Teks Konple Dokiman an
Teks ki soti nan dokiman orijinal la pou endeksasyon.
DISCLAIMER
THIS PUBLICATION WAS PRODUCED AT THE REQUEST OF THE UNITED STATES AGENCY FOR INTERNATIONAL DEVELOPMEN T.
IT WAS PREPARED INDEPENDENTLY BY PHANOL PHILIPPE WITH THE AS SISTANCE OF OTHER “CHASE CONSULTING”
PERSONNEL.
FINAL PERFORMANCE EVALUATION OF
THE “CHABON BOUL” PROJECT
PHOTO: A BIGCHAR PYROLYSIS RETORT AT THE “CHABON BOUL” FACTOR Y
Photo: a BigChar pyrolysis retort at the “Chabon Boul” factory
USAID/HAITI
“CHABON BOUL” PROJECT
IMPLEMENTED BY CARBON ROOTS HAITI S.A.
Final Performance
Evaluation Report
Contract Number: AID-521-0-00-17-00039-00
Period of performance: 07/21/2017 to 12/13/2017
CHASE Consulting
10, Rue Acacia, Port -au-Prince, Haïti
November 13, 2017
DISCLAIMER
THIS PUBLICATION WAS PRODUCED AT THE REQUEST OF THE UNITED STATES AGENCY FOR INTERNATIONAL DEVELOPMEN T.
IT WAS PREPARED INDEPENDENTLY BY PHANOL PHILIPPE WITH THE AS SISTANCE OF OTHER “CHASE CONSULTING”
PERSONNEL.
CONTENTS
ACRONYMS 1
SUMMARY 2
1 EVALUATION PURPOSE AND EVALUATION QUESTI ONS 7
1.1. EVALUATION PURPOSE 7
1.2. EVALUATION QUESTIONS 7
2 PROJECT BACKGROUND 7
2.1 PROJECT DESCRIPTION 8
2.2 THEORY OF CHANGE 10
3 EVALUATION METHODS A ND LIMITATIONS 10
3.1. EVALUATION METHODS 10
3.1.1 OVERVIEW 10
3.1.2 DATA COLLECTION METHODS 11
A. IN-DEPTH PROJECT DOCUMENT REVIEW AND COST-BENEFIT ANALYSIS 11
B. FOCUS GROUP DISCUSSIONS (FGDS) AND WORKSHOP 12
C. SEMI-STRUCTURED INTERVIEWS WITH KEY INFORMANT 13
3.1.3 DATA SYNTHESIS AND ANALYSIS 14
3.2 LIMITATIONS 14
4 FINDINGS, CONCLUSIONS AND RECOMMENDATIONS 15
4.1 FINDINGS 15
4.1.1 NET REVENUE FROM THE GREEN CHARCOA L ACTIVITY 15
4.1.2 FUNDING, TECHNOLOGY AND SKILLS 15
4.1.3 PRODUCTION 17
4.1.4 RAW MATERIALS AVAILABILITY 19
4.1.5 QUALITY AND MARKETING 20
4
.2 CONCLUSIONS 21
4.3 RECOMMENDATIONS 21
4.4 SYNTHESIS OF LEARNING FROM THE IMPLEMENTATION OF THE “CHABON BOUL”
ACTIVITY 21
ANNEXES 1
A1. SCOPE OF WORK 1
A2. DATA COLLECTION TOOLS
10
A3. DATA SOURCES 19
A4. SUMMARY OF PROJECT HISTORY 22
I. 1 | “CHABON BOUL” PROJECT PERFORMANCE EVALUATION
USAID.GOV
ACRONYMS
APS Annual Program Statement
BoP Base of the Pyramid
CBA Cost-Benefit Analysis
CHASE Collectif Haïtien pour l’Avancement du Suivi et de l’Evaluation
CRH Carbon Roots Haiti
CRI Carbon Roots International
DIV Development Innovations Ventures
FGD Focus Group Discussions
KII Key Informant Interview
NPV Net Present Value
ROI Return on Investment
USAID.GOV “CHABON BOUL” PROJECT PERFORMANCE EVALUATION | 2
SUMMARY
Background Context and Objectives
In July 2017, USAID/Haiti awarded CHASE
1 a contract to conduct the performance evaluation of the
“Chabon Boul” project implemented in the Northern Department over the last two years. The purpose
of the evaluation is to assess whether the Activity was able to achieve its intended outcome to produce
a viable, affordable and cost-effective product (cooking briquettes) that can be used as an alternative for
traditional charcoal in Haiti. This evaluation shall provide pertinent information to USAID and its
partners on the overall impact of the Activity and serve as a basis for considering whether this activity
can be replicated on a larger scale.
The “Chabon Boul” Project hopes to achieve three major and intertwined strategic objectives: 1)
increase briquette production, 2) expand the retail distribution network, and 3) increase sales of green
charcoal briquettes. Green charcoal creates financial sustainability through jobs, income, and value
throughout the local value chain while achieving a reduction in deforestation.
The following questions were provided by USAID to be addressed during the evaluation process:
1. To what extent the Green Charcoal for Haiti Activity was able to achieve a positive net
revenue? If yes, what were the most important factors contributing to this achievement? If not,
what were the main constraints leading to this non-achievement?
2. What lessons learned can be derived from the Green Charcoal for Haiti business model to
reduce the dependency on firewood and traditional charcoal?
Evaluation Methodology
Only qualitative methods were used for this evaluation. The evaluation team used the following
methods:
o Secondary data review, including all available project documentation: periodic reports, project design
document, documents on the various modifications (See appendices 1), studies carried out within the
framework of this project, annual plans, follow-up plans, M&E plans, etc.
o 23 Key Informant Interviews (KII) with key stakeholders, including Mission staff, CRH personnel,
beneficiaries, local rum distillers and micro-entrepreneur agricultural processors and other market
actors;
o Interactive workshop with CRH employees to discuss lessons learned from the project
implementation;
o Cost Benefit Analysis
Findings, Conclusion, Recommendations and Lessons Learned
1
CHASE: “Collectif Haïtien pour l’Avancement du Suivi et de l’Évaluation”
I. 3 | “CHABON BOUL” PROJECT PERFORMANCE EVALUATION
USAID.GOV
A. Net revenue from the green charcoal activity (Question 1)
The production of “Chabon Boul” in its present form is not a viable business. CRH has not been able to
generate positive net revenue, despite USAID support. According to the project managers, the income
from the sale of green charcoal, which represents the only source of revenue for the company, is always
less than the sum of the expenses incurred by the activity. The company is now closed due to lack of
financial means. The goals for the USAID-awarded 24-month grant period were to:
• Grow revenue to achieve positive cash flow at the north Haiti production facility
• Upgrade production equipment to commercialize all processing, from pyrolysis to briquette and
drying.
• Raise private sector financing for capital expenditures on production and transport equipment
Key aspects that are considered in the analysis of the company’s operation are funding, production, key
inputs, marketing and product quality.
REVENUE. A large part of the amount granted was used, as planned, for the acquisition of modern
equipment. In early 2017, Carbon Roots Haiti (CRH) installed and commissioned a commercial pyrolysis
unit that convert sugarcane bagasse to charcoal. According to the members of the production team,
these orientation sessions gave them the necessary capacity to use the machines.
When planning the BigChar purchase, it was hoped that the machine could both convert bagasse into
green charcoal and provide clean high heat to dry bagasse and green charcoal briquettes coming off the
production line. This assumption was incorrect. The current process relies on solar energy over several
days (three to five) to dry both the bagasse and the freshly released charcoal from the commercial
briquette pressing machine.
According to document review and various meetings in the field, the income from the sale of coal still
decreased with the financing. According to the project managers, to reach the break -even point, the
company must have at least five equipment units (BigChar) like the one bought with USAID funds.
Today the company is looking for a grant of about 2.5 million USD to accomplish this benchmark.
According to the project proposal, the project designers acknowledged that additional equipment units
were needed for the activity to be profitable. As expected, and according to project personnel, the
acquisition of the new equipment (the BigChar unit) was more like a demonstration of what the
company could do with a more appropriate technology. The acquisition of the new equipment also puts
the company in a mode of operation where it is more easily scalable.
CRH reported that increasing the price of the ‘Chabon Boul’ product to increase revenue is not a viable
option. Currently, an equal volume of the two brands of charcoals (traditional charcoal and Chabon
Boul) are sold at the same average price. Monthly sales prior to the current shutdown are far below the
projection of a $60,000 monthly sale limit to achieve profitability.
With the acquisition of the new equipment, the company has reduced its staff. Therefore, the costs of
the operations were reduced. However, the company still operates with more than twenty employees
in addition to other expenses such as carrying bagasse (about 350 USD / month), taxes, fuel, repairs, etc.
It is difficult for the evaluation team to provide strong conclusions and recommendations without access
to information about the company’s monthly expenditures. There is no way to determine how
increasing production will affect the future profitability of CRH.
USAID.GOV “CHABON BOUL” PROJECT PERFORMANCE EVALUATION | 4
PRODUCTION . According to CRH managers, the green charcoal production has decreased with the
USAID grant. Prior the BigChar installation, the company produced about 5 to 6 tons of charcoal per
day; now the charcoal production is 1 to 1.5 tons per working day. This is related to the capacity of the
machine. As production has decreased, less green charcoal is sold with support received from USAID.
In addition to the reduction in production, the various stakeholders in the field also report lack of
regularity in production. In fact, repeated breakdowns prevented the company from producing
continuously with detrimental consequences on marketing and sales. Conversely, it is encouraging for
the company that it usually sells everything it produces. Production varies with seasons as well since
solar energy is required to dry the final products. The company tried an alternative means to dry the
briquettes without much success. The company’s large distribution network was reduced with the
decrease in production and sales
RAW MATERIALS . Sugarcane bagasse is used to produce the “Chabon Boul”. According to several
informants, the bagasse available can readily support several green charcoal factories the size of CRH.
With dozens of distilleries in the northern plain, production has suffered just one slowdown due to a
scarcity of bagasse since the launch of the activity.
A disadvantage in the use of bagasse lies in the fact that it must be dried for use. In the rainy season, it is
difficult to dry bagasse collected because the drying done under the sun.
The project has been successful in promoting bagasse as a byproduct of distilleries. As an effect of CRH
activities, bagasse now has a price. Distillery owners complained as well that the price paid by CRH for
the cart of bagasse is not the same everywhere.
