls for a stronger municipal financial
ties for deepening decentralization efforts. system. For smaller cities, efforts can be
While the innovation introduced by the five focused on fixing the transfer system and
decentralization decrees adopted in 2006 using it as an opportunity to build local
was commendable, other pieces of legislation capacity for implementation. For larger
important for implementation of the decen- cities, steps are needed in the direction of
tralization structures are critically lacking. building capacity for own-source revenue
Regulations about the operation procedures collection, management, and spending.
for both the delegations of the communes and First, the government can focus on enforcing
the departments would need to be enacted. À the regulatory framework of the FGDCT to
draft law on decentralization and autonomy enhance the management, oversight, and
of communes and communal sections (so that transparency of the fund, including fund
local governments can become financially mobilization, allocation, and transfer, as well
autonomous) is currently in the legislative as expenditures and accounting. Specifically,
agenda. The passage of this bill will be critical it must ensure that the funds are mobilized
for further consolidation of decentralization. and allocated based on the criteria stated
Also, the government is considering a law in existing legislation; review the param-
amending the decree establishing the general eters for allocation of funds to communes
framework for decentralization and the and other local authorities; and develop
principles of organization of the Haitian terri- tracking mechanisms to ensure that the
torial communes (on staffing). It is important FGDCT is adequately replenished or collects
that decision makers seize the opportunity to all mandatory contributions. To address
specify as clearly as possible the functions and the lack of timeliness and predictability in
competencies of local government, as well as finance levels and volumes, special attention
196
[page 213]
should be given to improving the coordina- including forecasting of revenue. The first
tion mechanisms between the communes, set of activities to improve the financial
DGI, Ministry of Finance, treasury, and management functions of local govern-
the central bank for tax collection to reduce ments is to design and roll out a Local
delays in releasing the funds to municipali- Government PEM Manual. The Ministry
ties. Finally, it is also important to clarify the of Finance and Economy and the Ministry
status and future implementation of other of Interior should develop the manual to set
types of government funds, including the out the basic standards and procedures for
Fonds de Développement Local et Aménagement local government financial management,
du Territoire (FDLAT). including budgeting, accounting, reporting,
procurement, and audit requirements. This
Expand and leverage the local revenue base could be achieved through capacity-building
There is a lack of significant revenue programs that focus on four main areas:
autonomy at the municipal level and a large strengthening the administrative capacity of
dependence on the transfer system, which is the financial units in municipalities; strength-
embedded with structural problems and is ening the capacity of municipalities in project
reliable only to a certain extent. Additionally, management for timely disbursements of
municipalities often collect only a fraction FGDCT funds allocated to them; increasing
of their revenue potential and are without municipality revenue mobilization capacity,
proper capacity to effectively use resources including enhancing staff technical compe-
for the delivery of local services. À more tencies; and providing municipalities with
efficient, accountable, and fiscally responsible incentives to explore alternative financing
decentralization system will need municipal- mechanisms, including partnerships with the
ities with stronger and broader sources of local private sector and hometown associa-
local revenues. Currently, the main source tions of the diaspora.
of revenue in municipalities (the property In terms of improving tax collection
tax rate and business tax receipts) are not capacity, the government’s computeriza-
reflecting current market trends. In addition, tion of systems can improve collection rates.
collection of user fees and other duties The government could consider progres-
collected directly by municipalities critically sively automating nationwide tax collection
lack transparency, and mechanisms to track functions by deploying CIVITAX in munic-
the collection and account for its use are ipalities, taking advantage of all the function-
nonexistent. alities offered by CIVITAX, ensure the
In moving toward municipalities that progressive characteristic of property taxes
are able to generate and effectively collect (with a higher scale for the properties of greater
their own revenue sources, efforts must be market value), carry out property assessments
geared toward strengthening the planning in all municipalities, and update the property
and budgeting capacity in municipalities, tax registry accordingly to broaden the tax
#8CIVITAX is a comprehensive local tax management software system created by the Haitian firm Solutions S.A., in collabora-
tion with the LOKAL project, the MICT, the DGI, and other local partners.
197
[page 214]
base. Efforts in this direction can be taken
while at the same time facilitating legal and
technical mechanisms for municipalities to
carry out a census and appraisal of proper-
ties. In the communes where a census was
carried out, the collection increased consid-
erably. The MICT PRAFIPUM program
(Program for the Improvement of Municipal
Public Finance) is a step in the right direction.
However, detailed revenue mobilization
action plans with pragmatic revenue targets
need to be developed in the twenty communes
with the highest potential to increase revenue
derived from property tax. Also, to combat
tax avoidance, attention should be paid to
the taxpayer’s registry and efforts should be
devoted to constantly update it. Finally, it is
also important to minimize taxpayer exemp-
tions and deductions.
Improvements in regulation and efforts to
follow up and ensure compliance can improve
control over municipal budgets and increase
efficiency in the allocation of resources.
