(2016) Strategic Citywide Spatial Planning: Situational Analysis of Metropolitan Port-au-Prince
Rezime — This UN-Habitat situational analysis supports strategic citywide spatial planning for metropolitan Port-au-Prince. It reviews urbanization, institutions, land, infrastructure, housing, risk and planning constraints across the metropolitan area.
Dekouve Enpotan
- Provides a metropolitan spatial-planning diagnostic for Port-au-Prince.
- Links land, housing, infrastructure and risk constraints.
- Useful context for Canaan and Croix-des-Bouquets territorial planning.
- Complements commune-level PCD/PFC and urban-risk documents.
Deskripsyon Konple
The summary report frames metropolitan Port-au-Prince as a citywide spatial-planning problem, drawing together demographic growth, institutional fragmentation, housing and land issues, service gaps, environmental risk and reconstruction constraints. It provides a metropolitan context for commune-level and Canaan-area planning documents.
Teks Konple Dokiman an
Teks ki soti nan dokiman orijinal la pou endeksasyon.
A situational analysis of
metropolitan Port-au-Prince, Haiti
Strategic citywide spatial planning
Summary report
Strategic Citywide Spatial Planning:
A situational analysis of metropolitan Port-au-Prince, Haiti
Copyright © United Nations Human Settlements Programme
(UN-HABITAT), 2010
HS/135/10E
ISBN : 978-92-1-132238-5
Disclaimer
The designations employed and the presentation of the material in this
publication do not imply the expression of any opinion whatsoever on the
part of the Secretariat of the United Nations concerning the legal status
of any country, territory, city or area, or of its authorities, or concerning
delimitation of its frontiers or boundaries, or regarding its economic system
or degree of development. The analysis, conclusions and recommendations
of this publication do not necessarily reflect the views of the United Nations
Human Settlements Programme or its Governing Council.
United Nations Human Settlements Programme (UN-HABITAT)
P.O. Box 30030, Nairobi 00100, Kenya
Tel: +254 20 762 3120
Fax: +254 20 762 3477
www.unhabitat.org
All photos © UN-HABITAT/ Åsa Forsman and Remy Sietchiping
Acknowledgements
Principal author:
Åsa Forsman
Contributors:
Remy Sietchiping, Clarissa Augustinus,
Leslie Voltaire, Filiep Decorte, Alberto
Paranhos, Maria- Guglielma da Passano,
Ulrik Westman, Mohamed El-Sioufi and
Claude Ngomsi of UN-HABITAT.
Editing and layout:
Robert Wagner, Britta Uhlig, Andrew Ondoo
Sponsors:
Norwegian Government, Swedish International
Development Cooperation and the Government
of Haiti
Printer:
UNON, Publishing Services Section, Nairobi,
ISO 14001:2004-certified.
A situational analysis of
metropolitan Port-au-Prince, Haiti
Strategic citywide spatial planning
Summary report
2010
Contents
Contents
Abbreviations
6
Foreword
8
1. Historical backdrop
9
1.1 General background on Haiti
9
1.2 Citywide strategic planning
13
2. Urban land and infrastructure in Port-au-Prince
17
2.1 Urban trends and development
17
2.2 Human settlements
19
2.3 Basic services and infrastructure
21
2.4 Human and natural risks
25
3. Analysis of challenges and opportunities
26
3.1 Inventory of urban planning and land stakeholders
26
3.2 Evaluation of citywide planning scenarios
26
4. Future activities and policy priorities
28
4.1 Establishment of a metropolitan agency
29
4.2 Metropolitan strategic framework
30
4.3 Reinforcement of the municipalities
32
4.4 Implementation recommendations
34
5. Conclusions
36
6. References
37
The Global Land Tool Network
39
A situational analysis of metropolitan Port-au-Prince, Haiti
Abbreviations
ASEC
Assemblée de la Section Communale
CAMEP
Centrale Autonome Métropolitaine d’Eau Potable
CARICOM
Caribbean Community
CASEC
Conseil Administratif de la Section Communale
CBO
Community Based Organization
CDS
City Development Strategy
CNRA
Commission Nationale á la Réforme Administrative
DGI
Direction Générale des Impôts
DSNCRP
Document de Stratégie Nationale pour la Croissance
et pour la Réduction de la Pauvreté
EDH
Électricité d’Haïti
EPPLS
Entreprise Publique de Promotion des Logements Sociaux
GDP
Gross Domestic Product
GTIH
Groupement Technologie Intermédiaire d’Haïti
HIV/AIDS
Human Immunodeficiency Virus/Acquired
Immunodeficiency Syndrome
IHSI
Institut Haïtien de Statistique et d’Informatique
INARA
Institut National de la Réforme Agraire
I-PRSP
Interim Poverty Reduction Strategy Paper
ME
Ministère de l’Environnement
MEF
Ministère de l’Économie et des Finances
MICT
Ministère de l’Intérieur et des Collectivités Territoriales
MINUSTAH
Mission des Nations Unies pour la Stabilisation de Haïti
MPCE
Ministère de la Planification et la Coopération Externe
MTPTC
Ministère de Travaux Public, Transport et Communications
NGO
Non Governmental Organization
ONACA
Office National du Cadastre
6
Abbreviations
PESTLE
Political, Economic, Social, Technological,
Legal and Environmental factors
PPP
Purchasing power parity
PRS
Poverty Reduction Strategy
PRSP
Poverty Reduction Strategy Paper
SNEP
Service National d’Eau Potable
SWOT
Strengths, Weaknesses, Opportunities and Threats
UN
United Nations
UNDP
United Nations Development Programme
UNESCO
United Nations Educational, Scientific and Cultural Organization
UN-HABITAT
United Nations Human Settlements Programme
7
A situational analysis of metropolitan Port-au-Prince, Haiti
foreword
I
n February 2010, Haiti, particularly the capital
Port-au-Prince was hit by an earthquake that caused
extensive damage and loss. In 2008-2009, prior to the
earthquake, UN-Habitat undertook an urban planning
assessment of the metropolitan area of Port-au-Prince,
which hosts more than 40% of the Haitian population.
A key finding is that Port-au-Prince is at the epicenter
of several challenges and stresses facing Haiti. These
include not only earthquakes but also other natural
disasters, poverty, weak governance, and the absence of urban planning. In
this context, communities and civil society organisations are key players.
Similarly, coordinating multiple urban actors becomes essential.
UN-Habitat’s situational analysis of metropolitan Port-au-Prince provides a
thorough background to the city’s situation in terms of urban development
and planning, and presents a way forward for future planning of the
metropolitan area.
This publication makes a case for a participatory approach engaging all
key stakeholders in urban development. Such an approach is especially
needed in the metropolitan area of Port-au-Prince, where municipalities
are asking for support from central government to develop and implement
local planning and to deliver basic services. Another key area is the need
for institutional capacity building to better enable municipalities and their
partners to deliver basic urban services to the city’s residents.
The Citywide Strategic Planning approach presents the key steps for
initiating and implementing a strategic planning process in support of
sustainable urban development. It attempts to address three strategic
planning questions: Where are we today? Where do we want to be? How
do we get there? The publication also covers the wider aspects of housing
and urban infrastructure as well as the socio-economic situation which
constitute key components for achieving sustainable urbanization.
It is our hope that all the urban stakeholders working in Haiti and in the
Port-au-Prince metropolitan area will find this publication useful in their
ongoing attempts at recovery and reconstruction and with a view to building
back better.
Dr. Anna Kajumulo Tibaijuka
Executive Director, UN-HABITAT
8
Historical backdrop
1. Historical backdrop
1.1 General background
on Haiti
H
aiti is situated in the
Caribbean on the island of
Hispaniola, which it shares
with the Dominican Republic to
the east. The two countries have
formally been separate entities
since 1697, when Hispaniola was
divided between France and Spain,
and have experienced very different
developments from that time
onwards. For the past 30 years Haiti
has been regarded as the dark side
of the island because of its troubled
political and economic situation.
The country’s nine million
inhabitants speak Haitian Creole.
French is the official language, but
much less used by ordinary people.
Port-au-Prince, the capital of Haiti,
is situated on the bay of Port-auPrince in the southern part of the
country. Other important cities are
Gonaïve, Cap-Haïtien and Jacmel.
Figure 1: Map of Haiti
Source: Geology care
1.1.1 History and politics1
Haiti gained independence from
France in 1804, after a long slave
revolt. Independence did not resolve
the inequalities in land ownership
that Haiti had inherited from its
colonial period. The minority
mixed-race upper class kept its
privileges even after the colonists
left.
1 Information from the following sources has been
used: Sletten, P & Egset, W (2004), The Economist
Intelligence Unit (2007), The Economist Intelligence
Unit (August 2007), World Bank (2006), www.
wikipedia.org.
The political history of Haiti after
independence is one of incessant
revolts, coups d’état and uprising. In
1957 Dr Francois Duvalier, known
as “Papa Doc”, was elected president
but soon turned the democratic state
into a dictatorship. His oppressive
rule marked the beginning of the
emigration wave, especially to the
US. At his death in 1971 his son
Jean-Claude, called “Baby Doc”,
took over the presidency.
9
A situational analysis of metropolitan Port-au-Prince, Haiti
After mounting pressure both
from within the country and
internationally, the regime collapsed
in 1986 and was followed by a
number of military governments.
The gangs in the slums, which
were originally more of a political
force, transformed into criminal
gangs specialising in robbery and
kidnapping.
Elections were finally held in late
1990, and saw the young priest
Jean-Bertrand Aristide secure a
convincing victory. Aristide wanted
to implement major reforms, such
as separating the police from the
army, reorganising the agricultural
sector, redistributing land and
fighting corruption. This infuriated
the army and another military
coup was carried out in 1991. The
military rule was ruthless, especially
on Aristide’s supporters and around
5,000 of them were killed.
In this fragile situation, new elections
were held in 2006. They were
considered fair overall and saw the
return of René Préval as president.
Since then the security situation
has improved but there are still
outbreaks of violence, especially in
the informal settlements of Port-auPrince. The UN has a peacekeeping
force of more than 7,000 soldiers in
the country and their presence in
Port-au-Prince is obvious.
International
sanctions
were
imposed, but it was not until the US
deployed its military and threatened
an invasion that Aristide could be
reinstated as president in 1994. The
US forces left the country and were
replaced by UN troops responsible
for keeping the peace. In 1995
democratic elections were held and
René Préval, backed by Aristide,
was elected.
The reasons for Haiti’s poverty
are numerous. The combination
of political insecurity, corrupt
leaders, natural disasters, migration
of academics and skilled workers,
unfavorable trade agreements and
poor administration together form
an explanation that is a first step to
understanding the situation.