At the beginning of operations, kits were provided to bagasse suppliers who were engaged in preparing
the char themselves. It was soon realized that the char prepared in the 55- gallon metal drums was of
poor quality which would have a direct impact on the quality of the finished product. Drums of char
were bought according to their weight and some suppliers fraudulently placed stones in the drums to
increase the weight of the char to gain more money. The decision was then made to centralize the
management of bagasse combustion (char production) at the company level which increased the quality
of the product and efficacy of the resources.
Starch is another essential input in the production of green charcoal. According to information
collected, locally produced starch made from cassava, especially in “cassaveries,
2” was used initially.
Again, the company would face some suppliers who mixed starch with other products (flours) to
increase their earnings. The mixture reduces the quality of the starch and consequently the quality of
the resulting green charcoal. The decision was then made to source corn starch from major US-based
industries, a fruitful initiative according to CRH managers.
2
A place where cassava or other cassava products are made.
I. 5 | “CHABON BOUL” PROJECT PERFORMANCE EVALUATION
USAID.GOV
MARKETING AND PRODUCT QUALITY . Immediately after the launch of the project, several
types of marketing were used to reach potential consumers. Visits with potential buyers proved to be
the most beneficial. According to stakeholders, consumers are generally satisfied with the price and the
quality of the product. The quality of “Chabon Boul” has increased gradually with several key decisions
made by the company's management.
According to the consumers consulted, Chabon Boul is easy to use. They estimated that the Chabon
Boul intensified the heat produced resulting in a shorter cooking time. Also reported was the Chabon
Boul does not produce smoke that darkens cooking utensils. Finally, unlike traditional, bagged wood
charcoal, the Chabon Boul briquettes remain intact in the bag. However, consumers visited also claim
that Chabon Boul produces a lot of ash. According to the information gathered, if you do not pay
attention, the large amount of ash produced is susceptible to blowing around, dirtying the kitchen and
beyond.
B. Synthesis of learning from the project implementation (Question 2)
The “Lessons Learned” workshop offered an opportunity for reflection after the completed project. It
was valuable to reflect on what worked well with the project and what could be improved upon from
the perspective of representatives from the project team. Project documents were consulted as well in
this sense. The main lessons are the following:
Leadership. One of the main lessons learned revolves around decisions made by the management team.
One such decision was the rotation of the production team for better results and better personnel
management. The multiple tasks performed by the production team vary with some being far more
demanding than others. There is the handling of the machine that refines dried bagasse, the preparation
of the starch, the mixture of char, starch and other materials needed, monitoring the temperature of the
BigChar to make sure everything is working fine. Since the company decided to give the same salary to
everyone, it initially created frustration. The managers chose to rotate the 14-member production team
and better distribute the workload. This improved the dynamics of the team and reduced their
frustration.
Research. Consistent conversations with consumers lead to ongoing research on how to improve the
product to meet their requirements and achieve client satisfaction. Resulting improvements in char
production include smokeless green charcoal and improved materials in its composition.
Marketing. As mentioned above, several marketing methods have been used by the company to
promote the "Chabon Boul." The marketing method of visiting potential consumers of the product and
providing a sample amount to test at home yielded the best results; people like to test the product
before making the decision to buy. After having tested it, the purchase decision followed almost
automatically. Insufficient product supply was a barrier to marketing efforts.
Sales strategy. Imitating the traditional charcoal marketing circuit directly in competition with the
"Chabon Boul," sales managers sought to understand and then facilitated a rapid integration of the
market.
USAID.GOV “CHABON BOUL” PROJECT PERFORMANCE EVALUATION | 6
Quality control. Performing quality control throughout the entire production chain increases the
quality of the final product. This quality control cannot be trusted to the many actors in the production
chain, but by a company manager with control mechanisms implemented at all stages.
Repeated stoppages of production. Repeatedly stopping production is detrimental to the range of
customers the industry would like to have. Stoppages were most often due to equipment breakdown or
problems related to lack of funds.
Conclusion and recommendations
According to all the information shared with the evaluation team and in line with projections, the
“Chabon Boul” business did not break even with the grant they received from USAID. Already in the
fourth modification, it is clearly stipulated that the project did not intend to achieve profitability with this
grant and that it would need an additional funding. It said that the funds from this second grant from
USAID should be used to install one new pyrolysis retort, which will serve as a demonstration of
technology and scale to investors, who would then lend and invest another $1 million to bring the
production factory to a sufficient scale to reach financial sustainability. As a result of decreased
production and sales, projections have been further modified or adjusted as the company now needs a
grant of approximately $ 2.5 million to achieve profitability. According to managers, in its current status,
the company will still need external support to survive.
Despite the repeated work stoppages, the company has a relatively faithful client base. While there is
the chance that CRH may lose some potential customers and market share to propane, the main raw
material, sugarcane bagasse, is available in a quantity largely sufficient to operate the current enterprise
and after an increase in size. Two major drawbacks with bagasse are 1) in wet weather bagasse cannot
be used due to lack of sunshine, and 2) in times of drought, there is shortage of bagasse. The quality of
the product, according to the majority of the customers, is good and they are generally happy. The
inconvenience of too much ash is offset by a competitive price, relatively shorter cooking time, and no
smoke.
The evaluation team recommends that the industry:
• Has better expense appraisal to better estimate the break-even level and increase the level of
transparency in the communication of financial information;
• Regularizes the “Chabon Boul” production in order to increase customer loyalty (repeated
shutdowns due to energy or other problems affect the market);
• Regularizes the price of the bagasse cart to reduce frustrations;
• Continues to improve the quality of the product (specifically the complaint of ashes during the
burning process);
Find better ways to dry bagasse and charcoals (Drying in open air is unreliable during raining seasons).
I. 7 | “CHABON BOUL” PROJECT PERFORMANCE EVALUATION
USAID.GOV
1 EVALUATION PURPOSE AND EVALUATION QUESTI ONS
1.1. EVALUATION PURPOSE
In July 2017, USAID/Haiti awarded CHASE (Collectif Haïtien pour l’Avancement du Suivi et d’Évaluation )
a contract to conduct the performance evaluation of the Green Charcoal for Haiti Activity (Chabon
Boul Project). The purpose of the evaluation was to assess whether the Green Charcoal Activity was
able to achieve its intended outcome to produce a viable, affordable and cost-effective product (cooking
briquettes) that can be used as an alternative for traditional charcoal in Haiti. This evaluation shall
provide pertinent information to USAID and its partners on the overall impact of the Green Charcoal
Activity and serve as a basis for considering whether this activity can be replicated on a larger scale. The
primary stakeholders for this evaluation include: USAID/Haiti, Carbon Roots International (CRI) and
Carbon Roots Haiti (CRH).
This document presents the final evaluation report including detailed methodology for the evaluation
and describing key findings, conclusions and recommendations.
1.2. EVALUATION QUESTIONS
1. To what extent the Green Charcoal for Haiti Activity was able to achieve a positive net
revenue? If yes, what were the most important factors contributing to this achievement? If not,
what were the main constraints leading to this non-achievement?
2. What lessons learned can be derived from the Green Charcoal for Haiti business model to
reduce the dependency on firewood and traditional charcoal?
2 PROJECT BACKGROUND
The least well- off strata of the population, also called the communities at the Base of the Pyramid (BoP),
are caught in a vicious circle.
3 This vicious circle consists of relying on charcoal as their main source of
energy, triggering negative health outcomes, deforestation, increased greenhouse gas emissions, erosion,
flooding, decreased arable land, declining crop yields, and depressed incomes forcing reliance on
polluting, tree-consuming charcoal. According to the best available data
4, Charcoal is used by 90% of the
households from Port-au-Prince and other major cities, and the charcoal chain from production to final
consumption employs more than 150 thousand persons. Charcoal is made from trees, with a low
conversion efficiency of about only 20% (5 kg of wood for 1 kg of charcoal) and its production
contributes to degrade the local environment by adding pressure to the plant stand throughout the
countryside which is already over 98% deforested.
3
Information from the “Chabon Boul” project document.
4
Bureau of Mines and Energy: Haiti Energy Sector Development Plan 2007 - 2017
USAID.GOV “CHABON BOUL” PROJECT PERFORMANCE EVALUATION | 8
Viable alternative cooking technologies are not being adopted fast enough to stop or even slow
deforestation, and forest decline has led to a rise in charcoal prices, in part due to the rapidly growing
black market for illegal charcoal smuggled into Haiti from the Dominican Republic. In this broader
context, the dependency on charcoal and firewood becomes a major factor in the environmental
degradation of Haiti and poses a serious threat to the lives and livelihoods of Haitian citizens.
The Green Charcoal for Haiti activity was designed partly to address this problem by demonstrating that
cooking briquettes made from agricultural waste can be a viable, affordable, cost-effective alternative to
the use of traditional charcoal, that will help reducing deforestation in Haiti and increasing rural incomes.
Additionally, the use of green charcoal would reduce carbon emissions compared to the traditional
charcoal, and it burns somewhat cleaner, lessening the adverse health effects on its users.
2.1 PROJECT DESCRIPTION
The Green Charcoal for Haiti is a 24-month, $838,000 program implemented by CRH, a Haiti-based
for-profit social business affiliated with a U.S.-based non-profit organization, Carbon Roots International
(CRI). Since 2013, USAID/Haiti has supported Stage 1 and 2 grants (a total of $938,000) to CRI and
CRH through the (DIV) Annual Program Statement (APS) to support their plan to replace the use of
charcoal fuel in Haiti with a green alternative fuel.
The overall goal of the activity is to create sustainable jobs and reduce deforestation, with an
Intermediate Result of achieving financial sustainability at the briquette production factory. As presented
in the project’s Monitoring and Evaluation (M&E) Plan, the “Chabon Boul” Project hopes to achieve
three major and intertwined strategic objectives: 1) increase briquette production, 2) expand the retail
distribution network, and 3) increase sales of green charcoal briquettes. Green charcoal creates financial
sustainability through jobs, income, and value throughout the local value chain while achieving a
reduction in deforestation.
CRH’s business consists of four activities that comprise the green charcoal value chain:
1. Raw materials purchasing from local suppliers
The value chain begins with a network of smallholder farmers and micro‐entrepreneur agricultural
processors who earn added income by selling their agricultural waste biomass to CRH. In northern
Haiti, the primary biomass feedstock used is sugarcane bagasse. Carbon Roots Haiti pays the suppliers
for their waste, then transports it from the farm or processing facility to the production site.
2. Processing
At a central production facility, CRH staff sorts and dries the feedstock, then pyrolyzes (i.e. carbonize) it
into charcoal dust. Prior to February 2017, pyrolysis was achieved using handmade 55‐gallon batch kilns.
Utilizing funding from USAID, CRH began upgrading the pyrolysis process to use continuous-feed
retorts that also provide heat to streamline drying.