To exert greater control over the municipal
budget and ensure that it is allocated to the
most efficient use, the following steps can be
taken: establishing a regulatory mechanism
to limit budget spending commitments and
adhere to available resources to ensure the
smooth implementation of the budget and
avoid the accumulation of arrears; ensuring
that municipalities adhere to the regulatory
deadlines for drafting and approving the
budget; reinforcing existing mechanisms
to engage citizens and local civil society in
the budgeting process; and encouraging
and supporting municipalities to devise a
communal development plan accompanied
by multi-annual investment plans, which can
feed easily into the budgeting process.
198
[page 215]
REFERENCES Port-au-Prince, Ministère de l'Intérieur
et des Collectivités territoriales/USAID
Beaudin, R. 1998. Séminaire atelier sur la LOKAL.
Planification Décentralisée: La fiscalité Moniteur. (2006, June 2). Le décret du 1er
locale en Haïti. Miméo. février 2006 fixant l’organisation et le
Chery, F.G. 2009. Le financement de la décen- fonctionnement de la collectivité territoriale
tralisation et du développement local en municipale dite commune ou municipalité.
Haïti. Secrétariat Technique d'élab- Moniteur. (2006, June 14). Le décret du 1er
oration du Document de Stratégie février 2006 fixant le cadre général de la
Nationale pour la Croissance et la décentralisation ainsi que les principes
Réduction de la Pauvreté (DSNCRP). d'organisation et de fonctionnement des
Denis, J. 2014. Haiti, Local government collectivités territoriales haïtiennes.
system fiduciary assessment, Haiti: Paillant, J. 2012. Le code fiscal haïîtien, Henri
USAID. Deschamps, Port-au-Prince.
Denis, J. 2016. Public financial manage- Paul, B. and C. Charleston. 2014. Les
ment: Constraints and opportunities collectivités territoriales : analyses du
for CDCS. Haiti: USAID processus démocratique bloqué en Haïti.
Deshommes, F. 2003. Décentralisation et PRIMATURE/OMRH. 2013. Programme-
collectivités territoriales en Haïti, un cadre de la réforme de 1 ‘Etat: Réforme
état des lieux, Port-au-Prince, Editions administrative et décentralisation-
Cahiers Universitaires. Octobre 2012-Septembre 2017, Port-au-
Farvacque-Vitkovic, C.D. and M. Kopanyi. Prince, Office de management des
2014. Municipal Finances: À Handbook ressources humaines (OMRH),
for Local Governments. Washington, Primature, République d'Haïti.
DC: World Bank Group. Privert, J. 2006. Décentralisation et collec-
Grand-Pierre, C. 2015. Gouvernance de tivités territoriales (contraintes, enjeux et
proximité et collectivités territoriales en défis), Edition Le Béréen.
Haïti, C3 Editions, Port-au-Prince. USAID. 2015. Fact Sheet: Revenue Collec-
Le Nouvelliste (July 2014). Bilan de l’écon- tion Provides Opportunity. Available
omie haïtienne (Année 2012-2013 Le at https://www.usaid.gov/results-data/
mot de l'Association Haïtienne des success-stories/revenue-collection-pro-
Economistes-AHE), publié le o1-07- vides-opportunity. Accessed on 3 July,
2014 2017.
MICT. (May 2007). La municipalité haîtienne World Bank Group. 2016. Better Spending,
et les entités de l'administration publique. Better Services: À Review of Public
MICT. (June 2008). Projet de réforme des Finances in Haiti Washington, DC:
finances municipales : Propositions pour World Bank Group.
une meilleure mobilisation des recettes
communales (version préliminaire).
MICT. 2011. Recueil de textes normatifs
annoté, entourant l’action locale,
199
[page 216]
[page 217]
CITY CATEGORIES # OF CITIES DESCRIPTION
1 Moving beyond official administrative boundaries allows us to identify Port-au-
Prince as a large metropolitan area that comprises some of the municipalities in
the arrondissement of Croix-des-Bouquets. In line with previous results, the “Great-
er PaP” remains by far the largest urban cluster, accommodating 2.5 million inhab-
itants - equivalent to 43 percent of Haitis population in cities. Between 1990 and
2015, the urban population of the “Greater PaP” increased each year on average by
3 percent.
2 Cap-Haïtien and Gonaïves are “very large cities” with urban populations exceed-
ing 200,000 inhabitants. Between 1990 and 2010, the share of urban residents in-
creased by 4 percent in Gonaïves, and by 2 percent in Cap-Haïtien.
5 “Large cities” with more than 100,000 inhabitants are Port-de-Paix and Saint-
Marc, which expanded at a yearly average rate of 4 percent since 1990. Among
these third-class cities, we find the agglomeration of municipalities Cayes-Tor-
beck-Chantal-Camp-Perrine in the Sud département, and Ouananaminthe in the
Nord-Est département. Finally, as the municipality of Léogâne forms together with
Gressier - officially, part of Port-au-Prince - another large conglomerate, we ob-
serve that the metropolitan area stretches eastward, as well.1
3 Petite-Goave, Arcahaïe, and Jacmel are “medium-size” cities. In the case of Pe-
tite-Goave, annual growth averaged at 9 percent between 1990 and 2015.
