(2015) Odit Pwogram USAID/Ayiti yo ki rele Leveraging Effective Application of Direct Investments
Rezime — Yon odit sou pwogram LEAD USAID/Ayiti ki koute 12 milyon dola a te montre li pa rive nan rezilta yo te espere yo, li te bay sèlman 12 sibvansyon olye de 40 epi li te kreye 637 travay olye de 13,000 yo te vize yo.
Dekouve Enpotan
- Pwogram nan te bay sèlman 12 sibvansyon ($1.9M) olye de 40 sibvansyon yo te espere yo ($5.5M) apre 3 ane.
- Te kreye sèlman 637 travay konpare ak objektif ki pa t' reyèl la ki te 13,000+ travay.
- Pifò sibvansyon yo te ale nan biznis yo nan Pòtoprens olye yo te desantralize aktivite ekonomik la.
- Efò yo te fè pou rive jwenn diaspora ayisyen yo nan Etazini an pa t' ase.
- Pwogram nan te gen pwoblèm ak anplwaye ak pwosè apwobasyon ki te long yo.
Deskripsyon Konple
Rapò odit sa a egzamine pwogram USAID/Ayiti yo ki rele Leveraging Effective Application of Direct Investments (LEAD), yon inisyativ 12 milyon dola Pan American Development Foundation (PADF) te mete sou pye depi 2011 rive nan 2015. Pwogram nan te gen pou objè kreye travay ak atire envestisman etranje nan mwayen konpetisyon plan biznis ak sibvansyon ki matche pou ti ak mwayen antrepriz yo (SME).
Odit la te jwenn gwo pwoblèm nan pèfòmans pwogram nan. Apre prèske twa ane yo te ap aplikel, pwogram nan te bay sèlman 12 sibvansyon ki matche ki te gen valè 1.9 milyon dola olye de 40 sibvansyon yo te espere yo ki ta gen valè 5.5 milyon dola. Kreyasyon travay yo te vrèman move, ak sèlman 637 travay yo te kreye olye de plis pase 13,000 yo te vize yo.
Plizyè faktè ki te kontribye nan move rezilta sa yo, tankou pwoblèm ak anplwaye yo, move kalite plan biznis yo ki te bezwen anpil koreksyon, pwosè revizyon yo ki te long, ak anviwonman biznis ki difisil nan Ayiti. Pwogram nan te echwe tou nan angaje diaspora ayisyen yo nan Etazini yo kòm yo te dwe fè a epi yo pa t' suiv kondisyon yo pou pataje depans yo kòm yo te dwe fè a.
Odit la te fè nèf rekòmandasyon pou amelyore efikasite pwogram nan, tankou konsantre sou aktivite ki gen pi gwo enpak yo, mete objektif kreyasyon travay ki reyèl yo, fè evalyasyon pèfòmans yo, ak devlope pi bon estrateji pou angaje diaspora a.
Teks Konple Dokiman an
Teks ki soti nan dokiman orijinal la pou endeksasyon.
OFFICE OF INSPECTOR GENERAL
AUDIT OF USAID/HAITI’S
LEVERAGING EFFECTIVE
APPLICATION OF DIRECT
INVESTMENTS PROGRAM
AUDIT REPORT NO. 1-521-15-006-P
APRIL 30, 2015
SAN SALVADOR, EL SALVADOR
Office of Inspector General
April 30, 2015
MEMORANDUM
TO: USAID/Haiti Mission Director, John Groarke
FROM: Acting Regional Inspector General (RIG)/San Salvador, David J. Clark /s/
SUBJECT: Audit of USAID/Haiti’s Leveraging Effective Application of Direct Investments
(LEAD) Program (Report No. 1-521-15-006-P)
This memorandum transmits our final report on the subject audit. In finalizing the audit report,
we considered your comments on the draft and included them in their entirety in Appendix II.
The audit report contains nine recommendations to help the mission improve various aspects of
the program. Given the information provided in response to the draft report, we acknowledge
the mission’s management decisions on all nine and final action on Recommendations 1, 2, and
6 through 9. Please provide evidence of final action on Recommendations 3, 4, and 5 to the
Audit Performance and Compliance Division in USAID’s Office of the Chief Financial Officer.
Thank you and your staff for the cooperation and assistance extended to us during this audit.