After pyrolysis, CRH staff mixes the char dust with binding agents, resulting in a char slurry. The slurry
is then pressed into dense briquettes using commercial roller briquette equipment, consisting of:
I. 9 | “CHABON BOUL” PROJECT PERFORMANCE EVALUATION
USAID.GOV
• A large batch mixer,
• A conveyor belt, and
• A commercial briquette pressing machine, which uses two opposing cylindrical molds to
compress char slurry into pillow briquettes.
After processing by the briquetting equipment, the briquettes are transferred to portable racks and
dried in the sun for 3‐ 5 days. Upon upgrading to a new pyrolysis process, CRH should be able to dry
briquettes in a matter of hours.
After drying, the briquettes are packed in re‐useable sacks that are ready for transport and sale.
3. Marketing
Most products available at local markets in Haiti are sold under brand names. However, due to the
decentralized nature of wood charcoal production in Haiti, there are no recognized nationwide brands.
This presents a competitive advantage for CRH by being able to produce and distribute green charcoal
centrally, allowing the business to sell green charcoal under the “Chabon Boul” brand name. Marketing
focuses on cost savings, and highlights that green charcoal is a locally‐ produced product that benefits the
environment. CRH engages in many marketing media, including:
• Television commercials and shows,
• Radio commercials,
• Banners and signs throughout the sales region,
• Signage on public transportation,
• Promotional events.
Due to limited income in the BoP, potential customers may be cautious to purchase new products, the
results of which they are unsure. To combat this tendency, CRH encourages consumption through
special offers and free samples, which has proven successful at spreading awareness and increasing sales
at new retail locations. For example, an individual distribution point selling green charcoal will drop the
cost of a marmite (roughly one kilogram of charcoal) 40% for several hours, doubling new customer
purchases during the sale. CRH continues to test different marketing strategies to determine the best
ROI
5 and scaling up those effective tactics. By following up with prospective buyers, they can emphasize
savings, appeal to widespread notions of civic duty, and tie CRH’s marketing to the Haitian
Government’s reforestation initiatives.
4. Distribution
CRH’s distribution strategy is three‐pronged:
5
ROI: Return on Investment
USAID.GOV “CHABON BOUL” PROJECT PERFORMANCE EVALUATION | 10
• Wholesale customers: CRH targets restaurants, informal roadside cooks, schools and
organizations, selling in 30kg sacks and providing delivery service to the customer.
• Women retailers: In Haiti, women traditionally sell charcoal at local markets. CRH’s second
distribution strategy reinforces this inclusion of women in market activities by selling green
charcoal briquettes to household users through a network of women retailers. These retailers
are “based” out of one of CRH’s distribution points (depots/boutiques), where they purchase
green charcoal in 30kg sacks, and then sell to household customers in smaller retail quantities.
• Direct Sales: Carbon Roots Haiti has launched branded brick‐and‐mortar green charcoal
boutiques, located in high‐traffic areas, and serve the household market directly. Generally,
household customers purchase in “ marmite” units, often patronizing the boutique daily. CRH
currently has boutiques in Port‐au‐Prince and Cap‐Haitian.
Beneficiaries of the project include:
• Local rum distillers and micro-agricultural entrepreneurs, who will earn significantly more than
the national minimum wage, and several times more than the national average daily income.
• Charcoal retailers, mostly women, who will sell green charcoal briquettes at a market discount
and still earn roughly 15% profit on their sales.
• End users, who will save between 25-40% of their income by using green charcoal.
2.2 THEORY OF CHANGE
CRH’s Theory of Change postulates that deforestation, rural poverty and unemployment, energy
demand, and low agricultural yields can be addressed through the deployment of a profitable social
business engaged in the production of green charcoal. This enterprise benefits a wide range of
stakeholders:
• Farmers monetize their agricultural waste by converting it to char dust and selling it to CRH
• Women retailers offer a highly- competitive product, enjoy higher profit margins, develop
business skills, and build a broad customer base
• Institutions such as schools and restaurants, and households have access to sustainable cooking
fuel at a price point that is cheaper than traditional charcoal
While the pathway to change is complex in a socioeconomic environment su ch as Haiti, a market-based
enterprise that manufactures products locally, for local consumption, is likely the most impactful and
sustainable solution.
3 EVALUATION METHODS A ND LIMITATIONS
3.1. EVALUATION METHODS
3.1.1 OVERVIEW
The evaluation team had to determine whether the “Chabon Boul” Project was able to achieve its
intended outcome, which is to produce a viable, affordable and cost-effectiveness product (cooking
briquettes) that can be used as an alternative for traditional charcoal in Haiti. The team through analysis
had to also help the mission to appreciate the overall impact of the project. To do this, the evaluation
team considered using the following methods:
I. 11 | “CHABON BOUL” PROJECT PERFORMANCE EVALUATION
USAID.GOV
a) Secondary data review, including all available project documentation: periodic reports,
project design document, documents on the various modifications (See appendices 1),
studies carried out within the framework of this project, annual plans, follow-up plans, M&E
plans, etc.
b) Key Informant Interviews (KII) and Focus Group Discussions (FGDs) with key stakeholders,
including Mission staff, CRH personnel, beneficiaries, local rum distillers and micro-
entrepreneur agricultural processors and other market actors;
c) Interactive workshop with CRH employees to discuss lessons learned from the project
implementation;
d) Cost Benefit Analysis.
Above methods were used separately and the findings have not been integrated until after data analysis.
Much of the document review took place first and findings from this step were used to inform the
design and implementation of key informant interview and focus group methods. The same evaluation
team was then involved in implementing key informant interview and focus group methods, and the
actual data collection and analysis happened congruently over the same period.
CHASE met first with the Carbon Roots Haiti personnel involved in monitoring the “Chabon Boul”
Project. It was an opportunity to 1) know how the project was doing from the implementers’
perspective, 2) to record long term issues regarding the project and the evaluation, and 3) to identify
other influential key stakeholders. This meeting also helped to determine specific geographical mapping
of activities.
Data collection was carefully planned in collaboration with Carbon Roots Haiti personnel.
3.1.2 DATA COLLECTION METH ODS
A. IN-DEPTH PROJECT DOCUMENT REVIEW AND COST- BENEFIT ANALYSIS
i. Literature review
CHASE personnel conducted an extensive review of the literature. The documents review help in
understanding both the theory of change behind the project and key project activities and results.
The evaluation team drew on existing quantitative and qualitative data collected during the literature
review to (1) refine sampling strategy and/or approach for collecting qualitative data, (2) design relevant
qualitative data collection tools, and (3) seek compelling evidence to answer the evaluation questions.
Relevant documents include, among others: the USAID/Haiti country strategy; “Chabon Boul” project
reports such as work plans; PMP; M&E plans; quarterly progress reports and technical reports; the
project proposal; and, documents relating to amendments. Ultimately, the literature review helped to
gather relevant information to produce and enhance the comprehensive evaluation design.
ii. Cost-Benefit Analysis
Cost-benefit analysis (CBA) techniques were to be used to compare the total costs of the activity with
its revenue, using only monetary units. This would enable the calculation of the net cost or benefit
associated with the production of green charcoal.
USAID.GOV “CHABON BOUL” PROJECT PERFORMANCE EVALUATION | 12
As a technique, CBA evaluates the overall impact of the activity in quantifiable and monetized terms by
adding up the total costs of an activity and comparing it against its total revenue. For this evaluation, Net
Present Value (NPV) of the project cost was to be compared with the net present value of its revenue.
Decisions would be based on whether there was a net revenue or cost to the approach, i.e. total
revenue less total costs. This comprehensive analysis takes a broad view of costs and benefits, including
indirect and longer-term effects.
This type of review typically begins with an exhaustive list of all the different costs that could arise, even
if some will be later excluded: fixed costs included equipment partially mortgaged, rent, advertising,
insurance, office supplies, etc. Variable costs included: personnel, training, vehicle (maintenance and
repair), fuel, product inputs, etc.
To find the business's profit, the team, with support from accounting and leadership teams, would add
up all of the total sales of green charcoal the Activity has made in a set period of time (one month) and
other revenues including (but not limited to) gain or loss on disposal. The team would then subtract any
amount of cash refunded to customers for returns or disputes to find an accurate figure for the total
income.
Once the team found accurate values for the Activity’s total income and expenses, calculating the profit
would simply be to subtract expenses from the income. The data would be calculated monthly on the
last six months and averaged to get the monthly figure.
It should be noted that the evaluation team was not provided the information necessary to achieve this
Cost Benefit Analysis
B. FOCUS GROUP DISCUSSIONS (FGDS) AND WORKSHOP
i. Focus Group Discussions
Focus Group Discussion was planned to be held during the data collection phase with relevant
stakeholders to obtain viewpoints and evidence to answer the evaluation questions. Small groups of
eight to 12 were set for a one- hour discussion around main topics identified in the design phase.
Candidates for focus groups discussions were the charcoal retailers. Please note, the evaluation team
was not able to conduct these focus groups.
These discussions would have helped determine the status of the project implementation and assess
whether the Green Charcoal Activity was able to achieve its intended outcome, to produce a viable,
affordable and cost-effectiveness product (cooking briquettes) that can be used as an alternative for
traditional charcoal in Haiti. These discussions would have highlighted the lessons learned.
ii. Workshop with CRH staff to determine lessons learned
A two-hour workshop was organized with Carbon Roots Haiti personnel to discuss about the
implementation and to document lessons learned. The purpose of documenting lessons learned was to
share and use knowledge derived from experience to promote the recurrence of desirable outcomes
and preclude the recurrence of undesirable outcomes.
This “Lessons Learned” session documented the cause of issues and the reasoning behind any corrective
action already taken to address those issues. For the identified ““Lessons Learned”” where no action
I. 13 | “CHABON BOUL” PROJECT PERFORMANCE EVALUATION
USAID.GOV
had yet been taken, the team determined next steps and to identified who will be responsible for
implementing those measures. Questions discussed during the session included the following:
• What was learned about the project in general? Did the delivered Green Charcoal meet the
specified requirements and goals of the project?
• What was learned about project management? Did the project management methodology work?
If not, why not?
• What was learned about communication? What changes would assist in speeding up in the
future while increasing communication?
• What was learned about budgeting? Were costs budgets met? If not, why not?
• What was learned about procurement? Was the schedule met? If not, why not?
• What was learned about working with sponsors?
• What was learned about working with customers? Was the customer satisfied with the green
charcoal? If not, why not?
• What was learned about what went well?
• What was learned about what did not go well?
• How will/was this incorporated into project? What could be done to improve the process?