The next elections were held in 2000,
when Aristide once again won.
However the opposition boycotted
the elections. The weak condition
of the government led to intensified
violence, which lasted for several
years. In 2004 Aristide left Haiti,
but whether he was forced into this
by the US or went voluntarily is still
disputed. The UN intervened to
try to keep the fragile peace. After
a few months, these soldiers were
replaced by the UN peacekeeping
mission, commanded by Brazil.
Many of the slum areas in Port-auPrince were strongholds of Aristide
and intense fighting happened
between the residents and the
Haitian police.
1.1.2 Poverty and economy
Haiti is the poorest country in
the western hemisphere. Not only
are Haitians generally poor, they
also have low access to vital public
services such as water and sanitation,
education and health care. The low
service delivery by the Haitian
national and local authorities
has created a country where only
half of the population is literate2,
where infrastructure in practice has
collapsed and where almost half of
the population is undernourished.
The situation has only improved
slightly in recent decades. For those
who have access to services, the
quality and consistency of these still
vary enormously between different
areas and different income groups.
2 School enrolment rate is as low as 55% for children
aged 6-12.
10
Historical backdrop
Haiti is one of the world’s most
unequal societies. The richest 10%
has almost 50% of the country’s
total income, whereas the poorest
10% only has 0.7% of the income3.
Most of Haiti’s poor households are
way below the poverty line, with an
average income of 0.44USD per day
(Republic of Haiti, 2006).
Haiti’s political,
judicial and security
institutions have been
riven by dictatorship,
military intervention
and instability, and
remain extremely
weak. Political
structures are prey to
personal ambition and
factionalism among
politicians, while the
judicial system suffers
from inadequate
resources, inefficiency
and corruption.
The informal sector is dominant
in the country, employing around
70% of the total workforce,
mostly in agriculture (The
Economist Intelligence Unit,
2006). Unemployment is extensive,
especially amongst young people.
Almost 50% of the inhabitants in
metropolitan Port-au-Prince are
reportedly unemployed (World
Bank 2006). More women than
men are unemployed and girls are
also more likely than boys not to
attend school or to leave school
prematurely.
Remittances count for more than
one-fourth of the total GDP in
Haiti, principally coming from
Haitians living outside the country
(Sletten & Egset, 2004), but also
from migrant workers who get
employment in the major cities.
1.1.3 Demography and
urbanisation
Haiti is one of the most densely
populated countries in Latin
America, with 310 inhabitants per
square kilometre (World Bank,
2006). ,To get an idea of the
population pressure, it has been
calculated that there are at least 925
inhabitants per square kilometre
of arable land (Université de
Quisqueya, 2000), which is similar
to Bangladesh and gives an insight
to Haiti’s fast urbanisation.
The urbanisation rate in Haiti has
been substantial since the 1950s and
is projected to continue to increase.
3 Human Development Report,
http://hdrstats.undp.org
Haiti has not yet reached the same
levels of urbanisation as the rest of
the Caribbean. With only 40% of
its population living in urban areas
in 2007, Haiti is far below its nearest
neighbours: Dominican Republic
(66%), Puerto Rico (98%), Jamaica
(60%) and Cuba (75%) (www.
unfpa.org). In Latin America and
the Caribbean together, almost
three-quarters of the population
live in urban areas. With Haiti’s
weak agricultural and other rural
production, its urban population is
sure to increase.
1.1.4 Governance and
decentralisation
According to the World Bank’s
Governance Indicators4, during the
past ten years Haiti has witnessed
a slight decline in most of the
indicators from an already very low
level. Haiti is ranked among the
bottom five out of 212 countries.
In Transparency International’s
corruption ranking for 2007, it
is placed as the 177th out of 179
countries5.
The following quote from the
Economist Intelligence Unit (2006)
gives an insight to the status of
Haiti’s public institutions:
“Haiti’s political, judicial and
security institutions have been
riven by dictatorship, military
intervention and instability, and
remain extremely weak. Political
structures are prey to personal
ambition and factionalism among
politicians, while the judicial
system suffers from inadequate
resources, inefficiency and corruption.”
4 World Bank’s Governance Indicators, which
measure voice and accountability, political stability,
government effectiveness, regulatory quality, rule
of law and corruption http://info.worldbank.org/
governance/wgi2007/sc_country.asp
5 Transparency International’s Corruption Perception
Index for 2007, www.transparency.org/policy_
research/surveys_indices/cpi
11
A situational analysis of metropolitan Port-au-Prince, Haiti
Figure 2: General Organogram for Municipalities in Metropolitan Port-Au-Prince.
Maire Adjoints (2)
Maire principal
conseil communal
directeur général
Direction de la planification
Voirie
Planification
Déchet
Dir.Administration et finances
Fiscalité
dgi
Direction Affaires Sociales
Affaires Sociales
Loisir
Dir. Ressources Humaines
Personnel
Informatique
Source: Mairie de Carrefour (all terms are in French).
The 2006 elections and the resulting
stability since have at least created
the necessary prerequisites to
implement the constitution, which
was ratified in 1987.
Decentralisation is now the
responsibility of the Ministry of
Interior. However, few practical
changes have taken place so far
and there are still many political
and economic interests that divert
the process in other directions. The
central government does not appear
to be ready to devolve
power and
CUBA
resources to lower levels.
74o
HAITI
20o
0
10
0
5
20
10
30
15
20
40 km
25 mi
Despite limited funds at local level,
many municipalities have been
active and have tried to implement
what little they can with scarce
resources. In metropolitan Portau-Prince several of the eight
municipalities (see figure 3) have
taken steps towards assuming
greater responsibilities for their
areas. They have also initiated
an informal co-ordination group
Palmiste
ATLANTIC OCEAN
for metropolitan Port-au-Prince,
Port-de-Paix
St. Louis de Nord
but not many meetingsJean-Rabel
have been
Anse-à-Foleur
Le Borgne
Môle St.-Nicolas
Bassin-Bleu
held and the group
needs
to
be
Cap-Haïtien
Port-Margot
NORD - OUEST
Plaine
Quartier
FortLimbé
du Nord
strengthened. Bombardopolis Baie de Henne
Morin Caracol Liberté
Acul
Pilate
73o
72o
ÎLE DE
LA TORTUE
Pointe
Jean-Rabel
Canal de la Tortue
Cap Saint-Nicolas
Baie de
Mancenille
Cap-à-Foux
Baie
de Grande
Henne Pointe
Gros-Morne
Anse-Rouge
Terre-Neuve
20o
Monte
Criste
Phaëton
Limonade
du Nord
Trou-du-Nord
Plaisance
N O R D Milot
Ferrier
Dajabón
Sainte
Grande Rivière du Nord
Ouanaminthe
Suzanne
Dondon
Marmelade
Perches
NORD - EST
Bahon
Gonaïves Ennery
Vallières
Saint- Ranquitte
ARTIBONITE
Mont-Organisé
Raphaël
Saint Michel
Pignon
La Victoire
de l'Attalaye
Cerca Carvajal
Dessalines
Figure 3: The locations of the eight municipalities in
metropolitan Port-au-Prince
Golfe de la Gonâve
Baie de
la Tortue
Pointe de la Grande-Pierre
Baie de
Grand-Pierre
Grande-Saline
Petite-Rivièrede-l'Artibonite
Saint-Marc
Canal de
Saint-Marc
19o
Pointe
Ouest
Maïssade
Verrettes
Magasin
Mirebalais
Arcahaie
Duvalierville
Pointe-à-Raquette
Thomassique
C E N T R E Thomonde
La Chapelle
Pointe de
Montrouis
ÎLE DE
LA GONÂVE
Cerca-la-Source
Hinche
Belladère
Lascahobas
Baptiste
Savenette
Lac de
Péligre
Saut-d'Eau
19o
DOMINICAN REPUBLIC
The Municipal CouncilsInternational
in Haiti
boundary
Departmental
boundary
have, in many cases, National
managed
capital
Departmental
seat
to do something when it
comes
Town, village
Main
road
to local public
administration
Secondary road
despite unclear mandate Airport
and scarce
resources. As the constitution
is not fully operational, most of
the “normal” responsibilities for
municipalities, such as provision
of water and sanitation, waste
HAITI
management, spatial planning and
traffic management, remain at
national level.
number of staff and in some areas
different tasks due to circumstances
and capacities. Figure 2 shows the
general organization.
Cornillon
Abricots
Most of the
municipalities
in
Jérémie
Trou
Thomazeau
Bonbon
Croix des
Moron
Roseaux–
metropolitan Dame-Marie
Port-au-Prince
Bouquets
Gressier
Corail
Petit Trou de Nippes
Chambellan
Pestel
Ganthier
Carrefour
Source
Chaude
Pétion-Ville Fond Parisien
Anse-à-Veau
Baradères
Carrefour, Cité Soleil,
CroixLéogâne
Jimani
Anse d'Hainault G R A N D E - A N S E
N I P P E S Petite Rivières
Kenscoff
de Nippes Miragoâne Petit-Goâve
Grand-Goâve
O U E S T Fonds-Verrettes
des-Bouquets, Les Irois
Delmas, Kenscoff,
L'Asile
Trouin
Maniche
La Cahouane
Camp-Perrin
Tiburon
Cavaillon St. Louis Aquin
Les Anglais
La Vallée
Pétion-Ville, Port-au-Prince
and
Cayes- S U D - E S T Belledu Sud
Vieux
Bourg
de Jacmel
Chardonnières
SUD
Jacmel
Anse Thiotte
Marigot
d'Aquin
Jacmel
Côteaux Chantal
Port-à-Piment
Tabarre – are larger than in the
Bainet
Côtes-de-fer
Les Cayes
Grand-Gosier
Torbeck
Roch-à-Bateau
Banane
St.-Jean
rest of the country and have more
du Sud
CARIBBEAN SEA
Port-Salut
resources. They all have a similar
Anse-à-Pitres
organization, but with different
Source: National Centre for Geospatial Information
ÎLES CAYÉMITES
Pointe
Fantasque
É ta
n
um
PORTAUPRINCE
Sa
Canal de
la Gonâve
g
PRESQU'ÎLE
DES BARADÈRES
ât
re
The boundaries and names
shown on this map do not
imply official endorsement
or acceptance by the United
Nations.
18o
Map No. 3855 Rev. 4
June 2008
12
UNITED NATIONS
Baie de
Jacmel
Cap Raymond
74o
ÎLE À VACHE
73o
72o
18o
Department of Field Support
Cartographic Section
Historical backdrop
1.2 Citywide strategic
planning
should be accompanied by a system
for monitoring and follow-up.