6 These are municipalities with positive growth rates in their urban share. For in-
stance, in Anse-à-Pitre (Sud département, on the border with the Dominican Re-
public), the urban population increased by 8 percent on average every year since
1990. After the 2010 earthquake and the 2015 deportation of Haitians from the
Dominican Republic, informal settlements were precariously established, leaving
thousands of households without water, access to basic services, and eventually
exposed to cholera outbreaks.
2 Two of the smallest urban clusters have experienced population loss since 1990 -
like Petite-Bois, in Croix-des-Bouquets, possibly suffering competition from other
neighborhoods closer to the metropolitan area.
:It is important to note that while the last two categories are not officially classified as “cities,” they are clearly shown to be
important areas in terms of night light emission, population concentration, and urban footprint.
201
[page 218]
Erosion 2000 Erosion 2015
10,000,000 10,000,000
9,000,000 9,000,000
R 8,000,000 es R 8,000,000 es
è è
$ 7,000,000 mm , © 7,000,000
à S à d
Es 6,000,000 ë Es 6,000,000 es Ê
Ÿ 5,000,000 mms Ÿ 5,000,000 mn F4
$ 4000,000 es & 4,000,000
È 3,000,000 ES ES ! & È 3,000,000 S
À Z2,000,000 x) — = 5 À 2000000 ë
1,000,000 re M I 1,000,000 me
O0 = == == — o a. ON EN
Very Serious Elevat. Aver. None Very Serious Elevat. Aver. None
Serious or Low Serious or Low
Landslide 2000 Landslide 2015
0000 aa 00000 as
9,000,000 0000 ans
5 8,000,000 S 8,000,000
8 7,000,000 8 7,000,000 -
à K à S
Es 6,000,000 5 Es 6,000,000 Ë
: EA FA
È 5,000,000 = È 5,000,000 =
& 4,000,000 = & 4,000,000 =
5 3,000,000 = E 5 3,000,000 = «
> S à S
A 2,000,000 m OS À 2000000 ENË
1,000,000 - 1,000,000 =
o a NN EN o 0 NN EN |
High Elevated Medium None High Elevated Medium None
or Low or Low
Flood 2000 Flood 2015
10,000,000 10,000,000
9,000,000 9,000,000
S 8,000,000 S 8,000,000
$ 7,000,000 ms $ 7,000,000
È E À EF
re 6,000,000 5 à 6,000,000 É
È 5,000,000 D È 5,000,000 LL À
& 4,000,000 = & 4,000,000 =
5 3,000,000 Eh: 5 3,000,000 À = &
S œ S ag
A 2,000,000 = © À 2,000,000 = ©
| e} e
1,000,000 mm a _ 1,000,000 == a =
0 — —— — - I 0 — nu = _ I
High Elevated Medium None High Elevated Medium None
or Low or Low
[page 219]
ANNEX 3 — CLASSIFICATION OF CITIES BASED ON GRIDDED
POPULATION DATA AND NIGHT-LIGHT DATA
LAND DEVELOPMENT, CONSTRUCTION PERMITS, AND GUIDING PRINCIPLES OF URBAN DEVELOPMENT
Law pretaining to roads and public ways.
Law introducing construction regulations in cities.
Decree initiating special rules on housing and town management.
Establishes land use regulations and regulation for the management of urban areas.
Decree of March 23 modified Article 29 of Décret-loi of July 22, 1937 with respect to construction permits
(and introduced public use zones).
Decree of April 6, 1977 does not modify the procedures for allotment established under the laws of 1937
and 1963, but adds procedures for land development realized by a syndicate or society/collective of prop-
erty owners.
Decree of January 6 on subdivisions, plots, and parcels pertaining to size, conditions, and procedures.
LOCAL PLANNING INSTRUMENTS
“Organisation de la Collectivité territoriale de Section Communale”, introduced “local urban
plans” and commune development plans. There are no examples of these plans having been
implemented in practice (Garry Lherisson 2015).
Decree providing for local territorial management plans and local development plans. There
are a handful of cases where the latter plan has been developed where financing and techni-
cal assistance were available (Garry Lherisson 2015).
LEGAL FRAMEWORK FOR EXPROPRIATION OF LAND
The principle of expropriation has been enshrined in every Haïtian constitution since 1843, with
the exception of the constitution of 1888.
Law of September 1951.
Law of November 1979, Article 10 (defines instances of “public good”).
The constitution establishes the process for expropriation and compensation. Stipulates
property be returned to the original owner if the project is abandoned (Articles 36-1).