C. SEMI-STRUCTURED INTERVIEWS WITH KEY INFORMANT
Interviews were conducted with key stakeholders and resources persons such as key CRH personnel,
local distillers of rum, end users such as CRH targets restaurants, informal roadside cooks, schools and
organizations, and branded brick‐and‐mortar green charcoal boutiques vendors. The main objective of
these interviews was to assess whether the project was 1) able to achieve its intended outcome, which
is to produce a viable, affordable and cost-effectiveness product, and 2) to discuss best practices and
lessons learned, keeping focus on seeking evidence to answer the evaluation questions.
Key stakeholders involved in the project activities and systems in place to boost green charcoal
production were visited during data collection.
Key Informant Interviews (KII) were conducted with:
- CRH staffs:
o To collect qualitative data about performance, get more insight about project
implementation, challenges and constraints on the field, and document lessons learned
(Question 1 and 2)
o To collect information on the functioning and achievements of the “Chabon Boul” project
from the implementer’s perspective (Question 1)
o To have information on what facilitated achievement of performance or what prevented
CRH from achieving the expected results (Question 1)
o To collect information on effective measures/decisions taken to reduce production costs
and increase the viability of the project (Question 1)
- Local rum distillers and Micro-Entrepreneur agricultural processors:
o Availability of sugarcane bagasse on a continuous basis (Question 1);
o Their transformation of sugarcane bagasse into char dust (Question 1);
o Their overall learning from the project (Question 2);
o Their level of satisfaction with the production of the Green Charcoal (Questions 1 and 2)
o How they compare this activity with the traditional charcoal production (Question 1).
USAID.GOV “CHABON BOUL” PROJECT PERFORMANCE EVALUATION | 14
- Green Charcoal end users (CRH targets restaurants, informal roadside cooks, schools and
organizations)
o To collect information on the ease of access to the product. (Question 1)
o To get more insight about their level of satisfaction with the use of Green Charcoal
(Question 1)
o To have information on how they compare this product with the traditional charcoal
(Question 1)
o Collect some suggestions for improving the project in the future (Question 1)
- Branded brick‐and‐mortar green charcoal boutique vendors
o To collect information on performance, get more insight about project implementation,
challenges and constraints in the field, and lessons learned (Questions 1 and 2);
o Difference in product sales prices compared to traditional charcoal and what can motivate
people to switch from traditional charcoal to Green Charcoal (Question 1);
o Their level of satisfaction with the sale of the Green Charcoal and the type of feedback
they have from customers (Questions 1 and 2).
o Above described methods and techniques were used to collect data and provide answers
for the two (2) evaluation questions. An exhaustive list of planned KII is presented in the
summary table of data collection.
3.1.3 DATA SYNTHESIS AND ANALYSIS
Parallel data analysis was conducted, weighting answers from various sources. Data from each source
were analyzed independently using content analysis methodology, and the findings were integrated and
triangulated into coherent statements about the evaluation questions. A synthesis framework was
developed to coherently address the wealth of information yielded daily by the key informants’ interview
reports. Evidence was clustered into findings that would lead to valid and relevant conclusions and
recommendations about the evaluation questions.
Triangulation of data from a variety of sources, including both quantitative and qualitative data from
literature review, qualitative data collected on the field, was valued such that the evaluation produced
evidence-based findings, conclusions, and recommendations.
The contents of the discussion were examined to discover the meaning and its particular implications
for the evaluation questions. Every effort to interpret focus group/key informant interview data
occurred through analysis of content.
3.2 LIMITATIONS
The focus groups scheduled with retailers could not take place because this group has been demobilized
for several months and according to the managers contacted, it was not possible to have them for
several semi-structured meetings as planned.
The cost-benefit analysis was not performed as planned in the design document/evaluation plan.
According to the director and other managers contacted, the nature of the contract with the donor and
the type of business involved meant that the director was not obliged to share cost information incurred
during the operations and chose not to. Therefore, the analysis considers only the limited information
available in reports of milestones or collected during field interviews. No accounting documents were
shared with the evaluation team.
I. 15 | “CHABON BOUL” PROJECT PERFORMANCE EVALUATION
USAID.GOV
4 FINDINGS, CONCLUSION S AND RECOMMENDATION S
4.1 FINDINGS
4.1.1 NET REVENUE FROM THE GREEN CHARCOA L ACTIVITY
The production of Chabon Boul in its present form is not a viable business. CRH, a small enterprise,
producing green charcoal (the "Chabon Boul") in the northern department of Haiti, has not been
generating positive net revenue, despite USAID support. According to the project managers, the income
from the sale of green charcoal, which represents the only source of revenue for the company, is always
less than the sum of the expenses incurred by the activity. The company is now closed due to lack of
financial means.
4.1.2 FUNDING, TECHNOLOGY AND SKILLS
The goals for the USAID- awarded 24-month grant period were to:
• Grow revenue to achieve positive cash flow at the north Haiti production facility
• Upgrade production equipment to commercialize all processing, from pyrolysis to briquette and
drying.
• Raise private sector financing for capital expenditures on production and transport equipment
A large part of the amount granted was used, as planned, for the acquisition of modern equipment. In
early 2017, Carbon Roots Haiti (CRH) installed and commissioned a commercial pyrolysis unit that
convert sugarcane bagasse to charcoal, replacing the organization’s reliance on hand-made 55-gallon
barrel kilns. The pyrolysis unit is a BigChar 1200 model made by Pyrocal Ltd in Australia. Several training
sessions were organized on the use of equipment. According to the members of the production team,
these orientation sessions gave them the necessary capacity to use the machines.
The BigChar equipment was purchased with the expectation that it could convert bagasse into green
charcoal, and provide clean, high heat to dry both bagasse and green charcoal briquettes coming off the
production line. Unfortunately, it was discovered that the BigChar cannot reliably dry the bagasse or
freshly- manufactured green charcoal. The project relies on three to five days of solar power to dry
both the bagasse and the freshly released charcoal from the commercial briquette pressing machine.
With no assurances on weather, an alternative for drying and storage must be found.
According to document review and various meetings in the field, CRH received all the funds allocated to the
project but the income from the sale of coal still decreased with the financing. According to the project
managers, to reach the break-even point, the company must have at least five equipment units (BigChar)
like the one bought with USAID funds. Today the company is looking for a grant of about 2.5 million
USD to accomplish this benchmark.
In the project design document, it was clearly stated that the activity would not be profitable with this
second grant granted by USAID. The project designers acknowledged that additional equipment units
were needed for the activity to be profitable. As expected, and according to project managers, the
acquisition of the new equipment (the BigChar unit) was more like a demonstration of what the
company could do with a more appropriate technology. The acquisition of the new equipment also puts
the company in a mode of operation where it can become scalable.
USAID.GOV “CHABON BOUL” PROJECT PERFORMANCE EVALUATION | 16
Figure 1. Monthly sales for 3 months (Source: CRH Milestone reports)
The enterprise relies only on green charcoal sales for revenues. In the past, the char dust was given free
to farmers but sold to some agricultural sector institutions as organic fertilizer.
CRH reported that increasing the price of the ‘Chabon Boul’ product to increase revenue is not a viable
option. Currently, an equal volume of the two brands of charcoals (traditional charcoal and Chabon
Boul) are sold at the same average price. The 30-kg bag that looks like most of traditional charcoal bags
sells for 500 gourdes
6. According to various stakeholders, any increase in the price of “Chabon Boul”
higher than that of traditional charcoal will scare away the green charcoal potential buyers.
As can be seen in Figure 1, monthly sales prior to the current shutdown are well below the projection
of a $60,000 monthly sale limit to achieve profitability.
With the acquisition of the new equipment, the company has reduced its staff. Therefore, the costs of
the operations were reduced. However, the company still operates with more than twenty employees
in addition to other expenses such as carrying bagasse (about 350 USD / month), taxes, fuel, repairs, etc.
Since the company did not aim for profitability with this second grant, the numbers featured in Figure 1
do not come as a surprise. However, it is difficult for the evaluation team to provide strong conclusions
6
500 Gourdes is the equivalent of 7.91 USD (1:63.18)
209
331
508
33
1081
Apr-17 May-17 Jun-17 Jul-17 Total
Monthly sale in US Dollar
I. 17 | “CHABON BOUL” PROJECT PERFORMANCE EVALUATION
USAID.GOV
and recommendations without access to information about the company’s monthly expenditures. There
is no way to determine how increasing production will affect the future profitability of CRH.
4.1.3 PRODUCTION
As mentioned earlier, this second grant enabled CRH to acquire new equipment and at the same time
enabled the company to move from a traditional processing to a less labor-intensive industrial
processing. Today, the production team is reduced from more than 34 employees’ pre-modernization to
14 with the arrival of BigChar.
Figure 2. Sales in volume from April to July 2017
According to CRH managers, the green charcoal production has decreased with the USAID grant. Prior
the BigChar installation, the company produced about 5 to 6 tons of charcoal per work day; now the
charcoal production is 1 to 1.5 tons per work day. As production has decreased, less green charcoal is
sold with support received from USAID. To restore the production levels to 6 tons, the machine would
need to run 24 hours a day. While it has the capacity, a considerable limitation is the necessary
manpower. This approach would require adding several eight-hour shifts and sufficient security and
transportation; a considerable challenge in that location.
While the company usually sells everything it produces, stakeholders in the field report unreliable
production output. Repeated breakdowns cause interruptions in the supply for days and weeks at a
time. Once the issues are resolved and the supply is restored, additional marketing and sales resources
are needed to publicize that the company is operational again.
Production varies with seasons as well since solar energy is required to dry the final products.
Unfortunately, when briquettes are needed most during the rainy season, production decreases due to
the lack of sunlight needed to dry bagasse and green charcoal. The company tried an alternative means
to dry the briquettes without much success. The machine bought for this purpose burnt too much
briquettes while charcoals inside the device failed to receive the amount of heat needed.
28
51.5
72
5
156.5
Apr-17 May-17 Jun-17 Jul-17 Total
Monthly sale in number of 30 Kg sacks
USAID.GOV “CHABON BOUL” PROJECT PERFORMANCE EVALUATION | 18
The company’s large distribution network was reduced with the decrease in production and sales. The
green charcoal produced by the company was sold on site or through the few kiosks located in the city
of Cap-Haitian and its suburbs. The “Chabon Boul” is no longer sold by street vendors and motorcycles.
More recently, a new distribution network has been established in Port-au-Prince and absorbs more
than 50% of the production, according to the sales manager.