Citywide strategic planning refers
to a more holistic, inclusive and
integrated planning approach;
one that takes the whole city into
consideration and where a propoor focus, good local governance
and gender equity are important
foundations.
Situation analysis and spatial
analysis
In most developing countries,
conventional urban planning
approaches are inadequate. The
reasons are many. Often the planning
laws and regulations in developing
countries are inherited from former
colonial administrations, resulting
in legislation that is not adapted
to the environment it is applied
in. For example, standards are too
high when it comes to construction
norms or rules for joint land
ownership are too inflexible. Some
urban plans in these countries
focus only on the formal parts of
the city, thus ignoring a large part
of the population and contributing
to increasing segregation. Other
plans, on the contrary, focus only
on improving the informal or slum
settlements, disregarding the gains
to be made from seeing the city as
a unit.
1.2.1 Establishing a vision and
a strategic action plan
In brief, the strategic planning
approach addresses three vital
questions:
• Where are we today?
• Where do we want to go?
• How do we get there?
The strategic action plan could
include
planning
principles
(including policy development and
revision of legislation), strategic
medium-term action plans,
processes for continuous city
consultation and establishment of
cooperation and communication
structures. The strategic action plan
The foundation of the process is to
analyse the present situation to get
a starting point, a kind of baseline.
The analyses and mapping exercises
that are carried out do not have to be
too detailed as facts and information
can be added later according to
specific needs but should provide a
basic picture of the city.
A situational analysis can be done
using rapid assessment methods,
such as the Rapid Urban Sector
Prof iling for Susta inabilit y
developed by UN-HABITAT. It can
also use analysis of existing material
on the city in question, coupled
with interviews and workshops
with the stakeholders identified in
the process. The situational analysis
content includes demographics,
housing, land management, urban
infrastructure, security, urban
environment, institutional settings,
and management capacity.
A spatia l ana lysis - a genera l
representation of the city using
basic maps or drawings should
be made at an early stage. The
spatial analysis will pinpoint the
structural elements of the city
(road networks, drainage systems,
markets, topographic features or
historic patterns) and describe these
with a geographical perspective.
Risk-prone areas in terms of natural
disaster are identified, and parts of
the city where the most vulnerable
people live. The spatial analysis
works very well as foundation for
decision-making, as it explains a
complex reality with a few lines.
13
A situational analysis of metropolitan Port-au-Prince, Haiti
Vision and overall objectives
The vision should be clear and
realistic and represent the residents’
desired future for their city. For
stable countries the vision could
be set a couple of decades in the
future, whereas the time span for
fragile or post-conflict states should
only be five to ten years. In order to
make the vision more manageable,
it should be supported by a set
of overall objectives to guide the
development efforts throughout
the planning period. These overall
objectives will be of fundamental
importance for monitoring the
process.
Strategic action plan and mediumterm action plans
Starting from the vision, the overall
strategic action plan is developed.
Planning principles and the
medium-term action plans take
shape guided by the vision and the
strategic action plan.
Both the strategic action plan and
the medium-term action plans could
be created using the back-casting
method (see figure 4). Starting
with a future goal (the vision), the
actions required to reach that goal
are developed. The medium-term
action plans should be realistic and
contribute substantially to reaching
the vision.
1.2.2 Principles and elements
of citywide strategic
planning
Local ownership, participation and
coordination
The citywide strategic planning
process should be locally owned, not
donor-driven. It is central that there
are strong and committed leaders for
the process, normally provided by
Mayors or other politically elected
figures, but subject to the local
environment, the leadership could
be located in a relevant Ministry or
a special unit set up for planning
purposes.
The authorities shall strive to
initiate (or maintain) partnerships
with different groups such as
other governmental bodies, civil
society and private sector groups.
In resource-poor countries or cities
it is vital to have solid ties with the
private sector.
Figure 4: The road towards the vision. Through envisioning the future objectives, the overall strategic
action plan is decided upon. Medium-term action plans are then created for shorter periods of time,
with incorporated checkpoints for periodical monitoring.
VISION
Overall strategic action plan
Medium-term action plans
Check points
Periodical monitoring
Analysis
14
Time
Historical backdrop
Private sector companies will not
enter a partnership without there
being something in it for them;
however, in most cases, areas of
mutual interest can be found where
co-operation can take place.
The citywide strategic planning
should not be an isolated project but
instead endeavour to incorporate
other development initiatives and
complement what is already being
carried out. Harmonisation and
coordination between different
interventions is key for the strategic
planning.
Quick win projects to build
commitment
Private sector
companies will
not enter a partnership
without there being
something in it for them.
Demonstration projects have the
advantage that they will strengthen
the stakeholders’ confidence and
build trust with donors. Such
‘quick win’ projects are especially
important in the beginning of a
citywide strategic planning exercise.
They provide opportunities for
early responses during the planning
process to urgent needs, as well as
valuable feedback to the on-going
planning process.
Mapping of ‘drivers’
Another starting point for strategic
planning could be the analysis of
‘drivers’ and ‘impediments’ of the
(non-) development of the city and
its economy, for both the formal and
the informal sectors. Identification
of markets and other trading
centres, as well as transport system
that encourages trade, are some of
the conditions to investigate, but
other, more hidden drivers also
need to be pinpointed.
Right to the city
Another basic principle for the
citywide strategic planning is the
“right to the city” (UN-HABITAT
and UNESCO 2005), translated
here as equal access to land, housing,
public space and basic services. To
introduce a rights-based approach
in urban development also brings
with it the opportunity to talk about
the citizens’ responsibilities. Rights
and responsibilities agreements can
be realised through social contracts
between local authorities and local
communities, and/or between
central and local governments.
Resource mobilisation and use of
local resources
As many financial resources as
possible should come from the city
itself and not from outside donors. If
local resources from municipalities,
national government, private sector,
NGOs and individual citizens are
used the result tends to be more
sustainable and more strategic,
as the prioritisation is carried out
more carefully. Only the most
urgent and strategic activities will
be implemented if local resources
are used to a larger extent.
In most developing countries, it
is impossible for a city to finance
implementation of action plans
entirely from its own pockets but
it is important that the donor
funding only constitutes a part of
the resources and that resource
mobilisation is included early in the
process.
Continuous capacity building
Capacity building is not only
necessary for experts – planners
and technicians – but maybe more
so for the staff who will use the
citywide strategic plan in their daily
work, such as service providers,
notaries, building inspectors. If
staff are not competent in using and
implementing the plan, it might
not no worth developing it in the
first place.
Similar training needs are usually
found also among political decisionmakers. But there is another
target group of equal importance
for capacity building, namely
the stakeholders involved in the
planning process.
15
A situational analysis of metropolitan Port-au-Prince, Haiti
Children in on of Port-au-Prince numerous slums photo © Å. Forsman
In order to execute wisely their roles
as vital contributors and members of
the planning process, they need to
know at least the basics of strategic
planning. Being part of the process,
they will “learn by doing”, but still
an initial training would be a great
advantage.
16
Capacity building is not a one-time
event, but has to be established as
a process to last for many years to
come.
Urban land and infrastructure in Port-au-Prince
2. Urban land and infrastructure
in Port-au-Prince
I
n this section, elements and
issues of importance to urban
planning are presented. It
describes the situation on the
ground in metropolitan Portau-Prince, while simultaneously
offering entry points for the
analyses and recommendations in
the following sections.
2.1 Urban trends and
development
Concentration of the
economy in one city
is not good for the
national economy
Around 30% of Haiti’s population
live in metropolitan Port-au-Prince,
where 90% of the country’s total
investments and formal jobs are
found (Republic of Haiti 2003).
This heavy concentration of the
economy in one city is not good for
the national economy, but explains
some of Port-au-Prince’s attraction
power.
If the current urbanisation rate
continues, which is likely, more
than four million people will live
in the metropolitan area within
the next ten years. The pressure on
infrastructure, land, housing and
services, already untenable today
with 2.7 million inhabitants, will
be even more unsound in the near
future unless mitigating measures
in the form of urban planning are
undertaken.
2.1.1 City profile
Port-au-Prince was established in
1749, when the French sugar farmers
and other important economic
actors created a capital for the their
colony Saint-Dominque. By the end
of the 18th century, the city had
9,400 inhabitants.6 Up until the
mid 20th century, Port-au-Prince
grew slowly but steadily with little
change in the city’s management
and design.
Between 1950 and 1970 Portau-Prince’s
population
more
than doubled, from 150,000 to
350,000. Decreasing mortality
due to advances in health care,
better employment opportunities
than in the countryside, and heavy
investments by state and other
actors in industries and other
businesses all contributed to this
rapid population increase.
The road network was improved
during this time, which made it
easier to either move to the city or
to commute. Most of the people
in this early migration wave found
houses in formal areas, which grew
more dense. Suburbs surrounded the
commercial centre in central Portau-Prince, where all business took
place (Republic of Haiti 2003). By
the end of the 1970s other, smaller
centres emerged.
Between 1982 and 1995 the urban
population tripled (see figure
5). The economic crisis made
it necessary for people to move
from the countryside to the cities,
especially the capital, in search of
employment. With so many people
moving rapidly into Port-au-Prince,
the need for shelter, basic services
and markets increased.
6 Commission pour la commémoration du 250e
anniversaire de la fondation de la ville de Port-auPrince (1999)
17
A situational analysis of metropolitan Port-au-Prince, Haiti
Figure 5: Population increase in Port-au-Prince.
3 000 000
2 500 000
2 000 000
1 500 000
1 000 000
500 000
0
1790
1840
1890
1940
1990
Sources: Republic of Haiti (2003), Republic of Haiti (2007), The Economist Intelligence Unit
(2007), CLED/ILD (1998).
Government housing schemes
failed to supply adequate housing,
especially for the poor, who built
their own dwellings, occupying or
renting private or state owned land.
The provision of basic infrastructure
and services could not keep up with
the rate of urbanisation, and public
services deteriorated rapidly, apart
from for the wealthiest people.
From the 1980s Port-au-Prince
became more divided. In one part
there was water and sanitation, with
formal, large properties with green
lawns. In another part, chaotic
urbanisation took place without
basic services, where the plots were
illegal or at best informal, often tiny
and built on dangerous land such as
dump sites or steep hillsides. The
so-called “bidonvillisation” of Portau-Prince had come to stay.
During the past decade, increasing
numbers of NGOs and international
organizations began working in
the slums and poor parts of Portau-Prince. Between 2004 and
2007 about 33 million USD was
spent on different slum upgrading
programmes in Port-au-Prince
(Republic of Haiti 2007).