LAND DISPUTE RESOLUTION
The constitution mandated the Conseils d'Administration des Sections Communales (CASECSs)
to deal with land disputes; high court (Court de Cassation) and magistrates (Justice de Paix) can
call tribunals for these conflicts. National Agrarian Reform Institute (Institut National de la Ré-
forme Agraire [INARA)) also engages in rural land issues. There is no official channel to address
errors in land registration system, and no data on number of disputes at present.
203
[page 220]
EROSIONS, LANDSLIDES, AND FLOODS, 2000 AND 2015
PLAN NAME TYPE SCOPE
National Plan This plan builds on the national reconstruction plan of March
2010, with long-term vision of development that looks ahead
to 2030.
Sectoral Plan This plan aims to support access to safe, serviced housing.
Identifies major challenges including lack of: building con-
struction norms and enforcement; oversight and regulation of
individual construction efforts; skilled labor; urban planning;
and housing finance.
Sectoral Plan Aimed to provide strategic direction for short-, medium,
and long-term transportation policy to support national
economic development
Sectoral Plan Strategy developed by National Drinking Water and Sanitation
Directorate (DINEPA)
MASTER-PLANNING EFFORTS FOR PORT-AU-PRINCE
Plan de développement de Port-au-Prince”
“Plan Directeur d'Urbanisme de Port-au-Prince, phase l”
Urban growth management studies for the metropolitan area (no specific plan realized).
‘Schéma Directeur d'Aménagement de la Zone Métropolitaine de Port-au-Prince’ and a new ‘Plan
Stratégique de Développement’ (financed by the Inter-American Development Bank)
Onward, many studies and plans were realized with support from NGOs (e.g., “Plan for the
Reconstruction of the Centre of Port-au-Prince,” the “Plan d'Aménagement et de Développe-
ment Durable,” and a “Plan Local d'Urbanisme du Nouveau Port-au-Prince”).
Two UN Habitat-supported participatory planning forums, the latter of which resulted in the “Nation-
al Urban Forum Declaration.”
204
[page 221]
LOCAL SECTORAL PLANS
Plans communautaires pour l'aménagement post-séisme de quartiers de l’Airemétropolitaine de Port-
au-Prince. This plan provided micro-zoning.
Micro-zoning for Port-au-Prince (UNDP-supported initiatives)
() Location of exposed assets (georeferenced critical infrastructure like schools, hospitals, and roads)
(ii) GIS Maps developed by ministries of education, health, and public works in conjunction
with CNIGS
MASTER PLANNING EFFORTS FOR CAP-HAÏTIEN
Urban Growth Study
Urban Growth Study
UNDP-supported project or prepared background studies for master plans for Cap-Haïtien, Fort-Lib-
erté, Port-de-Paix, Gonaïves, Saint-Marc, Hinche, Miragoâne, Jacmel, and Cayes et Jérémie
“Schema Directeur d'Amenagement Urbain” of Cap-Haïtien (financed by ACDI-Canada, executed by
the consulting firm DESSAU)
The “Plan d'Aménagement du Nord/Nord-Est: Couloir Cap - Ouanaminthe, “ developed by CIAT
“Plan Stratégique Multisectoriel d'Aménagement” (MPCE with support from UNDP)
“Cap-Haïtien - Ouanaminthe Development Corridor: Regional Comprehensive Plan” (developed with
support from the IADB)
LOCAL SECTORAL PLANS
Tourism plan for Cap-Haïtien. Developed by the Ministère du Tourisme, this plan links tourism with
urban devleopment (for example, suggesting land use admendments, a metropolitan road network
to structure the future urbanization, waterfront redevelopment according to different zones, redevel-
opment of the estuary of Bassin Rodo into a touristic circuit, and treatment of the banks of the main
rivers as linear parks).
Strategic plans for the water sector (co-funded by the ACP-EU, Oxfam-UK, PROTOS, and GTIH)
The Plan de Financement de Services Publics Communaux (output of the USAID LOKAL+ project 2011)
“The Conception et Aménagement d’un Centre de Gestion Intégrée des Déchets Solides (CGIDS)”
(supported by AFD)
Northern Corridor Sustainable Mobility Plan (IADB)
The Northern Development Corridor Haiti: Urban Development and Climate Change Study (ERM
with IADB, February 2015)
205
[page 222]
ANNEX 5 — CONNECTIVITY
ON THE COSTS OF FRAGMENTED LABOR MARKETS AND THE BENEFITS OF ACCESSIBILITY
Cities are often referred to as centers of opportunity because they reduce the economic distance
between workers, employers, buyers, and sellers. This density reduces economic distance, decreases
the unit cost of supplying infrastructure such as transport networks, allows ideas to circulate, grow,
and mature, and promotes economic specialization whereby people can focus on what they do
best or enjoy the most (Glaeser and Kahn 2004; Ciccone and Hall 1906). These advantages of cities
explain why urban residents are generally more productive than workers outside urban areas, what
economists commonly call agglomeration economies that stem from proximity and exchanges
(Duranton and Puga 2004; Rosenthal and Strange 2004).