RIG/San Salvador
U.S. Agency for International Development
Embajada Americana
Urb. y Blvd Santa Elena
Antiguo Cuscatlan, Depto. La Libertad
San Salvador, El Salvador
http://oig.usaid.gov
CONTENTS
Summary of Results ................................................................................................................... 1
Audit Findings ............................................................................................................................. 4
Program Awarded Fewer Grants Than Expected ................................................................... 4
Job Creation Target Was Unrealistic ...................................................................................... 5
Reported Results Were Unreliable .......................................................................................... 6
Implementer Made Most Awards to Businesses in the Capital ............................................... 6
Outreach to Haitians in the United States Was Insufficient ..................................................... 7
Implementer Did Not Meet or Track Annual Cost-Share Requirements Effectively ................ 8
Evaluation of Management Comments ..................................................................................... 9
Appendix I—Scope and Methodology .................................................................................... 11
Appendix II—Management Comments ................................................................................... 13
1
SUMMARY OF RESULTS
According to the International Finance Corporation,
1
small and medium-sized enterprises
(SMEs) account for 80 percent of employment in Haiti. However, SMEs have difficulties
obtaining loans, and entrepreneurs lack the skills necessary to expand their businesses. In
2014, the World Bank
2
ranked Haiti 177 out of 189 countries for ease of doing business,
underscoring the difficult business environment.
To address the needs of job seekers and small businesses, in July 2011, USAID/Haiti awarded
a $12 million, 4-year cooperative agreement to the Pan American Development Foundation
(PADF) to implement the Leveraging Effective Application of Direct Investments Program. The
agreement stated that the program’s main goal was to create jobs and incomes and attract
foreign investment, including from members of the diaspora.
3
As of March 2014, the mission
had obligated $6.4 million and disbursed $4.8 million for the program.
The program used business-plan competitions and matching grants to attract investments in
Haitian SMEs that the program determined had high potential for growth and employment
generation. SMEs entered the competitions by submitting their business plans, and successful
applicants receive business advisory services—technical assistance and training to start,
improve, or expand their businesses—as well as grant money that they were expected to
match. The program also sought to increase the development impact of remittances—funds
sent to Haiti by Haitians living in other countries—by appealing to diaspora members to channel
them into SME investments.
Anticipated results of the program include:
Providing matching grants ranging from $50,000 to $200,000 to approximately 40 Haitian
firms.
Providing business advisory services to 120 SMEs.
Completing approximately 50 small infrastructure activities funded by diaspora investments.
Creating more than 13,000 new jobs.
The Regional Inspector General San Salvador conducted this audit to determine if
USAID/Haiti’s program activities were creating new investment opportunities for SMEs.
The audit found that although activities were creating some new investment opportunities, the
program fell significantly short of expected results. As of March 31, 2014, almost 3 years into
the 4-year program, the program had held just two competitions and awarded promising SMEs
only 12 matching grants valued at $1.9 million.
1
“Small and Medium Enterprises: Stories of Impact,” June 2013, accessed on December 4, 2014, at
http://www.ifc.org/.
2
http://www.doingbusiness.org/reports/global-reports/doing-business-2014.
3
Program documents use diaspora to describe Haitians living in the United States.
2
The program also sought to increase the development impact of remittances. However, at the
time of the audit, PADF officials had implemented only limited outreach to Haitians living
abroad. They said they planned more activities later and were looking for outreach programs to
model theirs on. The audit found:
The program awarded fewer grants than expected (page 4). To get grants, businesses
competed by submitting their business plans. Program staff found the plans were of poor
quality and spent time working with semifinalists to prepare better ones.
The job-creation target was unrealistic (page 5). The program planned to create 13,000 new
direct jobs. By the program’s definition, an SME employs 10-100 people. If the program
provided grants to the expected 40 firms, and all of them created 100 jobs, the number of
jobs created (4,000) would be less than a third of the target.
The program’s reported results were unreliable because the implementer used unclear
definitions for measures or indicators of job creation (page 6).
The implementer made most awards to businesses in the capital (page 6). The program
planned to decentralize economic activity by steering some grants to businesses outside
Port-au-Prince. However, the implementer awarded grants primarily to businesses in Port-
au-Prince because most applications came from there, including the best ones.
Outreach to Haitians in the United States was insufficient (page 7). Officials conceded that
the business-plan competitions had taken attention away from outreach efforts.
Consequently, the program did not receive the expected influx of remittances.
PADF did not meet or track its required annual cost-share contributions effectively (page 8).
Such contributions by the implementer offset program costs and increase the implementer’s
incentive to achieve program goals.
To help USAID/Haiti improve the effectiveness of the program, we recommend that the mission:
1. Identify and focus on activities that will have the most impact in the time remaining on the
program (page 5).
2. Determine the number of jobs the program can realistically generate given the resources
available, and update its target accordingly (page 5).
3. Conduct a performance evaluation of the program to determine program impact, and
evaluate the potential for investments in SMEs (page 5).
4. Document issues noted in previous portfolio reviews,
4
and implement a mechanism to
resolve them (page 5).
5. Evaluate the performance indicators, revise indicator definitions to eliminate ambiguity, and
document the results (page 6).
4
A portfolio review, done at least once a year, assesses results to determine whether a “project is ‘on
track’ or if course corrections are needed” (ADS 203.3.12).
3
6. Identify and document opportunities for engaging with the chambers of commerce in Cap-
Haitien and St. Marc in providing business advisory services (page 7).