On the left is the char and the "BigChar" machine and on the right, the Pyrolysis hearth where refined bagasse is
transformed into "char"
I. 19 | “CHABON BOUL” PROJECT PERFORMANCE EVALUATION
USAID.GOV
Machine used to enhance the sugarcane bagasse
4.1.4 RAW MATERIALS AVAILABILITY
Originally, during the project design, several raw materials including agricultural waste and sugar cane
bagasse were targeted for green charcoal production. In the northern plain, agricultural waste is not as
continuously available as cane bagasse. According to several informants, the bagasse available can readily
support several green charcoal factories the size of CRH. For example, the head of one of the big
distilleries visited in the area claims that it is possible to provide CRH up to 10 carts of bagasse a day
when his business is running at full capacity (this quantity of bagasse can meet the need of CRH for the
day). With dozens of distilleries in the northern plain, production has suffered just one slowdown due to
a scarcity of bagasse since the launch of the activity. That time was during the prolonged drought period
of 2015. Carriers had to travel several tens of kilometers to supply the factory with bagasse. Stocks of
the various usual suppliers were exhausted because of low sugarcane production.
A disadvantage in the use of bagasse lies in the fact that it must be dried for use. In the rainy season, it is
difficult to dry bagasse collected because the drying done under the sun. Even in good weather, drying
bagasse in open air can take several days, delaying the green charcoal production.
The project has been successful in promoting bagasse as a byproduct of distilleries. Distilleries are small
companies that make clairin from sugar cane, an edible alcohol with a concentration of about 20
o.
Normally, 20% of the bagasse is used as energy source to boil sugarcane juice transforming it into clairin,
and the remaining 80% goes to waste. As an effect of CRH activities, bagasse now has a price; the
suppliers who usually burned it before to get rid of it, now recognize its value and haggle regarding the
price. Distillery owners complained as well that the price paid by CRH for the cart of bagasse is not the
same everywhere. A bagasse cart costs on average 500 gourdes (7.91 USD).
At the beginning of operations, kits were provided to bagasse suppliers who were engaged in preparing
the char themselves. It was soon realized that the char prepared in the 55- gallon metal drums was of
poor quality which would have a direct impact on the quality of the finished product. Drums of char
Machine to
refine the
sugarcane
bagasse
USAID.GOV “CHABON BOUL” PROJECT PERFORMANCE EVALUATION | 20
were bought according to their weight and some suppliers fraudulently placed stones in the drums to
increase the weight of the char to gain more money. The decision was then made to centralize the
management of bagasse combustion and char production at the company level which increased the
quality of the product and efficacy of the resources.
Starch is another essential input in the production of green charcoal. According to information
collected, locally produced starch made from cassava, especially in “cassaveries,
7” was used initially.
Again, the company would face some suppliers who mixed starch with other products (flours) to
increase their earnings. The mixture reduces the quality of the starch and consequently the quality of
the resulting green coal. The decision was then made to source corn starch from major US-based
industries, a fruitful initiative according to CRH managers. They reported that the cost associated with
the acquisition of corn starch is relatively low and can be sustained by the company once the break- even
point is reached.
4.1.5 QUALITY AND MARKETING
Thereafter the launch of the project, several types of marketing were used to reach potential consumers
including radio advertising, banners, posters, and home visits, followed by distribution of small quantities
of charcoal to sample. Visits with potential buyers proved to be the most beneficial. Unfortunately, all
marketing activities ceased very soon as the demand outpaced the supply.
According to stakeholders, consumers are generally satisfied with the price and the quality of the
product. The quality of “Chabon Boul” has increased gradually with several key decisions made by the
company's management. The decision to centralize the production of the "char" has increased the
quality of the resulting coal. The acquisition of new equipment (BigChar and others), allows for better
control over the partial combustion of bagasse resulting in a better char dust. The briquettes are no
longer produced by hand as they were at the beginning and the decision to change shift from flour-
tainted cassava starch to corn starch allows for tighter quality control.
According to the consumers interviewed, Chabon Boul is easy to use. There is no need to buy a
different, special stove. They estimated that the Chabon Boul intensified the heat produced resulting in a
shorter cooking time. Also reported was the Chabon Boul does not produce smoke that darkens
cooking utensils. Finally, unlike traditional, bagged wood charcoal, the Chabon Boul briquettes remain
intact in the bag.
However, consumers visited also claim that Chabon Boul produces a lot of ash. The head of an
education center, a very good customer of Chabon Boul, claims to have stopped using it because it
produces too much ash. According to the information gathered, if you do not pay attention, the large
amount of ash produced is susceptible to blowing around, dirtying the kitchen and beyond.
7
A place where cassava or other cassava products are made.
I. 21 | “CHABON BOUL” PROJECT PERFORMANCE EVALUATION
USAID.GOV
4.2 CONCLUSIONS
According to all the information shared with the evaluation team and in line with what were planned,
the “Chabon Boul” business did not break even with the grant they received from USAID. Already in
the fourth modification, it is clearly stipulated that the project did not intend to achieve profitability with
this grant and that it would need an additional funding. It said that the funds from this second grant from
USAID should be used to install one new pyrolysis retort, which will serve as a demonstration of
technology and scale to investors, who would then lend and invest another $1 million to bring the
production factory to a sufficient scale to reach financial sustainability. As a result of decreased
production and sales, projections have been further modified or adjusted as the company now needs a
grant of approximately $ 2.5 million to achieve profitability. According to managers, in its current status,
the company will still need external support to survive.
Despite the repeated work stoppages, the company has a relatively faithful client base. While there is
the chance that CRH may lose some potential customers and market share to propane, the main raw
material, sugarcane bagasse, is available in a quantity largely sufficient to operate the current enterprise
and after an increase in size. Two major drawbacks with bagasse are 1) in wet weather bagasse cannot
be used due to lack of sunshine, and 2) in times of drought, there is shortage of bagasse. The quality of
the product, according to the majority of the customers, is good and they are generally happy. The
inconvenience of too much ash is offset by a competitive price, relatively shorter cooking time, and no
smoke.
It is important to note that green coal as produced by the project "chabon boul" has a future in the
North region. Customers are satisfied with the quality and even without marketing activities the demand
for the product continues to increase. Finally, even with the limited information that was communicated
by the project, the evaluation team identified serious inadequacies in the financial projections of the
activity.
4.3 RECOMMENDATIONS
The evaluation team recommends that the industry:
• Has better expense appraisal to better estimate the break- even level and increase the level of
transparency in the communication of financial information;
• Regularizes the “Chabon Boul” production in order to increase customer loyalty (repeated
shutdowns due to energy or other problems affect the market);
• Regularizes the price of the bagasse cart to reduce frustrations;
• Continues to improve the quality of the product (specifically the complaint of ashes during the
burning process);
• Find better ways to dry bagasse and charcoals (Drying in open air is unreliable during raining
seasons).
4.4 SYNTHESIS OF LEARNIN G FROM THE IMPLEMENTATION OF THE “CHABON BOUL”
ACTIVITY
The “Lessons Learned” workshop offered an opportunity for reflection after the completed project. It
was valuable to reflect on what worked well with the project and what could be improved upon from
the perspective of representatives from the project team. The evaluation team worked with a reduced
USAID.GOV “CHABON BOUL” PROJECT PERFORMANCE EVALUATION | 22
number of CRH staff due to the difficult circumstances faced by the enterprise. Project documents were
consulted as well in this sense.
Leadership. One of the main lessons learned revolves around decisions made by the management team.
One such decision was the rotation of the production team for better results and better personnel
management. The multiple tasks performed by the production team vary with some being far more
demanding than others. There is the handling of the machine that refines dried bagasse, the preparation
of the starch, the mixture of char, starch and other materials needed, monitoring the temperature of the
BigChar to make sure everything is working fine. Since the company decided to give the same salary to
everyone, it initially created frustration. The managers chose to rotate the 14-member production team
and better distribute the workload. This improved the dynamics of the team and reduced their
frustration.
Research. Consistent conversations with consumers lead to ongoing research on how to improve the
product to meet their requirements and achieve client satisfaction. Resulting improvements in char
production include smokeless green charcoal and improved materials in its composition.
Marketing. As mentioned above, several marketing methods have been used by the company to
promote the "Chabon Boul." The marketing method of visiting potential consumers of the product and
providing a sample amount to test at home yielded the best results; people like to test the product
before making the decision to buy. After having tested it, the purchase decision followed almost
automatically. Insufficient product supply was a barrier to marketing efforts.
Sales strategy. Imitating the traditional charcoal marketing circuit directly in competition with the
"Chabon Boul," sales managers sought to understand and then facilitated a rapid integration of the
market. In general, traditional charcoal is available in depots in peri-urban areas, in the open markets
where it is distributed in detail by retailers, through street vendors who use animal backs or their heads
to transport them to consumers, etc. The "Chabon Boul" brought small touches of innovation, such as
initially selling it in wheelbarrows through the streets.
During the rainy season, the lots cannot be exposed in the open and the traditional charcoal is generally
sold in bags during these periods - "Chabon Boul" followed the same method.
Quality control. Performing quality control throughout the entire production chain increases the
quality of the final product. This quality control cannot be trusted to the many actors in the production
chain, but by a company manager with control mechanisms implemented at all stages. CHR had initially
trained distillery partners to produce the char the company would buy from them according to weight.
55-gallon metal drums were distributed to the managers of various distilleries; the partners added other
heavier products to the char and even stones to increase the weight of the drums. Not only did this
reduce the quality of the coal but also damaged the machines on several occasions. Centralized
production of char at the company has subsequently increased the quality.
Repeated stoppages of production. Repeatedly stopping production is detrimental to the range of
customers the industry would like to have. Stoppages were most often due to equipment breakdown or
problems related to lack of funds. Before starting operations again, the company must take some time
to re-engage customers or even relaunch some advertising incurring additional costs. According to the
participants in the Lessons Learned workshop, consumers who simply switched to traditional charcoal
I. 23 | “CHABON BOUL” PROJECT PERFORMANCE EVALUATION
USAID.GOV
could easily revert back to Chabon Boul unlike those who may have converted their kitchens to
propane. Advertisements for "Chabon Boul" tout that the environment is protected by using it. But
when motivated consumers can no longer find this "Chabon Boul" and are forced to use traditional
charcoal again, they become disenchanted by the company. According to the participants, it would be
good, if possible, to maintain a small production core in order to keep the customers abreast of ongoing
activities and smooth transitions between stoppages.