Cities are not always associated with high levels of employment accessibility. Although cities
concentrate on a restricted area of land, large numbers of households, and employment opportu-
nities, this simple geographic proximity does not imply that all households have an equal or even
good access to jobs. In Mexico, for example, urban sprawl and massive population decentralization
into single-use residential and peripheral settlements combined with uncoordinated urban growth
has widened the distance between jobs and housing. This undermines effective matching of skills
BOX 1 - AN ACADEMIC TAKE ON ACCESSIBILITY, PRODUCTIVITY, AND WELL-BEING —
GATHERING THE EVIDENCE
Prud’homme and Lee (1999) demonstrate that worker productivity increases with the share of jobs in the
urban area which are accessible within a 30-minute trip. Their case study investigated this relationship in 23
French cities and showed that a doubling of the share of jobs that could be accessed within that timeframe was
associated with a 15 percent increase in productivity (an elasticity of 0.15). From an employer’s point of view,
Cervero (2001) shows that in the San Francisco Bay area there is weaker yet, nonetheless, positive evidence that
the number of workers that can access work within a defined peak period ranging from 30 to 60 minutes (labor
markets) positively influences worker productivity levels. Melo, Patricia C., Daniel J. Graham, David Levinson,
and Sarah Aarabi (2013) show for a sample of US cities that increasing accessibility to jobs results in increased
productivity as measured by real wages. The authors report that a doubling of the number of jobs accessible
per worker within 20-minute thresholds result in an average increase in real wages of 6.5 percent. Aslund, ©. J.
Osth, and Y. Zenou. (2010), using a natural experiment in Sweden, also find that the proximity to jobs positively
impacts employment prospects even in the long term. Venables (2017) identifies that commuting costs and
thus average accessibility matters in urban settings. In order to attract skilled workers, firms must compensate
for their travel costs by offering higher wages. While this will benefit households, it can prevent firms from
reaping productivity gains and entering international markets because the average wage needed to compensate
workers is higher than competitive international standards.
206
[page 223]
to jobs in Mexican cities. It can also lead to lengthy commutes for those that have found jobs in the
main job centers primarily located downtown. In Mexico City, low-income households living in the
peri-urban areas can spend an additional four hours commuting per week compared to low-income
families residing in more central areas (Kim and Zangerling 2016).
This Annex provides a detailed description of distribution of economic opportunities in Haiti
with a focus on Port-au-Prince and Cap-Haïtien.
The overall job structure of Port-au-Prince is very similar to its residential structure, when
jobs are identified from areas with strong daytime activity as described in Box 2 (Chapter 3).
Apart from significantly higher daytime population densities in the above identified sub-centers
of Port-au-Prince, namely Carrefour, National Palace, Pétionville, and Croix-des-Bouquets, the
two maps of Figure 1 look very similar.*
SPATIAL DISTRIBUTION OF ECONOMIC OPPORTUNITIES (LEFT) AND
RESIDENCES (RIGHT) IN PORT-AU-PRINCE
Population Distribution - Port-au-Prince
Work Locations Home Locations
/ /
Fe ra - < 50,000
1 LA - < 42857+
É ; €
fe 7e L < 35,714 Ÿ
E: k = 28,572 €
à
8
+ < 21,429 >
ê
< 14,286 ©
- < 7,143
Source: Authors’ elaboration using Digicel data.
The fact that observations show only small differences in daytime and nighttime populations can be explained by a number of
factors: the sample of callers captures elderly or young people unlikely in both cases to move beyond the threshold distance of
a cluster; the sample captures unemployed active people who would not have a strong motivation to travel far; and the sample
captures people who either work from home or work close to home (i.e. within the 1 km radius from home that was used to
define home and work clusters) so that their home and job locations would be considered the same cluster.
[page 224]
DISTRIBUTION OF COMMUTERS DURING DAYTIME (LEFT) AND DURING
THE EVENING (RIGHT) IN PORT-AU-PRINCE
se F4 - s 30,000
/ 1 -s2574+
| £
7 PS - < 21,420 £
à - < 17,143 ©
us + < 12,857 >
È
-<8572 Ô
+ < 4,286
Source: Authors’ elaboration using Digicel data.
Notes: This figure shows that commuters flow to downtown Port-au-Prince for work and related purposes (left) and come from
everywhere in the urban area.
Figure 2 shows that in this case, most daytime population densities tend to cluster around the
National Palace with up to 90,000 people/km2, i.e. around 1.5 times its residential population. Pétion-
ville also sees a net increase in population densities during daytime indicating job-related attraction.
Mean population density in Pétionville increases by 27 percent to just above 50,000 persons/km2 from
just 40,000 persons/km2 during the evening. Likewise, some other areas to the northeast of the city
center also experience net increases in population densities during daytime, for example Saint Martin.
Farther north, the center of Croix-des-Bouquets sees a net increase of 39 percent during daytime. On
the other hand, other areas are notably residential. Carrefour and Canaan are two of those areas that
see net decreases of population densities during daytime of 8 and 30 percent, respectively.