7. Develop strategies for engaging members of the diaspora, and incorporate activities under
the remittances program (page 8).
8. Require the implementer to correct the deficiency in its system for tracking cost-sharing
contributions (page 8).
9. Require the implementer to catch up on its cost-share contributions so that it meets its full
cost share by program’s end (page 8).
Detailed findings appear in the following section. The scope and methodology are described in
Appendix I. Management comments are included in their entirety in Appendix II without
attachments, and our evaluation of management comments begins on page 9.
4
AUDIT FINDINGS
Program Awarded Fewer Grants
Than Expected
According to the agreement, PADF would devise an investment strategy to bring together
potential investors and SMEs in Haiti. The strategy combined a business-plan competition with
matching grants. Businesses could enter the competitions by submitting business plans, and
successful applicants would receive technical assistance and training to start, improve, or
expand their businesses. The program also planned to attract investment from Haitians living
abroad to increase the development impact of remittances to Haiti.
However, after almost 3 years, the program had made very limited progress. As of March 2014,
the program had awarded only 12 grants of $1.9 million and submitted 15 grant packages to
USAID for approval out of the expected 40 grants totaling $5.5 million. Moreover, the grants
were awarded so late in the program they left little time for grantees to start or expand
operations, add jobs, and achieve results as anticipated.
Difficulties in implementation explained the limited progress.
Program Had a Difficult Start. In the first year, program staff spent a lot of time preparing
program documents like the performance management plan and getting them approved by
USAID. Initial versions did not include sufficient information and needed revisions to obtain
USAID’s approval. The program also suffered from staffing problems. The chief of party was
replaced twice, and recruiting a new deputy chief of party was a lengthy process. The approvals
and staffing challenges impeded program implementation.
Business Plans Needed Remediation. PADF staff devoted a lot of time and effort to
developing the business plan competitions. Staff found that the early applications received were
not as strong as expected, so they provided training to semifinalists in strategic planning,
accounting, human resources management, marketing, and business plan development to
improve the quality of the business plans submitted. These efforts slowed implementation.
Review Process Took Time. Before awarding a grant, the program (1) did due diligence,
confirming business registration and verifying that the documents received from the SMEs
complied with USAID rules and regulations,
5
(2) got approval from the mission, (3) did
background checks on prospective grantees, and (4) made sure businesses met USAID
environmental requirements.
Business Environment Was Difficult. The agreement acknowledged the many constraints
that small businesses in Haiti face: limited access to finance, time needed to register a
business, and uncertainty that contracts they enter into will be enforced. Coming up with the
funds that the program promises to match is particularly difficult because banks do not want to
lend to small businesses.
5
The program contracted with an independent financial services firm to do this.
5
All these factors hindered program implementation. As a result, the $6 million in resources
obligated for the program as of March 2014 will have little impact. To address these concerns,
we make the following recommendation.
Recommendation 1. We recommend that USAID/Haiti and the Pan American
Development Foundation identify and focus on activities that will have the most impact in
the time remaining on the program.
Job Creation Target Was Unrealistic
ADS 203.3.9 requires missions to establish ambitious yet realistic targets that can be achieved
within a stated time and with available resources.
Job creation is one program goal. According to the agreement, the program envisioned creating
more than 13,000 direct jobs by providing matching grants to approximately 40 Haitian firms to
help them grow.
That target was unrealistic. The program defined an SME as an enterprise employing between
10 and 100 employees. If the program awarded 40 grants, the maximum number expected, and
each grantee generated a maximum of 100 jobs, the maximum number of jobs created would
be 4,000, which is less than a third of the target of 13,000 jobs. Moreover, the SMEs have
added jobs at a much lower rate than anticipated. The program reported creating only 637 full-
time jobs as of March 2014.
The target was unrealistic because the mission and PADF did not build it or a plan for achieving
it into the program design. The mission’s request for application did not include an estimate of
the number of jobs to be created; the mission added the estimate later in the cooperative
agreement, without any explanation of how it was developed. PADF noted early in the program
that the employment goal was large and not clearly defined.
USAID/Haiti documented program challenges in its 2012 portfolio review—changes in key
personnel and PADF’s delay in submitting its monitoring and evaluation plan—but did not
document their resolution. Resolving them, especially finalizing the monitoring and evaluation
plan, might have led to faster detection and adjustment of the unreasonable target.
Thousands of jobs were not created as expected, and opportunities for much-needed economic
investment may have been missed. To address this concern, we make the following
recommendations.
Recommendation 2. We recommend that USAID/Haiti determine the number of jobs
the program can realistically generate given the available resources, and update its
target accordingly.
Recommendation 3. We recommend that USAID/Haiti conduct a performance
evaluation of the program to determine program impact, and evaluate the potential for
investments in small and medium-sized enterprises.