I. 1 | “CHABON BOUL” PROJECT PERFORMANCE EVALUATION
USAID.GOV
ANNEXES
A1. SCOPE OF WORK
PURPOSE OF THE EVALUATION
The purpose of the evaluation is to assess whether the Green Charcoal Activity was able to achieve its
intended outcome, which is to produce a viable, affordable and cost-effectiveness product (cooking
briquettes) that can be used as an alternative for traditional charcoal in Haiti. This evaluation shall
provide pertinent information to USAID and its partner on the overall impact of the Green Charcoal
Activity shall serve as a basis for considering whether or not this activity can be replicated on a larger
scale. The primary stakeholders for this evaluation include: USAID/Haiti, Carbon Roots International
(CRI), Carbon Roots Haiti (CRH).
SUMMARY INFORMATION
Strategy/Project/Activity Name
Green Charcoal for Haiti
Implementer
Carbon Root Haiti S.A (CRH)
Cooperative Agreement/Contract #
AID-521-F-15-00005
Total Estimated Ceiling of the
Evaluated Project/Activity(TEC)
S838,000.00
Life of Activity
[June 2015- May 2017]
Active Geographic Regions
[North]
Development Objective(s) (DOs)
[Economic Security Increased]
USAID Office
Economic Growth and Agricultural development
USAID.GOV “CHABON BOUL” PROJECT PERFORMANCE EVALUATION | 2
BACKGROUND
A. Description of the Problem, Development Hypothesis (es), and Theory of Change
According to the best available data, over 90 percent of Haitian households use charcoal – produced
from burning wood - as their primary source of energy. This dependency on charcoal and firewood
propels destructive effects such as, negative health outcomes, deforestation, increased greenhouse gas
emissions, erosion, flooding, decreased arable land, declining crop yields, and reduced incomes—thereby
reinforcing reliance on polluting, tree-consuming charcoal. Viable alternative cooking technologies are
not being adopted fast enough to stop or even slow deforestation, and forest decline has led to a rise in
charcoal prices, in part due to the rapidly growing black market for illegal charcoal smuggled into Haiti
from the Dominican Republic. In this broader context, the dependency on charcoal and firewood
becomes a major factor in the environmental degradation of Haiti and poses a serious threat to the lives
and livelihoods of Haitian citizens.
The Green Charcoal for Haiti activity was designed to address this problem by demonstrating that
cooking briquettes made from agricultural waste can be a viable, affordable, cost-effective alternative to
the use of traditional charcoal, that will help reducing deforestation in Haiti and increasing rural incomes.
Additionally, the use of green charcoal would reduce carbon emissions compared to the traditional
charcoal, and it burns somewhat cleaner, thus providing some health benefits for its users.
B. Summary Strategy/Project/Activity/Intervention to be evaluated
The Green Charcoal for Haiti is a 24-month, $838,000 program implemented by CRH, a Haiti-based
for-profit social business affiliated with a U.S.-based non-profit organization, Carbon Roots International
(CRI). Since 2013, USAID/Haiti has supported Stage 1 and 2 grants (a total of $938,000) to CRI and
CRH through the Development Innovations Ventures (DIV) Annual Program Statement (APS) to
support their plan to replace the use of charcoal fuel in Haiti with a green alternative fuel.
Graphic 1 below summarizes the result framework of the Green Charcoal for Haiti activity as presented
in the project’s Monitoring and Evaluation (M&E) Plan. As illustrated, the overall goal of the activity is to
create sustainable jobs and reduce deforestation, with an Intermediate Result of achieving financial
sustainability at the briquette production factory. To attend this goal, the project has three intertwined
strategic objectives: 1) Increase briquette production, 2) Expand retail distribution network, 3) Increase
sales of green charcoal briquettes. Every ton of green charcoal replaces destructive wood charcoal, and
creates jobs, income, and value all along the local value chain. In this framework, achieving financial
sustainability results in more jobs, higher incomes, and a reduction in deforestation.
To achieve its strategic objectives, CRH has designed the project around 3 specific core activities:
1) Activity 1 consists of the procurement of agricultural waste supplied by micro- agricultural
entrepreneurs and local rum distilleries. CRH has established sourcing agreements with the local
distillers and the local farmers, who are paid for supplying the sugarcane bagasse to CRH. A
group of farmers is then trained by CRH to burn and convert the bagasse into char dust, at
CRH’s factory site in Quartier Morin. CRH currently has a network of over 100 active char dust
suppliers in Northern Haiti.
I. 3 | “CHABON BOUL” PROJECT PERFORMANCE EVALUATION
USAID.GOV
2) Activity 2 consists of the production of the green charcoal briquettes. Roughly 90% of the char
collected is run through a grinder and crushed to dust. This char dust will then be mixed with
starch into a slurry, and run through commercial roller briquette equipment that produces
roughly 2,000 kilograms of green charcoal briquettes per day. The resultant green charcoal
briquettes are dried for 3-5 days, and then packaged for transport and sale.
3) Activity 3 consists of the sales of the briquettes in the local markets, using three main channels:
a) negotiated contracts with existing charcoal wholesalers, who have their own sophisticated
distribution networks, b) CRH-branded distribution points and boutiques, established in Cap
Haitian and Port-au-Prince, c) a network of individuals who are trained to become independent
mobile street retailers. Carbon Roots Haiti also sells to individual consumers of charcoal in and
around Cap-Haitien through several distribution points and boutiques. At local markets in Cap
Haitien, charcoal is sold by women trained by CRH to become mobile street retailers.
Beneficiaries of the project include:
- Local rum distillers and micro-agricultural entrepreneurs, who will earn significantly more than
the national minimum wage, and several times more than the national average daily income.
- Smallholder farmers who are trained as part-time producers of charcoal dust, and will earn
additional earnings from producing the char at the CRH facility.
- Charcoal retailers, mostly women, who will sell green charcoal briquettes at a market discount
and still earn roughly 15% profit on their sales.
- End users, who will save between 25-40% of their income by using green charcoal.
Graphic 1: Summary of Green Charcoal for Haiti Result Framework
USAID.GOV “CHABON BOUL” PROJECT PERFORMANCE EVALUATION | 4
C. Summary of the Project/Activity Monitoring, Evaluation, and Learning (MEL) Plan
It is important to underline that no baseline study had been conducted at the inception of this program.
However, as part of the M&E Plan, the activity collected baseline data and key monitoring indicators to
track the progress of the program towards meeting the expected results. From the award date to
today the program has achieved the following results, as of September 2016:
• 3.95 tons of briquettes produced daily on average, from 0.5 tons at the beginning of the
project.
• 41 direct jobs, including CRH staff, from 45 jobs at the beginning of the project.
• 5 active distribution points, from a total of 6 at the beginning of the project.
• 41 indirect jobs created, including street retailers, from 72 at the beginning of the project.
• $86,157 of sales revenue, compared to $8,815.32 at the beginning of the project.
• $3,100.8 of supplier earnings, compared to over $12,000 at the beginning of the project.
• 1,936 tons of wood saved, compared to over 104.9 tons at the beginning of the project.
Below is a list of documents which will be useful to this evaluation. Soft copies of these documents will
be handed to the evaluation team in due time.
1. Activity program description and any modifications made to it.
2. Activity Monitoring and Evaluation Plans
3. Activity work plan
4. Milestone Reports
EVALUATION QUESTIONS
1. To what extent the Green Charcoal for Haiti Project was able to achieve a positive net revenue? If
yes, what were the most important factors contributing to this achievement? If not, what were the main
constraints leading to this non- achievement?
2. What lessons learned can be derived from the Green Charcoal for Haiti business model to reduce
the dependency on firewood and traditional charcoal?
EVALUATION DESIGN AND METHODOLOGY
It is expected that the evaluation team propose a research design to address the evaluation questions
and a plan for collecting and analyzing the data. Given the time and the nature of the evaluation
questions, the evaluation design should be based solely on a combination of qualitative method
techniques. Key informant interviews, focus group interviews, field observation, and in-depth review of
project documents are among the techniques that the evaluation team should consider when addressing
the evaluation questions.
I. 5 | “CHABON BOUL” PROJECT PERFORMANCE EVALUATION
USAID.GOV
The proposed evaluation design should:
(1) Draw on existing quantitative and qualitative data (e.g., implementing partners' quarterly reports
and data) as well as new qualitative data collection and analyses (e.g., analysis of data collected
through interviews, focus groups, and field observation);
(2) Describe the methodology and/or approach for collecting the data;
(3) Use an appropriate combination of mixed methods to analyze both quantitative and qualitative
data -- e.g., triangulation of data from a variety of sources -- such that the evaluation produces
findings, conclusions, and recommendations grounded in evidence; and
(4) Include steps the evaluator will take to assess and describe the quality of the data used for the
evaluation.
DELIVERABLES AND REPORTING REQUIREMENTS
1. Evaluation Work plan: Within 1 week of the award of the contract, a draft work plan for the
evaluation shall be completed by the lead evaluator and presented to the Contracting Officer’s
Representative (AOR/COR). The work plan will include: (1) the anticipated schedule and logistical
arrangements; and (2) a list of the members of the evaluation team, delineated by roles and
responsibilities.
2. Evaluation Design: Within 1 week of approval of the work plan, the evaluation team must submit
to the Agreement Officer’s Representative/Contracting Officer’s Representative (AOR/COR) an
evaluation design (which will become an annex to the Evaluation report). The evaluation design will
include: (1) a detailed evaluation design matrix that links the Evaluation Questions in the SOW to
data sources, methods, and the data analysis plan; (2) draft questionnaires and other data collection
instruments or their main features; (3) the list of potential interviewees and sites to be visited and
proposed selection criteria and/or sampling plan (must include calculations and a justification of
sample size, plans as to how the sampling frame will be developed, and the sampling methodology);
(4) known limitations to the evaluation design; and (5) a dissemination plan.USAID/Haiti program
and technical offices and relevant stakeholders are asked to take up to 10 business days to review
and consolidate comments through the COR. Once the evaluation team receives the consolidated
comments on the initial evaluation design and work plan, they are expected to return with a revised
evaluation design and work plan within 5 days.
3. Final Presentation: The evaluation team is expected to hold a final presentation in person to
discuss the summary of findings and recommendations to USAID. This presentation will be
scheduled as agreed upon after the evaluation fieldwork.
4. Draft Evaluation Report: The draft evaluation report should be consistent with the guidance
provided in Section IX: Final Report Format. The report will address each of the questions
identified in the SOW and any other issues the team considers to have a bearing on the objectives
of the evaluation. Any such issues can be included in the report only after consultation with USAID.
The submission date for the draft evaluation report will be determined in the evaluation work plan.
Once the initial draft evaluation report is submitted, Program and EGAD offices will have 10
business days in which to review and comment on the initial draft, after which point the COR will
submit the consolidated comments to the evaluation team. The evaluation team will then be asked
to submit a revised final draft report 10 business days hence, and again the Program and EGAD
offices will review and send comments on this final draft report within 5 business days of its
submission.