The business district right in the center of Cap-Haïtien strongly dominates any other daytime desti-
nation, with daytime population densities reaching up to 80,000 people/km2. In comparison, the other
high-density location within Cap-Haïtien, Petite Anse, sees significantly fewer commuters than the center
ofthe city, with daytime population densities actually dropping by 24 percent compared to evening. Driving
south of the Mapou River, daytime densities decrease at a faster rate than during nighttime, indicating
again that commuters tend to leave these places for work.
[page 225]
DISTRIBUTION OF COMMUTERS DURING DAYTIME (LEFT) AND DURING
THE EVENING (RIGHT) IN CAP-HAÏTIEN
\ \ - < 15,000
we . TT
- s 10,714 Ÿ
£ 8
Ê + < 8,572 È
ë - < 6,429 £
- < 4,286 Ë
+ < 2,143
Source: Authors’ elaboration using Digicel data.
It is worth analyzing the flow of people from each of the buffers in order to understand usual
commuting behavior. Figure 4 depicts the flow of commuters from each specified buffer. The column
on the left depicts the daytime (work) location of the individuals who live in the selected buffer. The
column on the right depicts the evening time (home) location of the individuals who work in the
selected buffer. For instance, for the first row, the column on the left shows where those people living
in the center of Port-au-Prince go to work, whereas the column on the right shows where those people
working in the center of Port-au-Prince live.
The first row of Figure 5 depicts commuters from the center of town. It is possible to see that
most commuters who live in this area travel to Delmas and Pétionville during the day. The share of
commuters in the center of Port-au-Prince is rather small, which is likely because most people who
live in the center of Port-au-Prince also work there. The center of Port-au-Prince sees a huge influx
of people from different areas during the day including Carrefour and Martissant on the west,
Pétionville on the southeast and Delmas on the northeast.
The second row of Figure 5 reiterates that most people within a buffer of at least one and at most five
kilometers from the city center will commute to the city center to work, and a significant share will also
commute to Pétionville. There is a considerable number of people who work and live in the same buffer, as
depicted in the left pane of Figure 12 in chapter 3. The same figure also shows that most commuters will not
commute a much greater distance than those living in the center. In fact, the trend seems to go the other
way. This buffer is a net importer of people during daytime, with about a five percent more people coming
in during the day than leaving. People working in this buffer will travel from two to five kilometers to work
and seem to flow from the same directions as those coming to work in the center of town.
[page 226]
People who live in the most distant buffer see similar movements oflarge number of people going to work
in the center of Port-au-Prince and Pétionville. The region has almost twenty percent more commuters
commuting to work in the morning than commuting from work during the evening. Nevertheless, there
is more variation, with people living in this buffer going to work as far as Croix-des-Bouquets and Canaan.
Figure 12 in chapter 3 shows that there are a number of people who travel relatively great distances to work.
The graph shows that those who tend to travel longer distances to work also tend to go out of the buffer
during the day, suggesting that those are the ones who travel to the center of town. À large proportion of
those people likely travel from Carrefour. On the other hand, those who live and work in this buffer tend to
travel smaller distances and they are likely spending their daytime in regions such as Croix-des-Bouquets
and Pétionville. The pane on the right of Figure 5 confirms this, as the many well-lit places all over the
buffer indicate that people who work in this buffer also tend to live in the same region and travel smaller
distances.
The flow of commuters from each buffer during the day and evening time in Cap-Haiïtien is depicted in
Figure below. The first row of Figure 5 (left pane) shows that a number of commuters who live in the center
of town tend to go to Petite Anse during the day and some others tend to travel farther south along the
Mapou River. The center of Cap-Haïtien sees about six people commuting into the area during the day for
every commuter who travels outside ofit.
The histogram in Figure 13 (Chapter 3) shows that about seventy percent ofthe trips to the center are less
than five kilometers. Most of those trips are from commuters who live in the second buffer, either farther
south along the Mapou River or in Petite Anse. The second row (left pane) of Figure shows that the vast
majority of commuters in the second buffer takes that direction. About 95 percent ofthe commuters (Figure
13 in chapter 3, second row, left column) in the second buffer travel less than five kilometers to work.
210
[page 227]
COMMUTING FLOWS FOR EACH DISTANCE TO THE CITY CENTER
BUFFER IN PORT-AU-PRINCE
Flows from Buffer (Commuters Only) - Port-au-Prince
Living in Buffer (N = 41,678) Working in Buffer (N = 187,141)
L L
{N = 462.263) {N = 487,398)
” Er ge PS - < 1295
PA 4
0 < 34252 ÿ < 10453
{N = 952,739) {N = 782,515)
pi < 36,926 Fr < 12.016
/ n
- s 31.651 — 4 < 10,300 —
EU Et Ë
Source: Authors’ elaboration using Digicel data.