Recommendation 4. We recommend that USAID/Haiti document outstanding issues
noted in portfolio reviews, and implement a mechanism to resolve them.
6
Reported Results Were Unreliable
According to ADS 203.3.11.1, missions should ensure that data for performance monitoring
clearly and adequately represent the intended result.
As the previous finding made clear, the number of jobs created as a direct result of the program
was a key performance indicator. Its target was set at 13,492 jobs. However, PADF did not
report on this indicator in its progress reports. PADF instead reported progress on Number of
additional persons employed, which included jobs created indirectly by the program.
The difference that using this alternate indicator makes becomes apparent in reporting for one
grantee, a plastics recycling business in Port-au-Prince. For the quarter ending September 30,
2013, PADF’s performance report indicated the business employed 5,831 additional persons.
Report readers might have assumed that meant 5,831 full-time jobs were directly created by the
program, a result equal to 43 percent of the target. In fact, the program had directly created jobs
for (added to its payroll) only 61 people, less than 1 percent of the number expected. The
remaining 5,770 people had indirect employment: they were “suppliers” who collected plastic
objects and sold them to the business by the piece or by weight.
The lack of clarity in reporting occurred because USAID and the program did not have clear and
consistent definitions for jobs created. The mission expected the program to use a
measurement of full-time equivalents—people working a minimum number of hours—so that
data collected by PADF would be more consistent with jobs data collected by other USAID-
funded programs. PADF officials did not use such a measure, noting in progress reports that
converting jobs to full-time equivalents posed challenges. For example, in the recycling
business, some jobs were paid by the piece rather than by the number of hours worked. To
calculate the indirect jobs reported for the recycling company, which provided 98 percent of
indirect jobs reported, the contractor divided the number of pounds of recycled materials
collected by an estimate of the number of pounds an individual could collect per day. The
indicator differences were never resolved.
Data need to be accurate and reliable to give results credibility. Without safeguards to ensure
the reliability of the data, the program’s reported results for job creation may be overstated.
Therefore, we make the following recommendation.
Recommendation 5. We recommend that USAID/Haiti evaluate the performance
indicators, revise definitions to eliminate ambiguity, and document the results.
Implementer Made Most Awards to
Businesses in the Capital
According to the agreement, the program would implement activities in the U.S. Government’s
three designated development corridors: Cap-Haitien, Port-au-Prince, and St. Marc.
Recognizing that investment opportunities might lie disproportionately in Port-au-Prince, PADF
decided to decentralize economic activity, giving priority to Cap-Haitien and St. Marc SMEs.
However, PADF did not follow its strategy of decentralizing economic activity. Of the 12 grants
awarded as of March 31, 2014, 7 were to SMEs in Port-au-Prince, compared with 4 in Cap-
Haitien and 1 in St. Marc.
7
The program worked through the Haitian chambers of commerce to publicize its business-plan
competitions, but because it had not established a relationship with the chamber of commerce
in St. Marc, businesses there were not notified. The St. Marc chamber of commerce was
independent and not linked to the larger national chamber network.
Other factors influencing the geographic distribution of grantees were the number and quality of
applications from Port-au-Prince. More applications came from there than from elsewhere.
Further, program officials said that while the quality of most applications received was lower
than expected, the higher-quality applications and viable plans were from Port-au-Prince.
As a result, contrary to its strategy of decentralizing economic opportunity, the program provided
support disproportionally to SMEs in Port-au-Prince. The businesses in Cap-Haitien and
St. Marc will not benefit as intended by the program’s economic strategy. To address this
concern, we make the following recommendation.
Recommendation 6. We recommend that USAID/Haiti and Pan American Development
Foundation identify and document opportunities for engaging with the chambers of
commerce in Cap-Haitien and St. Marc in providing business advisory services.
Outreach to Haitians in the United States
Was Insufficient
The agreement aimed to “develop and test innovative mechanisms to increase the development
impact of remittances in Haiti.” Haitians abroad continue to send money to Haiti, and these
remittances contribute significantly to the Haitian economy: $1.5 billion a year, equivalent to
26 percent of Haiti’s gross domestic product.
6
The program saw the diaspora remittances as an
opportunity to channel investments into SMEs in Haiti, attracting additional foreign investment to
the sector.
PADF planned to develop and test several approaches to tap remittances. Approaches
included:
A drive on social media sites to establish a fund for investing in SMEs.
Diaspora matching programs with corporations.
According to the second-year work plan, the program also planned nine road shows to U.S.
cities with large Haitian populations. Road shows would highlight grantees that have become
successful entrepreneurs with support from the program’s matching grants.
However, the program’s efforts at diaspora engagement have been modest. In the second and
third years combined, the program completed only two road shows, at Columbia University in
New York in March 2013 and in Port-au-Prince (rather than a U.S. city) in January 2014. It held
three informational sessions in Atlanta, Boston, and Miami in 2013 at which no grantees were
present.