18
Unfortunately, these interventions
have not followed any urban
planning or regulations, they have
been badly coordinated, often
overlapping, and without local
anchoring in the municipalities
or other local government. On
average, 75,000 migrants have
moved into metropolitan Port-auPrince every year during the past
20 years (World Bank 2006).
More than half of today’s population
in metropolitan Port-au-Prince
originally lived elsewhere, and in
the informal areas more than 70%
of the inhabitants came from the
countryside (GHRAP 2008). In
some areas in the capital the annual
increase in population is 8%. The
rural migrants, whose main reason
for moving is greater economic
opportunities, normally end up
in informal settlements. Of the
new migrants, one-third move to
already built areas, which means
that the density is increasing, and
two-thirds move to new informal
and often peri-urban settlements
(Republic of Haiti 2003).
Urban land and infrastructure in Port-au-Prince
2.1.2 Urban planning
The responsibility for spatial
planning of metropolitan Portau-Prince rests with the central
government, which also takes care
of most management, maintenance
and provision of infrastructure and
basic services. The municipalities
are marginalised.
There is no legally approved master
plan for metropolitan Port-auPrince. Several plans with different
geographic and thematic scope have
been developed, most with assistance
from donors, but they have neither
been endorsed nor institutionalised.
In practice, they have not served
as a proper framework for spatial
and social development but only
as inspiration for a few random
interventions.
There are more than fifty
institutions that share
the responsibility to
manage metropolitan
Port-au-Prince
Aside from the absence of
an adequate master plan, the
statistics and basic information
of metropolitan Port-au-Prince
are scattered and only randomly
updated. Neither the central
government nor the municipalities
have databases or registers with
reliable information on numbers
of inhabitants, infrastructure, legal
status of land, or access to services.
According to the Ministry of
Planning there are more than
50 institutions that share the
responsibility of managing
metropolitan
Port-au-Prince
(Republic of Haiti 2003). The
responsibilities for metropolitan
development and management are
dispersed in a maze of government
institutions, agencies, departments
and divisions without any
coordinating agency. Duplication
and gaps are common.
2.2 Human settlements
Port-au-Prince is a densely populated city, characterised by what many
Haitians call wild urbanisation
(urbanisation sauvage). The small
hills surrounding the city are being
covered with dwellings of different quality, many of them situated
precariously on steep slopes and in
danger of being washed away by the
next torrent or hurricane. Other
slum dwellers, in the centre of the
city, risk flooding due to their location in the bottom of the basin of
Port-au-Prince.
2.2.1 Physical conditions for
land and housing
More than half of the informal
settlements in Port-au-Prince are
located in ravines and gullies and are
susceptible to inundation. Flooding
is also the main threat for those who
have chosen to reside on wetland
areas close to the sea.
Figure 6: Overview of parts of Pétion-Ville. The map shows the
crowded living situation on the hills to the left, neighbouring a
planned settlement.
Source: Google Earth 2008
19
A situational analysis of metropolitan Port-au-Prince, Haiti
Box 1: low-cost public
housing gone amiss
In Port-au-Prince, it is common to build on landslide prone areas Photo © Å. Forsman
For most informal settlements in
Port-au-Prince, the absence of a grid
plan makes it difficult to provide
services such as water, electricity
and garbage collection to individual
households. Most of the inhabitants in the slums do not have access
roads between their plots.
Many families cannot obtain loans
for buying land and/or building a
house. Instead they build the house
slowly using available cash, taking
five, ten or even 15 years to finish.
This piecemeal way of building is
widespread in poor as well as in
affluent parts of Port-au-Prince, and
is also encouraged involuntarily by
the tax regulation that exempts
partly built houses from property
tax.
2.2.2 Formal and informal
settlements
Few Port-au-Prince residents have
legal titles to their land. Even in the
more wealthy areas of the city the
normal procedure, when selling and
buying a property, is to go to a public
notary who makes a declaration of
ownership. The problem is that there
can be several claims to the same
20
property, as there is no cadastre or
official register of ownership. The
ownership or transfer of ownership
is normally not registered by local
authorities or the legal system and
is therefore not fully secured.
The land and property belonging to
the state of Haiti is divided in two
groups: public and private property.
The state’s public property is not
transferable and consists mainly
of public spaces such as roads,
lakes, rivers, parks, cemeteries
and shorelines. The state’s private
property can on the other hand be
appropriated by an individual or
juridical person, and this property
falls under the jurisdiction of the
General Revenue Office (DGI).
The rules for buying and renting
state-owned and privately owned
land are different. In both cases it is
a cumbersome, expensive and long
procedure to become the lawful
owner of a property. One of the
many steps in the process involves
the actual transcription of title at
the DGI which can take between
one and two years. For these
reasons, most people do not even
try to acquire land.
The Public Enterprise for
Social Housing (EPPLS) has
had a shortage of funds for
the last decade and has thus
not provided much housing
lately. Even when there was
funding, production capacity
was inadequate. One example
of public housing done by the
EPPLS is just north of Cité Soleil,
in a small suburb called Village
de la Renaissance. Originally,
the housing scheme of 700
apartments was planned for
inhabitants from Cité Soleil
who needed to be relocated
when a public road was built
where they lived.
However, corruption resulted in
occupation of the houses by civil
servants instead. The cost of the
apartments, 1,000 gourdes per
month, is far too expensive for
most of the inhabitants in Cité
Soleil, where typical monthly
rent is 100-200 gourdes per
month. The Village de la
Renaissance is not an exception
in Port-au-Prince or Haiti.
Housing schemes constructed
for poor people have often
been used for political gain. The
problem with the production of
public housing is its extremely
low scale of production, which
hardly makes a dent in the
enormous housing deficit.
Source: visit in Cité Soleil in March
2008.
Urban land and infrastructure in Port-au-Prince
Instead they lease land and build a
house, rent a house or get property
on the informal market.
Box 2: Local NGO aims to
change building standards
The Haitian NGO Fondation
Connaissance
et
Liberté
(FOKAL), is amongst the few
civil society organizations in
the country working with land
and property issues. FOKAL is
mainly a cultural NGO, focused
on democracy and social
change. Its programmes target
education and cultural and
political awareness raising, but
it has recently employed a city
planner to strengthen its work
in urban areas.
FOKAL, in collaboration with
the Port-au-Prince municipality,
the EU and several international
and national NGOs, has started
a project to create a botanical
garden in the slum area
Martissant also working with the
surrounding neighbourhoods
on issues such as property, land
access and building norms.
Reduction of local violence,
access to water and sanitation
and improvement of the
education will also be part of
the programme. FOKAL wants
to carry out an in-depth study
of the communities around
the park, including their access
to land and their housing
situation. The NGO hopes it
can initiate small pilot projects
on construction norms, which
in the future may be used for
policy purpose within the Portau-Prince municipality.
In many cases landowners in
Port-au-Prince who obtain their
land legally still have problems
with illegality or extralegality.
Building and planning regulations,
subdivisions of land and other laws
are not easy to adhere to. The urban
legislation that should encourage
participation in the formal land and
housing sector instead works as an
incentive for people to resort to the
informal sector.
2.2.3 Land regulations and
institutions
The policies and legal framework for land issues are dispersed,
contradictory and in most cases not
implemented. Even though there
are many layers of administration
set up to manage legal procedures
regarding land, there is an absence
of a wider framework and general
policies on how land should be
administered and managed.
One of the reasons for the weak
policy foundation is that the
institutions that are supposed
to execute the policies do not
possess the necessary capacity.
Another obstacle for registration of
leasehold and freehold is that the
civil registry is incomplete: around
40% of Haitians lack identification
documents and are not considered
“legal”. The identity cards used for
the elections in 2006 are, however,
being recognised as a legally binding
document, which means that more
and more people are eventually
getting into the legal system.
The inefficiency of keeping separate
systems for land information is
obvious. The authorities are not held
accountable for the land transactions
as the registers are complicated
to access and not designed for
information retrieval. The Haitian
land sector has no anti-corruption
safeguard and corruption is rife.
There are no special land tribunals
where ownership issues or other
conflicts regarding properties can
be resolved. The court of law is
already overburdened with civil and
criminal trials and is not the proper
venue for settling land rights cases.
Although property and land issues
are considered to be important
and even potentially explosive in
Haiti, there are very few initiatives
to deal with the issues. However
in the beginning of March 2008
an informal, inter-ministerial
reference group on land, property
and human settlement was created
with representatives from the main
government agencies.
2.3 Basic services and
infrastructure
In many places in Port-au-Prince,
basic services (water, sanitation,
roads) are not provided for the
population due to difficult access to
the area. In some informal areas the
houses are built too close together
for any pipes to be laid, sewers or
drainage to be installed or roads to
be built. In other areas the access
problem is related to the hilly
topography. Some slums are so prone
to flooding that any infrastructure
built would be destroyed by heavy
rainfall.
It is very difficult for laypersons
and even experts to know to which
authority to turn to for what services
concerning land administration.
Other entities might be involved as
well in different land procedures.
For more information on FOKAL, see
www.fokal.org
21
A situational analysis of metropolitan Port-au-Prince, Haiti
Figure 7: Water provision in metropolitan Port-au-Prince. The difference between 1985 and 2005 in
type of service provider is striking. In 1985 the state was the main provider. In 2005 private providers
are almost as important.
80
70
60
50
Individual tap
40
Public water points
Private well, illegal sources, trucks
30
20
10
0
1985
2005
Source: CAMEP (undated).
One solution to the malfunctioning
of state-provided basic services is
to rely on private providers. This
is an option for the more wealthy
but not for the poor as services
from the private (often illegal)
sector are too expensive. Another
common solution is for NGOs and
local community organizations to
provide services such as water supply
or electricity in a community.
The Government of Haiti admits
that the residents of metropolitan
Port-au-Prince who can afford
to detach from the public service
system they usually do (Republic
of Haiti 2003). They produce their
own electricity with a generator or
solar panels, they use mobile phones
instead of landlines, they get water
from private suppliers and a private
company collects their garbage.
22
2.3.1 Water and sanitation
There are two authorities responsible
for delivery of drinking water
in metropolitan Port-au-Prince;
Centrale Auto-nome Métropolitaine
d’Eau Potable, CAMEP, and Service
National d’Eau Potable, SNEP.
In the 1990s CAMEP carried out
a project together with NGOs to
construct water kiosks in some
of the informal areas where it is
too difficult to install pipelines
(Republic of Haiti 2003). Local
water committees now manage the
water kiosks. But publicly provided
water is getting more rare, as figure
7 shows. From having had almost
the whole market in the 1980s, the
public utilities now only have about
half of the market.