Notes: The left column shows the work destination of people living in each buffer. The right column shows the home location of
people working in the selected buffer. The first row shows results for locations within 1km from city center, the second row for
locations between 1km and 5km from the center, and the last row for locations beyond 5km and within 25km from the center.
211
[page 228]
Figure 5.
Flow of Commuters from Buffer - Cap-Haïtien
Living in Buffer (N = 12,301) " Working in Buffer (N = 74,266) %
d \ 1244 _ Î J ï 6,639 _
{N= 114,078) 2 (N = 74,650) a ca
x à
(N = 74,268) a, (N = 51.829) nes
x x
< 1,870 | < 230
Source: Authors’ elaboration using Digicel data.
Notes: The left column shows the work destination of people living in each buffer. The right column shows the home location of
people working in the selected buffer. The first row shows results for locations within 1km from city center, the second row for
locations between 1km and 5km from the center, and the last row for locations beyond 5km and within 25km from the center.
[page 229]
CRITICALITY ANALYSIS
The criticality analysis undertaken for this study deserves a few explanations. Road links were
removed individually, and the travel times between each potential Origin and Destination were
recomputed using a network analysis toolbox following a shortest path algorithm. In total, the
removal of 268 road links was tested. The most critical road links were identified by calculating
how the average accessibility to opportunities in the urban area of Port-au-Prince was affected.
The lower the average accessibility compared to the baseline, the more critical the road link.
The average accessibility is moderately impacted by the removal of the road links. The
maximum impact is to reduce the average accessibility by five percent for a sixty-minute threshold.
There are two main explanations for this low impact. First, when even localized natural hazards
hit, they are likely to take out more than one road link, making some areas much more difficult
to bypass. We do not capture this impact. Secondly, the calculations we used in this exercise do
not account for congestion. In the model, when one road link becomes unavailable all traffic
will use a lengthier route, but the travel speed on the alternate route will remain identical and
unaffected by extra traffic. In reality, when traffic is rerouted to an alternate link, the capacity of
that link is likely to become overused leading to congestion that would further reduce the average
accessibility in the urban area.
With these limits in mind, Figure 6 shows how accessibility is modified at the local level by the
removal of the fifteen most critical links in the urban area.
215
[page 230]
MAPS OF LOSS OF ACCESSIBILITY TO OPPORTUNITIES RELATIVE TO
THE BASELINE (IN PERCENTAGE POINTS) FOR DISRUPTION OF THE
FIFTEEN MOST IMPORTANT ROAD LINKS IN THE URBAN AREA OF
PORT-AU-PRINCE
HR i. je
na cor na cor
hip Dit
Î RÉ RE
La nca cr La nca cr
in ac or in acer
214
[page 231]
L — — BE: L — — fé
| Leusnsnnn: SAS 8È
De da, —”’ HE PO “ous
‘ CRE 1
HE j [ RE.
CHR E He ie, s RC ER SET FES
— | L__ Her \20u%) et a : Rs CEE RE)
Re Ps nice ÉRTTERR EREES
LARRRRPT SRE POP SP EN RER : FRERE EEE ERPR EE ENT PRPPERE |
0 CREME he D TEE SEE
Los ace (pr) Los a ces (56)
SPA Het Een Je mu mun
— — RS D
é DECÉFÉEERILE EEE
! FRERES RIRES
! PAREPREEEEUEEE = HE es.
ee Éd eD set En Gi 43
Due Danse ne ne Dee: me
Sun RUES 100150 M 500.560 M 06.90
4 Te Era x 150-200 IR 550-600 DB 92-1000
+ Eurausant + Duran mure
Su mue
DÉÉÉÉEFREE Rerssnen
JF RPÉRENS CERTES
ARTS BR ES MORE MessRansssant ee Janerc cime en HPREE $
k HE . FRE
Caihenret Pau Énie eD En ni 87 5-45
Ent Era roy * 152-200 IE 550-600 DB 2-10
Eusantaut Dur mu ee
[page 232]
Los of accessbilty (9 port) Los of accessbilty (9 port)
59.00 D 0.320 MN 550» A5-m0 D 0-0 M mon
RS un din
Loss of ccessbiy (poire)
Source: Authors’ elaboration using CNIGS data on road and Tap-Tap networks.
216
[page 233]
REFERENCES
Aslund, ©. J. Osth, and Y. Zenou. 2010. “How Important Is Access to Jobs? Old Question--Im-
proved Answer.” Journal of Economic Geography 10 (3): 389-422. doi:10.1093/jeg/Ibpo4o.
Ciccone, Antonio, and Robert E. Hall. 1996. “Productivity and the Density of Economic Activity.”
The American Economic Review 86 (1): 54-70.
Duranton, Gilles, and Diego Puga. 2004. “Micro-Foundations of Urban Agglomeration Economies.”
Handbook of Regional and Urban Economics 4: 2063-2117.
Glaeser, Edward L., and Matthew E. Kahn. 2004. “Sprawl and Urban Growth.” In Handbook of
Regional and Urban Economics, edited by J. Vernon Henderson and Jacques-François Thisse,
Volume 4:2481-2527. Cities and Geography. Elsevier.