6
Lucy Conger with Diego Fonseca, “Keeping Remittances Flowing to Haiti,” Inter-American Development
Bank, http://www.iadb.org/en/news/webstories/2010-01-28/keeping-remittances-flowing-to-haiti,6481.html.
8
PADF officials acknowledged that during the first year they had focused on the business-plan
competition and said that in the second year they were waiting to develop replicable models to
have something to show potential investors. While focusing on the business-plan competitions,
the program neglected its outreach plans.
Further delays in starting these activities will reduce the time remaining in the program to do
significant outreach and lessen the impact of remittances channeled to SMEs. To address this
concern, we make the following recommendation.
Recommendation 7. We recommend that USAID/Haiti and Pan American Development
Foundation develop strategies for diaspora engagement and incorporate activities under
the remittances program.
Implementer Did Not Meet or Track Annual
Cost-Share Requirements Effectively
According to ADS 303.3.10, cost share refers to resources a recipient contributes to the program’s
total cost. Recipients may satisfy cost-share requirements through in-kind contributions of
supplies, equipment, and other property. If a recipient does not meet its cost-share requirement,
the mission’s agreement officer may (1) apply the difference in actual cost share amount from the
agreed upon amount to reduce USAID funding for the following period, (2) require the recipient to
refund the difference to USAID when the award expires or is terminated, or (3) reduce the amount
of cost share required under the award.
The agreement required PADF to contribute a total of $1,250,500 in cost sharing. As of March
31, 2014, PADF should have contributed a total of $1,046,000 in cost-sharing contributions.
However, it had contributed only $390,429, resulting in a shortfall of $655,571.
Reasons given for the shortfall varied. PADF officials said most of the cost-share would come
from activities to be implemented during 2014 and 2015. For their part, mission officials said
PADF did not adequately track its cost-share contributions; PADF had not recorded the costs of
several events paid by some partners to promote the program.
Cost share is a mechanism by which a USAID implementer can contribute to its program,
increasing funding available for activities. In addition, cost-share contributions provide a
financial stake in program success. If the implementer does not make the required contributions,
activities may be reduced and goals not met. To address this issue, we make the following
recommendations.
Recommendation 8. We recommend that USAID/Haiti require the implementer to
correct the deficiency in its system for tracking cost-sharing contributions.
Recommendation 9. We recommend that USAID/Haiti require the implementer to catch
up on its cost-share contributions so that it meets its full cost share by the program’s end.
9
EVALUATION OF MANAGEMENT
COMMENTS
USAID/Haiti agreed to take action on all nine recommendations. After reviewing the
management comments, subsequent correspondence, and supporting documentation we
acknowledge that the mission made management decisions on all the recommendations and
took final action on Recommendations 1, 2, and 6 through 9. Our detailed evaluation of
management comments follows.
Recommendation 1. Identify and focus on activities that will have the most impact in the
time remaining on the program. The mission determined that PADF’s fiscal year (FY) 2015
work plan identifies activities that will maximize program impact. The mission said PADF would
focus on implementing these activities until the end of the agreement on July 27, 2015. We
acknowledge the mission’s management decision and final action.
Recommendation 2. Determine the number of jobs the program can realistically generate
given the resources available, and update its target accordingly. After deciding to accept
both direct and indirect jobs in the indicator definition (revised in response to
Recommendation 5), the mission determined on March 10, 2015, that the original target for the
number of new jobs created by the program was realistic and that no update to the target would
be required. We acknowledge the mission’s management decision and final action.
Recommendation 3. Conduct a performance evaluation of the program to determine
program impact, and evaluate the potential for investments in SMEs. The mission reported
that a performance evaluation of the program was in progress. It was intended to provide
information on the program’s impact and the possibility of continuing U.S. Government support
to SMEs through PADF. The mission planned to complete the evaluation by May 31, 2015. We
acknowledge the mission’s management decision.
Recommendation 4. Document issues noted in previous portfolio reviews, and
implement a mechanism to resolve them. In its management comments, the mission said
staff had already worked with PADF and addressed issues noted in the 2012 portfolio review. In
subsequent correspondence, the mission said it would use the after-action memos drafted by
the program office after each portfolio review to track outstanding issues, which it planned to
discuss during the next portfolio review, scheduled for July 15, 2015. We acknowledge the
mission’s management decision.
Recommendation 5. Evaluate the performance indicators, revise indicator definitions to
eliminate ambiguity, and document the results. The mission agreed to conduct an internal
review of performance indicators, revise definitions for clarity and consistency where needed,
and document the results of this activity by June 30, 2015. In addition, management comments
indicated the mission would include the improved definitions and targets in future solicitations.
We acknowledge the mission’s management decision.