Urban land and infrastructure in Port-au-Prince
In the whole of
Port-au-Prince,
there is no major
waste processing
Piles of garbage blocking a street in downtown Port au Prince Photo © Å. Forsman
Box 3: Three quarters of
solid waste is not collected
Martissant, a mostly informal
area in the municipality of Portau-Prince, produces 160 tons of
waste every day. According to
recent research, only 25% of this
is collected by the municipality
or private entrepreneurs. Of the
75% remaining, half is burnt in
shallow pits or by the road or
in the backyard. The remaining
60 tons is left elsewhere.
Some solid waste is recycled or
reused, but most ends up in the
rivers, on the streets, in gullies,
the sea and in open channels
transporting both sewage and
water.
Liquid waste disposal is even
worse. There is no sewage
system, all wastewater simply
flows from the house onto the
street where it will join a river
or water channel flowing to
the sea. Many water sources
in Martissant have been
contaminated as a result.
Even for people with individual
water taps the access is irregular
and often the water is not suitable
for drinking. Many of the more
affluent inhabitants, larger hotels
and restaurants, have disconnected
from the public service and get water
from private water trucks. For the
poorer residents the solutions range
from public service water, to buying
from water trucks, from neighbours
or from private providers. Between
25 and 50%of the city’s residents
have access to safe water.7
There is no system for purification
or other treatment of wastewater in
Port-au-Prince and many parts of the
city lack rainwater drainage systems.
Instead the rainwater, which is
combined with the wastewater and
other polluted water, flows down the
gullies, along open water channels
and the few existing gutters, ending
up in the sea. The Ministry of
Public Works has a master plan for
drainage, proposing to build five
major rainwater drainage channels
(Republic of Haiti 2003). So far,
one has been completed, for the
centre of the city.
2.3.2 Waste management
Only half of slum residents have
access to latrines. Most households
in the slums use onsite sanitation
where the waste from the pit
latrines and septic tanks is collected
from that point and not flushed
into sewers. Leaks or overflows
of human waste contaminate the
water system causing health risks
for the whole city. People with no
access to latrines defecate wherever
there is a reasonably private place –
behind the house, on the riverbank
or wherever suitable - leading to
groundwater contamination and
disease. According to UNICEF
only 34% of the population in Portau-Prince has access to adequate
sanitation.
In the whole of Port-au-Prince,
there is no major waste processing
or recycling and no well-managed
landfill. There are three large dump
sites which are not sufficient for
a city approaching three million
inhabitants.
7 Republic of Haiti (November 2007), WHO and
UNICEF Joint Monitoring Programme for water
supply and sanitation www.wssinfo.org, World
Bank (27 April 2006)
23
A situational analysis of metropolitan Port-au-Prince, Haiti
Even in the more affluent parts
there are garbage heaps on street
corners, waiting for days or weeks
to be picked up or are burnt to get
rid of the stench.
The Service Métropolitain de
Collecte des Résidus Solides does
not have the means to manage
the enormous amount of waste
produced daily in Port-au-Prince. In
the richer areas private companies
collect the garbage, but in the poor
communities there is nothing. Solid
waste that is not picked up is piled
in the streets, in gullies and in open
rainwater and wastewater channels,
where it blocks the flow and causes
flooding with filthy water.
Much of the garbage is burnt,
directly on the street or in garbage
pits in the gullies or backyards,
polluting the air. Very little recycling
takes place and no sorting, with
waste from households, industries,
hospitals and slaughterhouses being
mixed and either burnt or buried
together.
2.3.3 Transport
From early in the morning the roads
in Port-au-Prince are crammed
with cars, ‘tap taps’ (shared taxis in
the form of covered pickup trucks
or mini buses with vividly painted
decorations), buses, motorcycles
and pedestrians. Some 85% of the
country’s traffic is concentrated in
metropolitan Port-au-Prince (The
Economist Intelligence Unit 2006).
The roads are in bad condition
and are a mix between dirt and
tarmac surface. In the older parts
of the city the roads are surfaced,
although worn out andoften dusty
and corrugated.
Public transport in Port-au-Prince
has been totally privatised for
the past 20 years. The tap-taps
(mini buses) are the core of the
public transport and areone of the
cheapest ways to travel. There is a
great number of them so passengers
rarely have to wait.
24
Despite the fact that walking is
by far the most common means
of transport in Port-au-Prince,
no policy or plan takes this into
consideration, and the road
or transport projects ignore it
(Henriquez, Linonel 2000). The
poverty of Port-au-Prince has made
it the only city in the Caribbean
where walking is more common
than motorised transport.
The city is not planned for
pedestrians. In the old parts of the
city, pavements exist but are crowded
with merchants, goods and garbage
and thus nearly impassable. In other
parts of the city there are only very
narrow pavements or nothing at all,
so people have to walk on the road,
in danger of being hit by vehicles.
Regardless of the many walkers,
vehicle pollution in Port-au-Prince
is bad, and is bound to get worse
in the near future as the traffic
increases.
Apart from road-based traffic,
Port-au-Prince also has a number
of harbours and an international
airport, all of which are important
for the planning of the city as they
constitute entry and exit points
for both people and goods. The
harbours receive almost all of the
imports of goods and likewise are
responsible for exporting goods
produced in Haiti. All fuel that is
imported passes through the ports.
As the harbours are all centrally
located, this increases the transport,
congestion and pollution.
Walking is by far
the most common
means of transport
in Port-au-Prince
Urban land and infrastructure in Port-au-Prince
2.4 Human and natural
risks
Both human and natural risks must
be considered when urban planning
is concerned, as they both can
endanger the sustainability of the
physical and social environment.
2.4.1 Safety and security
Box 4: Evacuation of
children from violenceprone areas
Bel Air is an old, poor settlement
in Port-au-Prince where the
inhabitants have proper land
titles but not much more. The
Brazilian NGO Viva Rio plans
to improve the area’s access to
water and sanitation. During
the baseline survey Viva Rio
realised that one of the main
challenges in implementation
is the security situation in the
area.
The results of the baseline
survey’s data was clearly at odds
with national statistics. The
population pyramid for Bel Air
showed few children between
the ages of five and 19.
After further study the NGO
found out that the reason for
the absence of children was that
parents sent their children away
during times of insecurity.
During the first baseline survey
the political and security
situation in the area was poor.
On average, one child per
family moved out from Bel Air in
times of insecurity and political
struggles in the area. Around
13,000 children, out of a total
population of 80,000, were
temporarily sent to relatives
or friends in calmer parts of
Port-au-Prince, or out to the
countryside.
For more information on Viva Rio,
see www.comunidadseguridad.org
A World Bank report considers
urban violence in Haiti to be one
of the main obstacles to poverty
reduction, noting that “violence and
insecurity in Port-au-Prince’s slums
in particular have undermined the
political process, fuelled conflict,
and negatively affected development
and reconstruction efforts” (World
Bank 2006).
When discussing violence and
insecurity, it is easy to focus on
crimes such as kidnapping and
murder, for which Haiti has become
notorious. But the most common
form of crime is domestic violence
against women and children. Local
women’s organizations observe that
domestic rape is a very frequent
though seldom reported crime.
There has been a rise in the
occurrence of gang rapes and
politically motivated rapes in the
past decade. Increased use of hard
drugs and a steady influx of small
arms have encouraged criminal
gangs to commit more violent crimes
such as rape or gang rape, murder
and physical abuse. Protection
businesses and kidnapping have
also become more widespread in
metropolitan Port-au-Prince. Some
58% of the capital’s inhabitants
said they felt unsafe most of the
time in their own home and in their
neighbourhood, compared to 15%
in the countryside (World Bank
2006).
Despite a recent initiative to increase
the size of the Haitian police force,
there are still more private security
officers than police officers in the
country (World Bank 2006). The
United Nations Stabilisation Mission
in Haiti is active in reinforcing and
developing much needed capacity
in the Haitian police force. In 2007
there was a slight decline in violent
crime numbers, probably due to the
stable political situation.
2.4.2 Natural disaster and
climate change
Situated in the Caribbean, right in
the hurricane belt, Haiti is exposed
to tropical storms and hurricanes
every year. Even less serious weather
conditions can cause injury and
damage to people and property,
especially more vulnerable people,
such as those living in slums.
In 2004 (and also 2008) Haiti was
hit by flooding and hurricanes that
killed more than 4,000 people and
left 20,000 homeless. Since then,
smaller disasters have occurred
regularly, also with loss of life and
property although not at the same
scale. Disaster preparedness in
the country is low, despite regular
storms and heavy rains. In addition
to weather hazards, Port-au-Prince
is exceptionally ill-prepared to cope
with the increased risk of more
unstable weather patterns, rising sea
levels and warmer temperatures. An
assessment of people living at risk
from natural disasters, especially
flooding and landslides, should
be done to estimate the number
of people that can potentially be
affected and ultimately will need to
be relocated.
For all the natural disasters, the
risks could be lowered substantially
if spatial planning existed and
planning regulations and building
codes were followed. Allowing
houses to be constructed in drainage
zones, densely packed together on
steep hills and on marshy, instable
or contaminated ground, worsens
the impact of natural disasters.
25
A situational analysis of metropolitan Port-au-Prince, Haiti
3. Analysis of challenges
and opportunities
T
he analyses in this section
are made to bridge the gap
between the current situation
in metropolitan Port-au-Prince and
the recommendations for future
actions that follow in section 4.
3.1 Inventory of urban
planning and land
stakeholders
The stakeholders of urban
planning and land interventions in
metropolitan Port-au-Prince consist
of all individuals, groups and
institutions that can affect or be
affected by urban planning, urban
development and land management.
The stakeholders include potential
beneficiaries as well as those who
could be adversely affected. Most
of the stakeholders in metropolitan
Port-au-Prince have been presented
earlier, and their interests and
impacts have partly been covered.
In figure 8, the key players are the
municipalities and the relevant
ministries. They should preferably
move towards the upper right
corner, where they would have
greater influence over the situation,
with keen interest in managing
urban planning processes.
Looking at the overall picture,
it is troubling that so many of
stakeholders have a low or neutral
interest in urban planning. In
an ideal situation, the level of
interest would be higher, and a
few stakeholders would be given
increased power. The important
point is that all stakeholders make
their voice heard and influence
decisions.
3.2 Evaluation of
citywide planning
scenarios
Due to the politically sensitive
situation and the general instability
in Haiti it is difficult to judge the
general direction of the country
in terms of human development.
Therefore, three fundamentally
different scenarios representing
potential futures have been
visualised for the country and the
capital.
It is assumed for all three scenarios
that the urbanisation rate will remain
high, as all predictions point in that
direction. The scenarios have been
devised to evaluate what type or
level of citywide strategic planning
can be realistically developed and
implemented in metropolitan Portau-Prince.