Melo, Patricia C., Daniel J. Graham, David Levinson, and Sarah Aarabi. 2013. “Agglomeration,
Accessibility, and Productivity: Evidence for Urbanized Areas in the US.” In Paper Submitted
for the Transportation Research Board 92nd Annual Meeting.
Rosenthal, Stuart S., and William C. Strange. 2004. “Chapter 49 Evidence on the Nature and
Sources of Agglomeration Economies.” In Handbook of Regional and Urban Economics,
4:2119-71. Elsevier. http://linkinghub.elsevier.com/retrieve/pii/S1574008004800063.
Venables, Anthony J. 2017. “Breaking into Tradables: Urban Form and Urban Function in a Devel-
oping City.” Journal of Urban Economics 98 (March): 88-07. doi:10.1016/j.jue.2017.01.002.
217
[page 234]
The objective of this study consists in analyzing the main issues linked to municipal finance at
the national level. More specifically, it is a review of the different funding sources, which looked
at the global and local tax system, the territorial aspect, the distribution of resources and expen-
ditures, and finally, outlining the problem of municipal finance in Haïti.
The methodological approach adopted included understanding the tasks, literature review,
data collection, interviews with key decentralization stakeholders, and report generation. The
document review was to identify and analyze different legal documents relevant to local taxation,
research reports, and books and articles on fiscal decentralization and local finance. The purpose
of the data collection was to obtain from the main sources concerned information on local finance
stemming from the MICT, DG1, the six targeted communes by the Municipal Development and
Urban Resilience (MDUR) project, and the official government gazette le Moniteur the legal texts
on decentralization and taxation.
The main difficulties encountered were the inconsistencies between the data coming from
different sources over the same research period. Often, the data are incomplete for the last three
years. Therefore, they can only be subject to limited use in the analysis. Indeed, beyond the values
reflecting the weight of all Haitian municipalities in the global tax values (both expenditures and
revenues), the universe of municipalities must be disaggregated according to their size. For that
reason, we worked from three different groups, according to the classification used for the tax
definition on business licenses (Article 28 of the Act on the business license).
Type 1 5 2,401,032 22% 480.206 6.2
Type2 12 2,069,621 19% 172.468 2.2
Type3 123 6,441,166 59% 51.945 0.7
TOTAL 140 10,911,819 100% 77.389 1.0
Source: Authors’ elaboration using Digicel data.
Including Tabarre, which was also part of the former municipality of Delmas.
[page 235]
a) First group: Port-au-Prince, Pétionville, Carrefour, Delmas, Tabarre: 2,401,032 inhabitants
b) Second group: Aquin, Cap-Haitian, Cayes, Fort-Liberté, Gonaïves, Hinche, Jacmel, Jérémie,
Miragoâne, Petit-Goâve, Port-de-Paix, Saint-Marc: 2,069,621 inhabitants
c) Third group: the 123 other communes: 6,441,166 inhabitants
Financial autonomy must be taken into consideration as an important question in carrying out
the fiscal analysis of the communes; this is the element that could give an effective role to local
governments in the management of their territories, whether it be in urban or rural settings. In
this case, percentage of own resources must be estimated against total resources of the communes.
In the Haïitian context, we will consider as the municipalities own resources those collected
directly by them, and as tax resources those collected on their behalf by DGI. The difference
between the costs incurred by the communes and the revenues is paid by the transfers made by the
MICT through the FGDCT.
To calculate the effects and be able to make comparisons between municipalities, we estimated
the resources and expenditures per capita. It is also important to classify the communes based on
the department to which they belong, so as to identify the existence of specific features amongst
the different regions.
In relation to the information sources, we have worked with the data provided by the MICT and
by the DGI. We also used specific information derived from the communes of the Cap- Haïtien
agglomerate. Note that the data is incomplete and there are inconsistencies and serious shortcom-
ings. In some cases, we made estimates based on other data. For the spending of the FGCDT, we
have had to work with the programming data at that time, since information pertaining to imple-
mentation was unavailable.
Finally, it is necessary to point out that the issue of communal sections, institutionally defined as
basic territorial collectivity (section 2.1, Article 15, Chapter II, decree defining the decentralization
framework) is not directly relevant to the context of this work. While the institutional framework
currently in force considers the communal section as an important entity, in practice, its devel-
opment status is embryonic and the provision of paragraph 1 contained in Article 140 from Part
II of the decentralization decree that specifies that 25 percent of the collection of the property tax
(CFPB) received by the communes should be transferred to the communal sections has not even
come into force.
219
[page 236]
Re
ni 4 4 = —._” E | v Le A
VW | A 4228 3 # > A Le er a =
Pr EF. ms | LAN | 4 :
PTE |
à) 4) ; N\v2 — =
3$ FLOWMINDER.ORG
Digicel ‘mms © GFDRR