Recommendation 6. Identify and document opportunities for engaging with the chambers
of commerce in Cap-Haitien and St. Marc in providing business advisory services. The
mission determined that PADF’s FY 2015 work plan identifies activities to engage with the
10
chambers of commerce in Cap-Haitien and St. Marc in providing business advisory services.
The mission said PADF would continue implementing these activities until the end of the
agreement on July 27, 2015. We acknowledge the mission’s management decision and final
action.
Recommendation 7. Develop strategies for engaging members of the diaspora and
incorporate activities under the remittances program. The mission determined that PADF’s
FY 2015 work plan includes strategies and activities for diaspora engagement under the
remittances program. The mission said PADF would continue implementing these activities until
the end of the agreement on July 27, 2015. We acknowledge the mission’s management
decision and final action.
Recommendation 8. Require the implementer to correct the deficiency in its system for
tracking cost-sharing contributions. The mission provided documentation of PADF’s new
cost-share contribution tracking system, which has been in place since December 31, 2014. The
mission said PADF would use the system to track its cost-share contributions until the end of
the agreement on July 27, 2015. We acknowledge the mission’s management decision and final
action.
Recommendation 9. Require the implementer to catch up on its cost-share contributions
so that it meets its full cost share by program’s end. The mission determined that PADF
was on track to meet its full cost share by the end of the agreement on July 27, 2015. Officials
based this determination on PADF’s contributions as of December 30, 2014, and projected
contributions through the program’s end. The mission documented this determination on
March 10, 2015. We acknowledge the mission’s management decision and final action.
Appendix I
11
SCOPE AND METHODOLOGY
Scope
The Regional Inspector General San Salvador conducted this performance audit in accordance
with generally accepted government auditing standards. Those standards require that we plan
and perform the audit to obtain sufficient, appropriate evidence to provide a reasonable basis for
our findings and conclusions in accordance with our audit objective. We believe that the
evidence obtained provides that reasonable basis.
The objective of the audit was to determine whether USAID/Haiti’s Leveraging Effective
Application of Direct Investments Program was achieving its main goal: creating new investment
opportunities for Haiti’s SMEs.
USAID/Haiti awarded PADF a $12 million, 4-year cooperative agreement to implement the
program. As of March 31, 2014, USAID/Haiti had obligated $6.4 million and disbursed
$4.8 million for program activities. The disbursed amount represents the amount tested during
this performance audit.
The audit covered the period from the program’s inception, July 28, 2011, through March 31,
2014. We conducted audit fieldwork from April 21 to September 22, 2014, at USAID/Haiti and at
PADF’s office in Port-au-Prince. We also met with grantees in Port-au-Prince and Cap-Haitien.
In planning and performing the audit, we assessed the significant internal controls the mission
used to manage the program: work plans, quarterly progress reports, the performance
monitoring and evaluation plan, approval of subawards, and meetings with grantees. We also
reviewed the mission’s annual fiscal year 2013 assessment of internal controls required by the
Federal Managers’ Financial Integrity Act of 1982.
Methodology
To determine whether USAID/Haiti appropriately managed the program activities, we met with
USAID/Haiti officials, including the agreement officer’s representative, financial analyst,
assistance specialist, monitoring and evaluation officers, and gender specialist. We reviewed
the agreement, technical proposals and evaluation, work plans, performance monitoring and
evaluation plans, progress reports, and the grants manual. We interviewed PADF’s country
director, grants manager, monitoring and evaluation officer, value chain and technical
assistance adviser, and SME relationship manager to understand PADF’s management controls
and the individuals’ understanding of program activities and constraints to implementation. We
also reviewed PADF’s policies and procedures for selecting the winners of the business-plan
competition and verified that grantees met the selection criteria and eligibility requirements. We
verified reported results by reviewing source documents, observing program activities, and
interviewing grantees. We evaluated the program’s performance against the agreement and
results in progress reports.
We interviewed grantees and reviewed 7 of 12 subaward files to confirm the existence of
program activities. We judgmentally selected grantees for ongoing activities based on grant
size, type of grantee, and geographic location. Since the testing and the grantee selections
Appendix I
12
were based on judgmental samples, the results are limited to the items tested and cannot be
projected to the entire audit universe.
Appendix II
13
MANAGEMENT COMMENTS
TO: Van Nguyen, Regional Inspector General
FROM: John Groarke, Mission Director /S/
CC: Michael Wyzan, EGAD, Office Chief
Claire Johnson, Controller
DATE: March 10, 2015
SUBJECT: Mission response to the audit of USAID/Haiti’s Leveraging Effective Application
of Direct Investments program (RIG Draft Report No. 1-521-15-XXX-P, dated
January 27, 2015).
This memorandum lays out the actions that USAID/Haiti will take to address the
recommendations reported in the draft audit of USAID/Haiti’s Leveraging Effective Application
of Direct Investments program (LEAD) / RIG Draft Report No. 1-521-15-XXX-P (Attachment
#1).