Figure 8: Level of institutional interest and power. The positions
of the different groups show where they are today and the arrows
for some of them show where they should ideally be. Light/yellow
circles represent national stakeholders, dark/green circles = international stakeholders.
Level of interest
Relevant donors
Municipalities
Land related
institution
National
NGOs
Public Utilities
International
NGOs
Other donors
Residents
Private Sector
Other Ministries
26
Power
Relevant
Ministries
Future
and
policy
priorities
Analysis
of activities
challenges
and
opportunities
Scenario 1. Return to political
instability
Scenario 2. Continuing stable
political climate but with
weak economy and institutions
Scenario 3. Institutional, economic, political and social
improvements
Scenario 1 means a return to
political turmoil, as the result of a
coup d’état, revolution, rebellion,
election fraud, mass demonstrations
or other events. The international
community will loose faith in the
Haitian state, donors will withhold
funding or return to humanitarian
assistance. The UN troops will be
reinforced. Tension between people
from different political fractions
and with different incomes will
increase and lead to violence.
Scenario 2 represents a situation
where the relative political stability
from 2007 is re-established, however
the societal development is slow. This
scenario, probably the most likely, (as
described in sections 1 and 2) represents a continuation of the situation
in 2007.
Scenario 3 is the most desirable but
least likely of the three scenarios.
Political factors: The central
Government takes back its
monopoly and becomes even more
centralised, but it is still a weak
state without enforcement power.
Economic factors: Haiti’s economy
declines further, causing a
deterioration basic services such as
water and sanitation, health and
education.
Social factors: Increasing poverty
and inequality, combined with the
politically sensitive situation lead to
more crime and political violence.
Gangs take control of communities
and rule over their own little
kingdoms.
Technological factors: Infrastructure
is destroyed by riots or lack of maintenance and the state does not have
capacity to restore it.
Legal (and institutional) factors:
There is a return to lawlessness,
corruption thrives. People mistrust
the government authorities. The
informal sector gains in importance
from an already high level.
Environmental factors: The control
system breaks down for all sectors
and for the environment this means
increasing degradation. The water
supply system in the metropolitan
region risks collapsing.
Political factors: The decentralisation process is advancing slowly.
The municipalities will still not
have power or resources to perform
“normal” tasks such as planning,
service provision, infrastructure.
Economic factors: No real
development of the economy.
Food prices rise. More and more
food needs to be imported. Donor
money will however be more readily
available, both as donations and as
loans.
Social factors: Inequality persists
even though people slowly are
getting less poor. The trust in the
national and local Government is
low. Outbreaks of gang violence
happen but are rare. Demonstrations
and riots due to soaring food prices
and unemployment occur now and
then.
Technological factors: No major
changes from current situation.
Legal (and institutional) factors:
Capacity development will take place
in certain state bodies, according to
donor interest. There will be a few
strong institutions but the majority
of them will remain weak.
Environmental factors: No major
changes in policy or enforcement,
so environmental destruction
continues.
Political factors: Decentralisation and
devolution will be implemented with
support from government from all
levels. Municipalities will have more
power and resources and will take
on more responsibilities, especially
regarding city planning and provision
of basic services and infrastructure.
Economic factors: The economy is
steady, not decreasing. The donors are
confident in the (new) Government
and make long-term commitments.
S o c i a l f a c t or s: D e c re a si n g
inequality and slowly decreasing
poverty. Less violence in the streets
as employment rate goes up and
education is improved.
Technological factors: Due to the
stabilised economy, more services will
be provided on a regular basis, which
means that access to electricity and
Internet will be more widely available. New mobile or Internet services
will emerge, such as banking.
Legal (and institutional) factors:
National capacity development
strategies are put in place and
implemented. There is a slow
improvement in the overall
institu t i o n a l , h u m a n a n d
organizational capacity, both in
government and civil society. New
laws are passed that institutionalise
the constitution and activate the
decentralisation process.
Environmental factors: Stronger
environmental policies and control
leads to a more sustainable metropolitan area. Problems are not resolved,
but at least the environmental damage
does not continue unabated.situation
for its residents. Section 4 investigates
future avenues for metropolitan planning and development.
27
A situational analysis of metropolitan Port-au-Prince, Haiti
4. Future activities and
policy priorities
T
he informal settlements and
the slums of Port-au-Prince
are permanent. The people
and most of the houses are there to
stay. The slum cities that have been
created are permanent cities, and
may change over time like any city,
but they will not disappear.
Therefore, the solution to the
low living standards in the slums
cannot be found in isolated slum
upgrading projects, but requires
the development of the whole
metropolitan Port-au-Prince. Slum
prevention could also be achieved
through proper use of planning
tools such as spatial plans and
regulations on land subdivision.
Decentralisation has been an
objective for the Haitian state
officially since 1987, when the
constitution
emphasised
the
importance of a decentralised state.
In reality, there are today even larger
gaps between central and local
governments, perhaps as a result of
competition for resources. The largescale or so-called ‘grand corruption’
has its foundation in the government
structure and behaviour, and affects
the whole society, undermining its
political and economic stability and
allowing corruption to thrive in
other sectors.8
Urban planning involves land
use, land administration and
construction, thus it is a corruptionprone area with strong individual
and political interests. This makes
it a priority area for interventions
also for anti-corruption and
accountability reasons.
8 Transparency International & UN-HABITAT (March
2004)
28
Responsible planning and land
administration
can
decrease
corruption and graft.
The three main avenues that this
situational analysis suggests are:
1. Establishment of a metropolitan
agency with these major tasks:
coordinating all bodies with a
stake in urban planning and
development in metropolitan
Port-au-Prince; developing
planning policy, regulations and
legal frameworks; delegating
implementation and ensuring
an efficient execution of the
citywide strategic plan.
2. Development of a citywide strategic
framework for metropolitan Portau-Prince with major planning
principles, enabling and
controlling rules, regulations
and tools that will set the agenda
for spatial, social and economic
development in the capital. In
parallel with the development
of a strategic framework, several
demonstration projects should
be implemented to keep the
process moving and generate
feedback.
3. Reinforcement of the municipalities.
The municipalities will be in
the centre of all metropolitan
development and need to be
strengthened. Regardless of how
long the decentralisation process
takes, the municipalities would
benefit from gradually increased
responsibilities coupled with
increased assistance for capacity
building and institutional
strengthening.
Future activities and policy priorities
Figure 9: Set-up of the metropolitan agency. The networking function is the most important for the agency, which will coordinate all
relevant stakeholders.
Citywide
Strategic
planning
Institutional strangthening
Capacity Building
Continuous city
consultation
Enforcement
Implementation
Metropolitan
strategic
framework
Private sector
partnerships
Additional data
collection and analysis
Situation
Analysis
spatial
Analysis
4.1 Establishment of
a metropolitan
agency
The agency’s main tasks are to:
The idea of a co-ordinating body
for the metropolitan area appears in
many of the documents and plans
for improving the living standard
and environment in metropolitan
Port-au-Prince. Although most
stakeholders agree on the necessity
of such a body, the idea has not
been executed. Reasons for the nonaccomplishment of a coordinating
agency are, amongst others,
restricted financial means and lack
of political will.
• Coordinate the strategic framework
Apart from securing funding and
political will, it is crucial to keep
the structure of the agency simple
and basic, such as is shown in figure
9.
The metropolitan agency should
be small and not necessarily with
autonomous legal responsibility. In
order for the agency to still have the
legal and political instruments to
fulfil its mission, it could be housed
under one Ministry.
• Coordinate stakeholders
• Policy development
• Develop regulations and legal
frameworks
• Delegate responsibilities
The agency should set up a
framework, planning principles,
regulations and development
standards. These should be
enforced and controlled by national
government, municipalities and/or
community wards. It is important
that the metropolitan agency is not
responsible for implementation,
which should be carried out
by central government and,
increasingly, the municipalities.
The agency should be responsible
for coordination of all government
bodies with a stake in urban
development. This is the most
important of its tasks and also the
most politically sensitive.
29
A situational analysis of metropolitan Port-au-Prince, Haiti
Strong political support from all
involved parties and all levels is
necessary for the co-ordination
and cooperation to work. The
agency should also interact with
civil society, the private sectors and
development partners.
4.2 Metropolitan
strategic framework
The administration in Port-auPrince is exceptionally weak. A
fully-fledged citywide planning
process is difficult to implement
within the present institutional
setting and level of capacity. It
is instead suggested that a more
general citywide scheme be
developed; called the metropolitan
strategic framework.
4.2.1 Basic conditions for
a successful planning
process
Citywide strategic planning is more
holistic and more participatory
than traditional urban planning.
Although the difference may seem
small, it actually means changing
the whole process, making it more
demanding and complex.
Therefore, a stronger institutional
foundation is a necessity. In the case
of metropolitan Port-au-Prince,
an incremental approach towards
citywide strategic planning is
suggested, starting with a citywide
strategic framework that sets the
rules of the game, which will
constitute the foundation for the
future citywide strategic plan.
Prerequisites for undertaking
citywide strategic planning
• Political commitment
• Relevant legislation in place,
for example, concerning
decentralisation
• Local authority with enough
capacity, resources and
mandate for planning and
implementation
30
• Reliable and updated maps
and other basic information
available
• Mechanisms for public
participation and representation
of women and vulnerable
groups
• Longer-term funding to ensure
implementation
• Enabling environment for close
cooperation between national
and local authorities
4.2.2 Development process
for the metropolitan
strategic framework
Many of the steps in a full-scale
citywide strategic planning process
also apply to the more limited
variety that is recommended for
metropolitan Port-au-Prince.
See box 5 for the major steps
in developing the metropolitan
strategic framework.
Several of the listed activities can and
should take place simultaneously.
The goal is to develop the framework
in a participatory manner. This
means that the process, managed by
the metropolitan agency, encourages
different stakeholders from state
and non-state organizations to
express their views, needs and
ideas. The private sector should be
included in the consultations from
the start. The main ownership of
the process must be within the
state, with as many of the activities
taking place at municipal level as
possible. The participatory process
and consultations thus serve at least
two purposes: to ensure ownership
that achieves a more sustainable
framework, and to build capacity
amongst stakeholders.
Alongside the development of
the citywide strategic framework,
implementation work should
start. It is better to start smallscale implementation while still
developing the framework.
Box 5: Steps for developing
the Metropolitan Strategic
Framework
1. Ensure that there is adequate
political support and leadership
and that all stakeholders have
ownership over the process.
Establish a core team that will
be responsible for the process.
2. Define what “metropolitan
strategic framework” implies
for metropolitan Port-au-Prince;
choose an entry point of great
importance for the metropolitan development, such as land
issues or waste management.