USAID.GOV “CHABON BOUL” PROJECT PERFORMANCE EVALUATION | 6
5. Final Evaluation Report: The evaluation team will be asked to take no more than 10 business days
to respond/incorporate the final comments from the aforementioned USAID offices. The evaluation
team leader will then submit the final report to the COR. All project data and records (including
Focus Group and Key Informant summary reports) will be submitted in full and should be in
electronic form in easily readable format, organized and documented for use by those not fully
familiar with the intervention or evaluation, and owned by USAID.
EVALUATION TEAM COMPOSITIO N
The Evaluation Team shall comprise of an evaluation Team Leader (TL).
The Team Leader (TL) is ultimately responsible for the overall management of the evaluation team and
the final products, in conformity with this Scope of Work. The TL must be an experienced evaluation
expert, with a documented track record of 10 years’ experience in the field of evaluation. The TL shall
also have demonstrated experience in evaluating finance-related projects. The TL shall have a Master’s
Degree in Economics, environment, or other related field and must possess excellent writing and
interpersonal skills. The Team Leader will be responsible for planning the evaluation, coordinating the
implementation of the evaluation, assigning evaluation responsibilities and tasks, and authoring the final
evaluation report. He/she must be fluent in English and French.
The Team Leader may propose additional staff (with CVs) to carry out this evaluation.
All team members will be required to provide a signed statement attesting to a lack of conflict of
interest or describing any existing conflict of interest. The evaluation team shall demonstrate familiarity
with USAID’s evaluation policies and guidance included in the USAID Automated Directive System (ADS) in
Chapter 200.
EVALUATION SCHEDULE
Timing (Anticipated
Months or Duration)
Proposed Activities
June 1 to June 16, 2017 Preparation of the work plan and evaluation design
June 19 June 30 USAID review of the work plan and evaluation design
July 3 to July 14 Data Collection
July 17 to July 21 Data Analysis
I. 7 | “CHABON BOUL” PROJECT PERFORMANCE EVALUATION
USAID.GOV
FINAL REPORT FORMAT
The evaluation final report should include an abstract; executive summary; background of the local
context and the strategies/projects/activities being evaluated; the evaluation purpose and main evaluation
questions; the methodology or methodologies; the limitations to the evaluation; findings, conclusions,
and recommendations. For more detail, see “How-To Note: Preparing Evaluation Reports” and ADS
201mah, USAID Evaluation Report Requirements. An optional evaluation report template
is
available in the Evaluation Toolkit.
July 24 to August 4 Report writing
August 7 to August 18 USAID review of Draft Report
August 20 to August 24 Incorporate USAID comments and prepare Final Report
ESTIMATED LOE IN DAY S
Position Preparation Travel to/from
Northern
region/PAP
In-Country
Data Collection
Finalization
of Report
Total
LOE in days
Team Leader 10 2 15 20 47
Data collector 0 2 15 0 17
Data collector 0 2 15 0 17
Totals 10 8 60 35 113
USAID.GOV “CHABON BOUL” PROJECT PERFORMANCE EVALUATION | 8
The executive summary should be 2–5 pages in length and summarize the purpose, background of the
project being evaluated, main evaluation questions, methods, findings, conclusions, and
recommendations and lessons learned (if applicable).
The evaluation methodology shall be explained in the report in detail. Limitations to the evaluation shall
be disclosed in the report, with particular attention to the limitations associated with the evaluation
methodology (e.g., selection bias, recall bias, unobservable differences between comparator groups, etc.)
The annexes to the report shall include:
• The Evaluation SOW;
• Any statements of difference regarding significant unresolved differences of opinion by funders,
implementers, and/or members of the evaluation team;
• All data collection and analysis tools used in conducting the evaluation, such as questionnaires,
checklists, and discussion guides;
• All sources of information, properly identified and listed; and
• Signed disclosure of conflict of interest forms
for all evaluation team members, either attesting
to a lack of conflicts of interest or describing existing conflicts of.
• Any “statements of difference” regarding significant unresolved differences of opinion by
funders, implementers, and/or members of the evaluation team.
• Summary information about evaluation team members, including qualifications, experience, and
role on the team.
CRITERIA TO ENSURE THE QUALITY OF THE EVALUATION REPORT
Per ADS 201maa, Criteria to Ensure the Quality of the Evaluation Report, draft and final
evaluation reports will be evaluated against the following criteria to ensure the quality of the evaluation
report.
8
• Evaluation reports should represent a thoughtful, well-researched, and well-organized effort to
objectively evaluate the strategy, project, or activity.
• Evaluation reports should be readily understood and should identify key points clearly, distinctly,
and succinctly.
• The Executive Summary of an evaluation report should present a concise and accurate
statement of the most critical elements of the report.
• Evaluation reports should adequately address all evaluation questions included in the SOW, or
the evaluation questions subsequently revised and documented in consultation and agreement
with USAID.
8 See ADS 201mah, USAID Evaluation Report Requirements and the Evaluation Report Review
Checklist from the Evaluation Toolkit for additional guidance.
I. 9 | “CHABON BOUL” PROJECT PERFORMANCE EVALUATION
USAID.GOV
• Evaluation methodology should be explained in detail and sources of information properly
identified.
• Limitations to the evaluation should be adequately disclosed in the report, with particular
attention to the limitations associated with the evaluation methodology (selection bias, recall
bias, unobservable differences between comparator groups, etc.).
• Evaluation findings should be presented as analyzed facts, evidence, and data and not based on
anecdotes, hearsay, or simply the compilation of people’s opinions.
• Findings and conclusions should be specific, concise, and supported by strong quantitative or
qualitative evidence.
• If evaluation findings assess person- level outcomes or impact, they should also be separately
assessed for both males and females.
If recommendations are included, they should be supported by a specific set of findings and
should be action- oriented, practical, and specific.
USAID.GOV “CHABON BOUL” PROJECT PERFORMANCE EVALUATION | 10
A2. DATA COLLECTION TOOLS
Focus group with Green Charcoal retailers
Thank you for agreeing to participate. We are very interested in hearing your views on the Green
charcoal for Haiti Activity. We hope to learn things that will orient interventions for future
programming.
All that will be said during the one-hour meeting has great value and we would like the opinion of each
of you on each question. If you do not want to answer a question, it is your right not to respond.
However, be certain that the information provided is completely confidential and will only be used for
one purpose: to help us understand the situation of the “Chabon Boul” Project. With your permission,
we will take note of everything that was said during the meeting. We strongly wish that you attend the
meeting. You just have to raise your hand.
1. What do you know about the “Chabon Boul” project?
2. How did you find out this information?
3. How were you selected as retailers? Did you sell traditional charcoal before?
4. How do you participate in the project? Which activities were implemented?
5. For the last six months have you noticed an increase or decrease in demands of Green
Charcoal? Why?
6. What worked very well and what could be done better?
7. What are the biggest challenges that the project faces?
8. Why would a customer choose to buy green charcoal instead of traditional charcoal?
9. What kind of training did you receive and how useful was that training?
10. Overall, how satisfied are you with the sale of the Green Charcoal and what type of feedback do
you have from customers?
11. Considering your available funds, can you buy from the project factory any amount of Green
Charcoal that you want to buy and at any time of the year?
12. Did you use a credit program to participate in the project? How easy is it to get credit?
13. What are some suggestions for improving the project in the future?
I. 11 | “CHABON BOUL” PROJECT PERFORMANCE EVALUATION
USAID.GOV
Key Informant Interview: Local rum distillers and Micro-Entrepreneur
agricultural processors
Thank you for agreeing to participate. We are very interested in hearing your views on the Green
charcoal for Haiti Activity. We hope to learn things that will orient interventions for future
programming.
All that will be said during the 30 to 45 minutes meeting has great value and we would like the opinion
of each of you on each question. If you do not want to answer a question, it is your right not to
respond. However, be certain that the information provided is completely confidential and will only be
used for one purpose: to help us understand the situation of your institution. With your permission, we
will take note of everything that will be shared during the meeting.
1. What do you know about the Green Charcoal for Haiti Activity?
2. How did you find out this information?
3. How were you selected as sugarcane bagasse provider?
4. How do you participate in the project? (Meetings, trainings?) / Is the relationship with the
project done individually or through any association? Please explain.
5. To what extent can we say that sugarcane bagasse are available throughout the year?
6. To what extent are you / were you involved in the conversion of sugarcane bagasse into char?
Tell us a little.
7. What unit of measure used to sell the sugarcane bagasse/char to the project? How much can a
distillers or micro-entrepreneur sell on average per week / per month?
8. What worked very well and what could be done better?
9. What are the biggest challenges that the project faces?
10. What kind of training did you receive and how useful was that training?
11. Overall, how satisfied are you with the sale of the sugarcane bagasse?
12. What are some suggestions for improving the project in the future?
USAID.GOV “CHABON BOUL” PROJECT PERFORMANCE EVALUATION | 12
Key Informant Interview with selected end users (informal roadside
cooks, schools, organizations)
Thank you for agreeing to participate. We are very interested in hearing your views on the Green
charcoal for Haiti Activity. We hope to learn things that will orient interventions for future
programming.
All that will be said during the 30 to 45 minutes meeting has great value and we would like the opinion
of each of you on each question. If you do not want to answer a question, it is your right not to
respond. However, be certain that the information provided is completely confidential and will only be
used for one purpose: to help us understand the situation of your institution. With your permission, we
will take note of everything that will be shared during the meeting.
1. What do you know about the Green Charcoal for Haiti Activity?
2. How did you find out this information?
3. How long has your institution used Green Charcoal? What prompted you to make the decision
to use Green Charcoal?
4. In your opinion what worked very well with this initiative and what could be done better?
5. What are the biggest challenges that the project faces?
6. Overall, how satisfied are you with the Green Charcoal? ( Ease of use, duration, cooking results)
7. How do you compare Green Charcoal with traditional charcoal or any other charcoal on the
market?
8. Do you think that this activity will continue in the northern department? Why? If not, what
should be done to make the production of green charcoal viable?
9. What are some suggestions for improving the project in the future?
10. To what extent has the intervention contributed to positive changes in your life?
11. Have there been any unintended or negative changes that can be attributed to the
intervention?
I. 13 | “CHABON BOUL” PROJECT PERFORMANCE EVALUATION
USAID.GOV
Key Informant Interview with branded brick‐and‐mortar green
charcoal boutique vendors
Thank you for agreeing to participate. We are very interested in hearing your views on the Green
charcoal for Haiti Activity. We hope to learn things that will orient interventions for future
programming.