As acknowledged by Inspector General (IG) Staff in an initial post-audit review with the
Mission, the LEAD program has made substantial progress on all fronts since the time of this
audit. While the program did get off to a slow start, somewhat understandably given the novelty
of both business plan competitions and the challenge of developing new diaspora remittance
models, almost immediately after the IG’s review the program’s activities and performance
accelerated. The Mission is confident that PADF will be able to successfully reach its
development objectives both substantially and on time. This being said, the Mission
acknowledges and accepts recommendations 1, 3, 5, 6, 7, 8, and 9, and herein provides plans and
timelines for implementing the recommendations. The Mission respectfully provides additional
comments to clarify some findings contained in recommendations 2 and 4, but in general
necessary actions will be taken to address and close these recommendations.
Recommendation No. 1: We recommend that USAID/Haiti and the Pan American
Development Foundation identify and focus on activities that will have the most impact in
the time remaining on the program.
Appendix II
14
Mission Response
The Mission will implement the following Plan of Action to address this recommendation.
Plan of Action
USAID is conscious of the delay in implementing the LEAD activities. We believe the activities
planned in LEAD’s FY 2015 work plan will sufficiently address this concern. PADF has
committed itself to completing the business plan competition including allocation of all
remaining balances of the grant funds. In addition, the FY 2015 Work Plan stipulates that the
program will focus on providing technical assistance to all the applicants to the competition, both
winners and losers, as a way to maximize the impact of the program (Attachment #2).
Timeline for accomplishment: LEAD’s FY 2015 work plan was submitted and approved in
December 2014. Implementation has started and will be an on-going action until the end of the
agreement which is July 27, 2015.
Recommendation No. 2: We recommend that USAID/Haiti determine the number of jobs
the program can realistically generate given the available resources, and update its
target accordingly.
Mission Response
The Mission will implement the following Plan of Action to address this recommendation.
Plan of Action
The Mission accepts that the definition of jobs was not sufficiently clear in the Request for
Applications (RFA) leading to the LEAD Cooperative Agreement (CA) and that the RFA did not
sufficiently address the topic of targets. However, by accepting the PADF proposal as received,
along with PADF’s subsequent supporting definitions of “new jobs created” to include direct
jobs (created within the LEAD-funded enterprises) as well as indirect jobs (jobs created in
relation to LEAD-funded enterprises), the Mission in effect accepted both the broad description
of jobs created and resulting targets, in part because PADF made a convincing case that the jobs
attributed to the project would not have been created in the absence of the program activities. To
be consistent with the original definition, and with satisfaction that both direct and indirect jobs
claimed would not have been otherwise created without program activities, the Mission feels the
original target of 13,492 new jobs created is realistic and meaningful (Attachment #3).
Recommendation No. 3: We recommend that USAID/Haiti conduct a performance
evaluation of the program to determine program impact, and evaluate the potential for
investments in small and medium-sized enterprises.
Mission Response
The Mission will implement the following Plan of Action to address this recommendation.
Appendix II
15
Plan of Action
A performance evaluation of the LEAD program is in progress. The objective of the evaluation is
to provide pertinent information to USAID and its partner on the overall impact of the LEAD
project and will serve as a basis for considering whether or not an extension of the Cooperative
Agreement can be granted to PADF, allowing them to improve the program effectiveness and
sustainability through continuous technical assistance to USG-assisted small and medium
enterprises (Attachment #4).
Timeline for accomplishment: The deadline for the completion of subject evaluation is May 31,
2015.
Recommendation No. 4: We recommend that USAID/Haiti document outstanding issues
noted in portfolio reviews, and implement a mechanism to resolve the problems at the
program level.
Mission Response
The Mission will implement the following Plan of Action to address this recommendation.
Plan of Action
The portfolio review conducted in January 2012 documented that there were no
accomplishments as of January 30, 2012. That was understandable given that the program was at
the start-up stage. The same portfolio review also mentioned that the partner was preparing the
official launch of the program, which was scheduled for February 29, 2012. Please note that the
management issues related to changes in Key Personnel and the delay in submitting a decent
M&E plan were addressed later during the implementation of the program through exchanges
between the Chief of Party (COP) and the USAID’s Agreement Officer’s Representative (AOR)
(Attachment #5).
Recommendation No. 5: We recommend that USAID/Haiti evaluate the performance
indicators, revise definitions to eliminate ambiguity, and document the results.
Mission Response
The Mission will implement the following Plan of Action to address this recommendation.