3. Initiate the process by defining
roles of stakeholders; prepare
work plan and budget.
4. Review key documents, including relevant legislation, to
benefit from past experience
and specify potential barriers in
the process. Continue the analysis of the current situation,
e.g. with a spatial analysis and/
or rapid assessment of different
areas.
5. Arrange a brainstorming event
with the stakeholders and
define a common vision and
overall objectives for the metropolitan strategic framework.
6. Prepare the overall strategic
action plan and get the metropolitan strategic framework
agreed upon by the key stakeholders.
7. Revise the metropolitan strategic framework to match
laws and regulations so it can
be formally endorsed by the
government.
8. Market the overall strategic
plan, disseminate it to stakeholders and ensure that the
involvement remains high.
9. Hold regular follow-up meetings to check the progress
against benchmarks. Revise the
framework/action plans according to any new needs.
10. Continue capacity building not only while the plan is developed but for many years into
the future.
Future activities and policy priorities
Figure 10: Three levels of municipal coordination. 1. metropolitan
coordination through the metropolitan agency, 2. coordination
between municipalities, 3. coordination within each municipality.
Coordination
within the
municipality
Coordination
between the
municipality
Metropolitan
coordination
If strategic interventions are being
implemented at an early stage,
it will also assist the framework
development process in terms of
feedback. Early implementation
projects provide opportunities for
quick response to urgent needs,
building confidence among the
public and other stakeholders that
strategic planning delivers real
benefits.
4.2.3 Components of the
metropolitan strategic
framework
The content of the citywide
strategic framework will be
developed following the structures
described above. Regardless of what
content the metropolitan strategic
framework will have, it needs to
encompass issues of equity, gender
sensitivity,
sustainability
and
affordability. Decisions should be
taken at lowest level of government
and with as much public control
of implementation and budget as
possible.
Without steering the process in a
certain direction, it is useful to give
examples of what types of issues
will be covered by the framework.
Some of these components have
already been presented in the 2003
Government plan for metropolitan
Port-au-Prince (Republic of Haiti
2003). As much information as
possible should be used from this to
avoid reinventing the wheel. Other
documents that have been produced
should also be reviewed relatively
early in the process.
Many of the residential services
in metropolitan Port-au-Prince
are already provided by private
companies (see figure 7 for water
provision). The tendency is towards
more privatization and more
involvement of the informal business
sector in service provision. Instead
of combating this development, the
metropolitan area could take a proactive step and make it easy for the
informal sector to become formal.
Many of the private service providers
are not illegal, merely informal. The
state should be responsible for the
coordination and control of the
providers to ensure a fair market
with equal access to these services.
31
A situational analysis of metropolitan Port-au-Prince, Haiti
4.3 Reinforcement of the
municipalities
The
metropolitan
strategic
framework is an umbrella for
interventions carried out at
a municipal or local level. In
different parts of the metropolitan
area, people have different needs
and the situation on the ground
differs between municipalities or
community wards. In order to
increase the municipalities’ capacity,
it is important to incrementally
increase their mandate and
responsibilities.
4.3.1 Co-ordination
The major co-ordination at
m e t r op ol it a n le v e l w i l l b e
managed by the metropolitan
agency described above. However
the municipalities also need to
coordinate between themselves.
There is already a municipal group
of the eight metropolitan mayors
that wants to focus on retrieving
responsibilities and resources for
the municipalities; in other words
to put decentralisation into practice.
In reality not much has happened.
In Martissant, the municipality of
Port-au-Prince has tried to bring
together the different actors to
share information. This is probably
the best example of coordination,
although it is not entirely effective.
There are several NGOs working
in the area that only recently
became aware of the coordination
initiative.
It would be useful to create more
formal
coordination
groups
within each municipality, assisted
by groups at lower levels in the
community wards, that would not
only harmonise the projects and
avoid duplication and bias towards
specific settlements, but also
ensure that the interventions are
in line with the main metropolitan
framework.
32
4.3.2 Demonstration projects
In addition to the metropolitan
agency and the metropolitan
strategic framework, a few practical
projects, should be carried out in
order to strengthen the capacity
of t he municipa lities. The
demonstration projects help prove
the rationale for the metropolitan
strategic framework, while working
towards a full citywide strategic
plan.
The project ideas given are meant
to serve as inspiration and can
be developed further, based on
discussions with stakeholders.
Examples of demonstration
projects
Growth control
The idea is to manage the growth
of metropolitan Port-au-Prince
through indicating plots in the most
growth prone areas, which will be
identified during the development
of the metropolitan framework. The
respective municipalities will be
responsible for marking plot limits
according to a grid plan. The
municipalities will also control
where people settle within the grid
plan, on demarcated subdivisions.
The purpose is firstly to ensure that
people do not construct houses in
areas prone to flooding, landslides,
pollution or other hazards, secondly
to manage the growth of the city
so that the municipality will be in
control of where new construction
takes place and thirdly, to make
certain that infrastructure can be
put in place easily and at lower cost
than in unplanned housing areas.
A city of walkers
To walk is the most environmentally
friendly means of transport, yet it is
not promoted in the city structure.
It is also the cheapest mode of
transport. All new roads being built
and all improvements of existing
ones – primary as well as secondary
and smaller – should include
sidewalks and pedestrian crossings
designed with safety in mind.
Future activities and policy priorities
Private sector engagement
4.3.3 Capacity building
There are already a few examples of
private companies engaged in urban
development projects in Port-auPrince, in particular in the informal
and slum areas.
One of the first capacity building
activities is a needs assessment. It
identifies the needs in detail and
specifies what kind of capacity
development would best suit the
particular municipality.
In Cité Soleil for example, there are
many private companies that build
new schools, parks or other public
places. This type of isolated project
should be encouraged, as all efforts
are needed, but metropolitan Portau-Prince should also develop a
strategy for cooperation with the
private sector.
The strategy could involve different
projects. One example could be that
a company or group of companies
becomes responsible for keeping
a certain street or neighbourhood
clean. Another idea used in other
cities with good results is that
companies are offered to “adopt
a light” through paying for a
streetlight that the company can
use for advertising.
Protection from natural disasters
Port-au-Prince and its inhabitants
are exposed to natural disasters
such as flooding and landslides, as
well as to manmade disasters such
as fires. Ways to mitigate the effects
of flooding include constructing
retaining walls to control flooding
for the most vulnerable parts of the
coastline; establish escape routes
and safe places for when a disaster
occurs. In the long term, people in
dangerous areas, such as on steep
hills and along the coastline, need
to be relocated to other areas.
Regardless of what types of
d e m on s t r a t i on pr oj e c t s a r e
implemented, the emphasis should
be on policy influence, on building
stakeholders’ capacity and on
following the planning principles
that are part of the metropolitan
strategic framework. Remember
that a failed demonstration project
could be worse than no project
at all, so the projects should be
carefully planned.
Corruption in the land sector in Haiti
is rife, especially in Port-au-Prince,
where land values are higher, as is the
competition for land. Corruption
is more widespread when there is
lack of transparency, when there is
a monopoly situation, when rules
and regulations are complicated
and when the public cannot easily
control the distribution of the good
in question.9 All of this is true for
the land sector in Port-au-Prince.
Ways for municipalities to
counteract corruption and low
ac c ou nt abi l it y i nclude more
openness and better organization
and division of roles. Rules and
regulations need to be simplified
and made understandable to the
citizens. Accurate and updated
information on land ownership,
distribution of basic services,
poverty and other key municipal
data should be made available to the
public. The capacity building needs
assessment should not only cover
technical skills but also attitudinal
capacity such as gender equality,
focus on pro-poor and affordable
basic services, and equity in access
to information.
There are many possible capacity
building inter ventions for
institutional strengthening and
organization, but only a few for
human capacity building. The
reason is that human capacity
building is more specific and not
much can be said before the needs
assessment is carried out.
9 Transparency International & UN-HABITAT (March
2004)
33
A situational analysis of metropolitan Port-au-Prince, Haiti
4.4 Implementation
recommendations
4.4.1 Recommendations for
state actors
Most previous development plans
of Port-au-Prince were never carried
out. Inadequate funding, low
initiative, lack of capacity, political
support and commitment from
civil servants and politicians alike
where some of the reasons that were
given in the April 2008 stakeholder
workshop. Most of the problems
could be solved or at least mitigated
with capacity building, clarification
of roles and responsibilities and
institutional strengthening, so this
is where to focus interventions.
The proposed activities will mainly
be planned and implemented by the
municipalities and the state. Civil
society will be part of the process,
but will not take on the roles of
implementation or coordination.
A not he r c h a l le n g e i s t he
powerlessness of the municipalities.
Many of the municipalities are
nevertheless trying to gain more
influence with their scarce resources
and unclear mandate and there are
many examples that can be shared
between them.
To avoid creating yet another urban
plan that is not implemented, the
process must be transparent and
information on it made available for
stakeholders and also the inhabitants
in the whole metropolitan area. The
structures must be clear and easy
to access so that the citizens know
where to turn to inform themselves
or to influence the process.
Another lesson is that if the planning
takes place at a high level, the
municipalities will not implement
it. They must therefore be at the
core of the process, from the start,
even though the administrative and
political system does not yet give
them the authority to formally lead
the process.
To carry out activities and policies
proposed in the previous section,
some short recommendations are
given. For the implementation it is
also important to put extra effort
into developing systems to measure
results and avoid risks, and therefore
these issues are looked upon as well
in this section.
34
Both the metropolitan agency and
the work to develop and implement
the citywide strategic framework
can also serve as a way to increase
local level influence. From today’s
very low level of responsibility
for most of the municipalities, an
expansion in the scope of their
tasks would imply that more staff
is needed. One way of solving this
problem could be seconding staff
from the line ministries to the
municipalities.
If Haiti’s Government chooses to
embark on a metropolitan strategic
framework for Port-au-Prince, staff
must be made available to the already
very stretched municipalities. The
most obvious way of solving this
problem is with salary increases,
but this may not be financially
possible.
4.4.2 Benchmarks and
indicators
In all interventions a monitoring
system is needed to track progress,
measure results and apply the lessons
learnt to the ongoing process.
The basic requirements for any
monitoring system are benchmarks
(or checkpoints) and indicators.
These not only assure the residents
and donors that they get value for
their tax money or funding, but
also, and more importantly, they
will be a tool in the implementation
of the process.
Benchmarks measure progress at
certain reference points in time and
indicators identify exactly what will
be measured. When the benchmarks
have been identified and agreed
upon, a baseline will be developed
so that the starting point is clear.