All that will be said during the 30 to 45 minutes meeting has great value and we would like the opinion
of each of you on each question. If you do not want to answer a question, it is your right not to
respond. However, be certain that the information provided is completely confidential and will only be
used for one purpose: to help us understand the situation of your institution. With your permission, we
will take note of everything that will be shared during the meeting.
1. What do you know about the Green Charcoal for Haiti Activity?
2. How did you find out this information?
3. Do you have a boutique experience before joining the project? If so, what was this activity? Did
you sell traditional charcoal before?
4. What do you observe in the profile of users buying Green Charcoal in the Boutique?
5. Do you have an agreement with CRH to sell the Green Charcoal? Please explain.
6. Any specific thoughts/suggestions regarding the market of Charcoal and the project you
could share with us.
7. For the last six months have you noticed an increase or decrease in demands of Green
Charcoal? Why?
8. Have you been able to meet the demand for Green Charcoal throughout the year?
9. What worked very well and what could be done better?
10. What are the biggest challenges that the project faces?
11. Why would a customer choose to buy green charcoal instead of traditional charcoal?
12. What kind of training did you receive and how useful was that training?
13. Overall, how satisfied are you with the sale of the Green Charcoal and what type of feedback do
you have from customers?
14. What are some suggestions for improving the project in the future?
USAID.GOV “CHABON BOUL” PROJECT PERFORMANCE EVALUATION | 14
Key Informant interview with CRH key personnel
Thank you for agreeing to participate. We are very interested in hearing your views about the “Chabon
Boul” project. We hope to learn things that will orient interventions for future programming.
All that will be said during the meeting has great value and we would like your opinion on each question.
If you do not want to answer a question, it is your right not to respond. However, be certain that the
information provided is completely confidential and will only be used for one purpose: to help us
understand the situation of your institution. With your permission, we will take note of everything that
will be shared during the meeting. We strongly wish that you accept the interview.
1. What were your roles and responsibilities in the “Chabon Boul” project?
2. What are the main activities implemented by the project?
3. What results did the project achieve?
4. To what extent are the inputs needed for the charcoal production available on an ongoing basis?
5. How is the implementation of the “Chabon Boul” project? Biggest challenges? Opportunities?
6. What has been done in terms of advertising? To what extent has it really helped?
7. What worked very well and what could be done better?
8. What are the biggest challenges that the project faces? (Probe for micro-entrepreneurs, staff,
retailers, vendors, etc.)
9. To what extent have the grants helped to increase the production, distribution network and sale
of Green charcoal?
10. Overall, how satisfied are you with the production and sale of Green Charcoal?
11. According to you, why a user would choose to use Green Charcoal instead of traditional charcoal.
12. What measures are taken to ensure the sustainability/viability of production?
13. Why the choice of sugarcane bagasse? Do you plan to add agricultural waste? Why?
14. To what extent has the distribution network of the product changed over the past 12 months?
15. What are the key factors driving the Green Charcoal market and how did the project act on these
factors? (What are the results on the number of potential buyers / the average quantity
purchased / the change in the average purchase price).
16. What are some suggestions for improving the project in the future?
17. Have there been any unintended or negative changes that can be attributed to the intervention?
I. 15 | “CHABON BOUL” PROJECT PERFORMANCE EVALUATION
USAID.GOV
Key Informant interview with CRH personnel involved in the briquette
production process
Thank you for agreeing to participate. We are very interested in hearing your views about the “Chabon
Boul” project. We hope to learn things that will orient interventions for future programming.
All that will be said during the meeting has great value and we would like your opinion on each question.
If you do not want to answer a question, it is your right not to respond. However, be certain that the
information provided is completely confidential and will only be used for one purpose: to help us
understand the situation of your institution. With your permission, we will take note of everything that
will be shared during the meeting. We strongly wish that you accept the interview.
1. What are the main activities implemented by the project?
2. What results did the project achieve?
3. To what extent are the inputs needed for the charcoal production available on an ongoing basis?
4. What were your roles and responsibilities in the “Chabon Boul” production team?
5. How is the production team organized? How many people are involved? Daily production
capacity?
6. What worked very well?
7. What could be done better?
8. What are the biggest challenges that the project faces?
9. To what extent have the grants helped to increase the production, distribution network and sale
of Green charcoal?
10. Overall, how satisfied are you with the production and sale of Green Charcoal?
11. According to you, why a user would choose to use Green Charcoal instead of traditional charcoal.
12. What measures are taken to ensure the sustainability/viability of production?
13. What are some suggestions for improving the project in the future?
USAID.GOV “CHABON BOUL” PROJECT PERFORMANCE EVALUATION | 16
Key Informant interview – USAID key personal
Thank you for agreeing to participate. We are very interested in hearing your views on the Green
charcoal for Haiti Activity. We hope to learn things that will orient interventions for future
programming.
All that will be said during the 30 to 45 minutes meeting has great value and we would like the opinion
of each of you on each question. If you do not want to answer a question, it is your right not to
respond. However, be certain that the information provided is completely confidential and will only be
used for one purpose: to help us understand the situation of your institution. With your permission, we
will take note of everything that will be shared during the meeting.
1. To what extent was the design of the CRH based on a needs assessment and a context analysis?
2. To what extent was the design of the CRH the most appropriate to meet the needs identified?
(Alternative objectives?)
3. What kind of support did the USAID provide to CRH to help with the implementation of the
“Chabon Boul” project?
4. What results were achieved? How satisfied are you with performance?
5. What worked very well and what could be done better?
6. What are the biggest challenges that the project faces?
7. Have there been any unintended or negative changes that can be attributed to the intervention?
8. To what extent are the project results (impact if any, and outcomes) likely to continue after the
project?
9. What are some suggestions for improving the project in the future?
I. 17 | “CHABON BOUL” PROJECT PERFORMANCE EVALUATION
USAID.GOV
CHABON BOUL LEARNING EVENT QUESTIONNAIRE
General issues and communication
1. How clearly defined were the objectives for your work?
___very ____somewhat ___not very ___not at all
2. How clear were you on your role?
___very ____somewhat ___not very ___not at all
3. How adequately involved did you feel in CRH decisions?
___very ____somewhat ___not very ___not at all
4. If you did not feel involved, what decisions did you feel left out of?
5. How efficient and effective were project team meetings?
___very ____somewhat ___not very ___not at all
6. What changes would assist in speeding up in the future while increasing communication?
Project/Activity Implementation
7. What organization, structural problems in general were encountered, and how could we have
done better in these areas?
8. What was learned about the activity in general? Did the delivered Green Charcoal meet the
specified requirements and goals of the project?
9. What was learned about project management? Did the project management methodology work?
If not, why not?
10. What was learned about budgeting? Where costs budgets met? If not, why not?
11. What was learned about procurement? Was the schedule met? If not, why not?
12. What was learned about working with sponsors?
13. What was learned about working with customers? Was the customer satisfied with the green
charcoal? If not, why not?
14. What was learned about what went well?
15. What was learned about what did not go well?
USAID.GOV “CHABON BOUL” PROJECT PERFORMANCE EVALUATION | 18
16. What was learned about what needs to change?
17. How will/was this incorporated into project? What could be done to improve the process?
Closing
18. What were the main bottlenecks on the process?
19. What were the main sources of frustration in the project?
20. What surprises did the team handle during the project?
21. What project events were not anticipated?
22. What should be done over or differently?
23. As the activity will continue, what is the one thing that you would change (related to process,
not to technical solutions)?
I. 19 | “CHABON BOUL” PROJECT PERFORMANCE EVALUATION
USAID.GOV
A3. INSTITUTIONS/PERSON INTERVIEWED
DATA SOURCES
INSTITUTIONS/GROUP NAME POSITION
Sugarcane Bagasse Suppliers
1. Patrick Sainsurin
Distilleries owner
2. Jean-Claude Fontil
Distilleries owner
3. Hervé Antoine
Distilleries owner
4. Johnson Croissy
Distilleries owner
5. Eddy Laguerre
Distilleries owner
6. Lesly Laguerre
Distilleries owner
“Chabon Boul” Vendors
1. Loudridge Léandre
2. Nadège Valerin
3. Guerlande Celestin
Religious institution “Stella Maris”
1. Sr. Myrlène Charlemagne
Director
USAID.GOV “CHABON BOUL” PROJECT PERFORMANCE EVALUATION | 20
Nutritional center “Second Mile
Haiti” /
1. Jennifer Schenk
Second Mile Haiti director
2. Hérode Jean-Pierre
Secon Mile Haiti Administrator
3. Lujie Louis
Second Mile Haiti Cook
Informal Roadside Cooks
1. Nadege Celestin
2. Marie Osane Mompremier
3. Anne Edmond
CRH Personnel
1. Ryan Delanay
Project Director
2. Lesly Croissy
Production manager
3. Jacques Benjamin
4. Anderson Pierre
5. Bengonel Ambroise
6. Merlande Ifma
I. 21 | “CHABON BOUL” PROJECT PERFORMANCE EVALUATION
USAID.GOV
7. Yvanne Maxi
Sales coordinator
8. Rose Daphney Antoine
9. Alexandre Anglade
Sales manager
USAID
1. Harry François
COR Chabon Boul project
performance evaluation
2. Christine Musset
COR Chabon Boul Project
USAID.GOV “CHABON BOUL” PROJECT PERFORMANCE EVALUATION | 22
A4. SUMMARY OF PROJECT HISTORY
PROJECT HISTORY
INITIAL AWARD AND
MODIFICATIONS
DATE OF MODIFICATION PURPOSE OF MODIFICATIONS
Initial award June 1
st, 2015 N/A Modification 1 June 23, 2015 The purpose of this modification is to change the
Agreement Officer’s Representative and update
Milestone 2.
Modification 2 September 1
st, 2015 The purpose of this modification is to allow
payments in US Dollars instead of payments in
Gourdes, the local currency.
Modification 3 July 19, 2016 The purpose of this modification is to revise the
milestone schedule (make a re- arrangement of
the completion dates of milestones but still in the
range of 18 months of the initial project)
Modification 4 November 30, 2016 The purpose of this modification is to:
• Extend the completion date from
December 1, 2016 to May 31, 2017
• Increase the total amount by $500000
from $338000 to $838000
• Provide obligation amount of $500000.
Therefore, increasing the total
obligation from $338000 to $838000;
• Revised the milestone schedule;
• Revised the program description.
Modification 5 March 10, 2017 The purpose of this modification is to revise the
milestone
Modification 6 August 21, 2017 The purpose of this modification is to revise the
milestone and extend the award through
December 01, 2017.