Plan of Action
PADF has been tracking “Number of New Jobs Created” as its key indicator since the beginning
of the program, per the CA. However, in order to make the data collected by PADF more
consistent with jobs data collected by other USAD-funded programs, PADF was asked to
convert its job creation indicator to a measure of Full-Time Equivalent (FTEs). As documented
in PADF’s FY 2015 approved PMP given the many challenges associated with converting jobs
to FTEs, PADF proposed to report job data using two indicators: 1) Number of additional jobs
Appendix II
16
measured by full time equivalent (FTEs) created, and 2) Number of additional persons
employed. This would allow PADF to count jobs in two ways - within the strict FTE definition
as well as a using a broader category of jobs created. The rationale and date collection
methodology for both indicators is further and clearly defined in accompanying performance
indicators reference sheets (PIRS). The Mission is satisfied with this approach.
As a result of this audit exercise as well as internal discussions on how to improve the Mission’s
Performance Management Plans (PMPs), we agree that differences among job definitions must
be resolved. Therefore, the Mission agrees to: conduct an internal review of performance
indicators including the definition of FTE; to revise definitions where needed for consistency
and to eliminate the ambiguity; to document the results of this activity; and, to include these
improved definitions as well as targets in future RFAs.
Timeline for accomplishment: The deadline to complete this evaluation is June 30, 2015.
Recommendation No. 6: We recommend that USAID/Haiti and Pan American
Development Foundation identify and document opportunities for engaging with the
chambers of commerce in Cap-Haitian and St. Marc in providing business advisory
services.
Mission Response
The Mission will implement the following Plan of Action to address this recommendation.
Plan of Action
During the fourth quarter of FY 2014, PADF/LEAD signed a MOU with the “Chambre
Commerce, Industrie et Profession du Nord’Est” (CCIPNE). The goal of the partnership is to
build the Chamber’s capacity, to improve its sustainability by increasing membership and
collecting dues, as well as organizing trainings for local entrepreneurs.
Timeline for accomplishment: Opportunities for engaging with the Chambers of Commerce in
Cap-Haitian and St. Marc in providing business advisory services have been identified and
documented in the FY 2015 work plan. Implementation has started and will be an on-going
action until the end of the agreement as July 27, 2015.
Recommendation No. 7: We recommend that USAID/Haiti and the Pan American
Development Foundation develop strategies for diaspora engagement and incorporate
activities under the remittances program.
Mission Response
The Mission will implement the following Plan of Action to address this recommendation.
Plan of Action
Appendix II
17
PADF fully recognizes Diaspora engagement as a major component of its LEAD program.
Diaspora outreach efforts had not started in earnest at the time of the audit, but have been
substantially executed since that time including highly publicized and well-attended “road show”
outreach events in the United States and completion of a major research survey and analysis
regarding potential future diaspora investment.
LEAD’s technical approach is centered on scaling up PADF’s successful “Remittances for
Development” methodology, which uses a competition and leveraging approach to stimulate
Diaspora remittance support for priority community level development projects. The key
partners to develop this component of LEAD are local community organizations,
ZAFEN/FONKOZE, Diaspora organizations such as the Haitian Home Town Association
Research Group (HHTARG). PADF allocated $500,000 for this component of the LEAD
program. $182,000 has already been awarded to two Social Enterprises through our partner
Yunus Social Business. The remaining $318,000 will be used to leverage Diaspora philanthropy
for development projects. An RFA was issued to solicit applications for the LEAD Social
Development Fund has been advertised during the second quarter of FY 2015 with a closing date
of February 7, 2015 (Attachment #6).
Timeline for accomplishment: Strategies for Diaspora engagement and incorporation of
activities under the remittances program have been included in the FY 2015 Work Plan.
Implementation has started and will be an on-going action until the end of the agreement which
is July 27, 2015.
Recommendation No. 8: We recommend that USAID/Haiti require the implementer to
correct the deficiency in its system for tracking cost-sharing contributions.
Mission Response
The Mission will implement the following Plan of Action to address this recommendation.
Plan of Action
Following the recommendation of a financial review performed by an independent Certified
Public Accounting Firm, the Merové Pierre et Associés, in May 2014, PADF has developed a
tracking system to capture the cost-sharing contributions during the remaining period of the
Cooperative Agreement (Attachment #7).
Timeline for accomplishment: Action already completed as of December 31, 2014.
Recommendation No. 9: We recommend that USAID/Haiti require the implementer to
catch up on its cost- share contributions so that it meets its full cost share by the project’s
end.
Mission Response
The Mission will implement the following Plan of Action to address this recommendation.
Appendix II
18
Plan of Action
As of December 30, 2014, PADF had collected $820,826 and according to the projections they
are confident that they will collect the remaining amount of the cost-share contribution by July
27, 2015(Attachment #7). We believe this recommendation is being addressed.
Timeline for accomplishment: PADF will continue to use its tracking system to capture the
cost-share contribution until the end of the Agreement which is July 27, 2015.
U.S. Agency for International Development
Office of Inspector General
1300 Pennsylvania Avenue, NW
Washington, DC 20523
Tel: 202-712-1150
Fax: 202-216-3047
http://oig.usaid.gov
Audit Task Number 11140514