Future activities and policy priorities
Information for the baseline
will come mostly from existing
documents, such as the 2003
development plan, UN reports,
government statistics and municipal
statistics. Others will have to
be found through interviews or
small assessments of certain issues
(Republic of Haiti 2003).
The indicators are specified by the
means of verification, which for
the media campaign above could
be; number of people reached by
the campaign, number of people
in low-income areas involved in the
process as a result of the campaign,
percentage of the reached population
that improved their knowledge in a
certain area. Setting actual numbers
for the indicators makes it possible
to measure if a benchmark has been
achieved.
4.4.3 Risk assessment and
management
There will be risks that are external
– that cannot be controlled by
the intervention – such as natural
disasters and conflicts. Other risks
are internal – can be controlled and
managed by the intervention – such
as the design of the intervention
and the management. Some risks
fall in between – can only partially
be controlled and influenced – such
as the political environment with its
policies, institutions and political
will. Risk assessment looks at all of
these. [the full version gives a more
in-depth description of risk assessment
issues]
framework that can adapt to
the political situation and also
allow for scaling down if need be.
Slow decentralisation
The decentralisation process in
Haiti is slow, which will negatively
influence the proposed metropolitan
strategic framework. On the other
hand, the framework will in itself
support the decentralisation process,
as it increases the responsibilities of
the municipalities. While working
to influence the decentralisation
process, the framework will have to
accept the limitations that follow
from the centralised environment
and adapt its activities to the
reality.
Ownership by municipalities
The municipalities are overstretched,
with so many emergencies to deal
with on a daily basis that they
do not have time for planning or
coordination. Apart from capacity
building to increase efficiency at
the municipalities there are other
measures that could be taken.
Secondment of staff from the
ministries to the municipalities is
one solution. Another way forward
is to lobby for a clarification
and possibly upgrading of the
municipalities’ role. Development
partners should be involved in the
lobbying, as they normally have
access to powerful politicians.
Political instability
If there are more changes of
government and new staff in the
ministries and municipalities, it
will be difficult to keep the political
support and also the continuity of the
i nt e r v e nt i on . T he pr op o s e d
mitigation of the possible impact
of such a situation is to start
small, start with a strategic
35
A situational analysis of metropolitan Port-au-Prince, Haiti
5. Conclusions
T
he overwhelming institutional confusion of the
city’s administration, closely
linked to the lack of coordination,
needs to be dealt with. This study is
a guide to how such a change can be
initiated. The establishment of
a metropolitan agency is a key
requirement in order to initiate a
more holistic and integrated strategic planning of the city.
Metropolitan Port-au-Prince
should start small with a process
that can be attained. The city and
all stakeholders should agree on a
realistic vision. The metropolitan
strategic framework must be tailored
to the needs and capability of the
stakeholders in Port-au-Prince.
Most of the funding can come
from metropolitan Port-au-Prince,
including the key city stakeholders
including the private sector, and not
from outside development partners
or donors. The intervention thus
more focused and sustainable,
targeting the most urgent needs
of the city. Development partners
should not be left outside the
process, but be seen as catalysts.
They should be used for technical
expertise, sharing experiences and
assisting in putting pressure on
the politicians for support and for
fast-tracking the decentralisation
process.
36
This study makes clear that there
are huge gaps between the state
and the civil society that will have
to be bridged. The residents do not
feel included in the state and they
do not have the opportunity to
influence decisions concerning their
daily lives. The state on the other
hand feels that the residents, and
in particular the NGOs and CBOs,
are pushing their own agenda,
without any will to coordinate with
the authorities. Provision should be
made for residents’ representatives
to participate in and contribute
to planning and delivery of basic
services. The metropolitan agency
should be designed to that end.
For metropolitan Port-au-Prince
to develop positively, the major
stakeholders will have to agree on a
way forward and commit themselves
to work in that direction. It will not
be easy to merge the many different
opinions on how the metropolitan
area should develop and views on
who will be in charge of different
sec t ions. C om mu nic at ion,
coordination and participation
do not happen by chance but
are achieved through hard work.
When a shared vision of the future
is agreed upon it will be easier to
commit to that work.
References
6. References
Cadre de Coopération Intérimaire, CCI: Eau potable et assainissements,
Rapport, 24 May 2004.
Cadre de Coopération Intérimaire, CCI: Services Urbains: déchets solides et
bidonvilles, Rapport Final, 22 June 2004.
Centrale Autonome Métropolitaine d’Eau Potable, CAMEP: Eau et
assainissement à Port-au-Prince –Projets CAMEP, undated.
Centre pour la Libre Entreprise et la Democratie / Instituto Libertad y
Democracia, CLED/ILD: La Capitalisation des Pauvres en Haïti, 2003.
Centre pour la Libre Entreprise et la Democratie / Instituto Libertad y
Democracia, CLED/ILD: Urban Real Estate Formalization Program in
Haiti, Situation Analysis Report October 1997- March 1998, 1998.
Commission pour la commemoration du 250e anniversaire de la
fondation de la ville de Port-au-Prince (ed. Holly, Gérald): Les problèmes
environnementaux de la région métropolitaine de Port-au-Prince, 1999.
Henriquez, Lionel: Les conséquances du déficit en infrastructures
piétonnières dans un espace urbain non régulé: le cas du résau viaire de
Port-au-Prince, November 2000.
Henriquez, Lionel (in Freeman & Jamet (ed): Urban Transport Policy. A
Sustainable Development Tool): Les effets négatifs de la degradation accélérée
d’un milieu urbain: le cas de Port-au-Prince, 1998.
International Institute for Environment and Development (IIED):
Stakeholder Influence Mapping, March 2005.
Republic of Haiti (MPCE): Document de Stratégie Nationale pour la
Croissance et pour la Réduction de la Pauvreté, DSNCRP, 2007-2010,
November 2007.
Republic of Haiti & IMF: A window of opportunity for Haiti, Interim Poverty
Reduction Strategy Paper (I-PRSP), 27 September 2006.
Republic of Haiti & UNDP (préparé par Robert Denizé): Décentralisation:
Note Preliminaire, February 2005.
Republic of Haiti (MPCE): Carte de pauvreté d’Haïti, 2004.
Republic of Haiti: Plan-Programme de Développement de la Zone
métropolitaine de Port-au-Prince, 2003.
Sletten, P & Egset, W: Poverty in Haiti, Fafo, 2004.
The Economist Intelligence Unit: Haiti, Country Profile 2006, 2006.
The Economist Intelligence Unit: Haiti, Country Report, August 2007.
37
A situational analysis of metropolitan Port-au-Prince, Haiti
Transparency International & UN-Habitat: Tools to Support Transparency in
Local Government, March 2004.
UNDP: Human Development Report 2007/2008, 2007.
UNDP/GEF: UNDP/GEF Risk Management Strategy, April 2006.
Université Quisqueya: Analyse de la Situation de l’Habitat en Haïti,
June 2000.
UN-HABITAT: Manuel des Bonnes Pratiques – Sécurité Foncière et Accès au
Sol, 2007.
UN-HABITAT: Pro-Poor Land Management. Integrating slums into city
planning approaches, 2004.
UN-HABITAT: Rapid Urban Spatial Analysis – (RUSA) Guidelines,
November 2004.
UN-HABITAT: Situation Analysis of Informal Settlements in Kisumu, 2005.
UN-HABITAT & Transparency International: Tools to Support Transparency
in Local Governance, March 2004.
UN-HABITAT & UNESCO: Discussion Paper: “Urban Policies and the
Right to the City”, 2005.
Ville de Montréal & Ville de Port-au-Prince: Plan d’Action 2008-2013,
December 2007.
World Bank: Social Resilience and State Fragility in Haiti, A Country Social
Analysis, 27 April 2006.
Web pages
Cities Alliance, www.citiesalliance.org
Haiti’s Poverty Reduction Strategy Paper for 2008-2010, pubs/ft/scr/2008/
cr08115.pdf (in English)
Human Development Report, http://hdrstats.undp.org
Institut Haitien de Statistique et d’Informatique, www.ihsi.ht
Transparency International, www.transparency.org
United Nations Population Fund, www.unfpa.org
UN-Habitat, www.unhabitat.org
World Bank’s Governance Indicators, http://info.worldbank.org/governance/
wgi2007/sc_country.asp
38
The Global Land Tool Network
The main objective of the Global Land Tool Network (GLTN) is to
contribute to poverty alleviation and the Millennium Development Goals
through land reform, improved land management and security of tenure.
The Network has developed a global land partnership. Its members include
international civil society organizations, international finance institutions,
international research and training institutions, donors and professional
bodies. It aims to take a more holistic approach to land issues and improve
global land coordination in various ways. These include the establishment
of a continuum of land rights, rather than a narrow focus on individual land
titling, the improvement and development of pro-poor land management,
as well as land tenure tools. The new approach also entails unblocking
existing initiatives, helping strengthen existing land networks, assisting
in the development of affordable gendered land tools useful to povertystricken communities, and spreading knowledge on how to implement
security of tenure.
The GLTN partners, in their quest to attain the goals of poverty alleviation,
better land management and security of tenure through land reform, have
identified and agreed on 18 key land tools to deal with poverty and land
issues at the country level across all regions. The Network partners argue
that the existing lack of these tools, as well as land governance problems,
are the main cause of failed implementation at scale of land policies world
wide.
The GLTN is a demand driven network where many individuals and
groups have come together to address this global problem. For further
information, and registration, visit the GLTN web site at www.gltn.net.
39
About this publication
This situational analysis of metropolitan Port-au-Prince gives in-depth background to the city’s condition in terms of
urban development and planning. The report maps a way forward for future planning of the metropolitan area. It
argues that the main stakeholder for any urban development intervention should be the state, and more precisely
the municipalities. The municipalities in Port-au-Prince need support in planning and delivering basic services.
The challenges and opportunities for a decent urban livelihood in Port-au-Prince have been analysed, and are
followed by recommendations on the most effective type of spatial planning and/or land related interventions. The
situational analysis of metropolitan Port-au-Prince focuses on citywide planning with an urban land perspective.
The term “citywide” embraces the whole metropolitan region. The situational analysis also covers the wider
aspects of housing, urban infrastructure and the socio-economic situation.
The situational analysis provides major stakeholders with the necessary background information and hands-on
recommendations to initiate a citywide planning process in metropolitan Port-au-Prince.
HS/135/10E
ISBN : 978-92-1-132238-5
UNITED NATIONS HUMAN SETTLEMENTS PROGRAMME
Shelter and Sustainable Human Settlements Development Division
Shelter Branch (UN-HABITAT)
P. O. Box 30030, Nairobi 00100, Kenya
Tel: +254 207623120;
Fax: +254 207624266
Website: www.unhabitat.org