Repiblik Ayiti
Bibliyotèk Dokiman
4,925 dokiman 215,848 paj
Rapò sou Ensidans Angajman Pwogram Alontèm yo

Rapò sou Ensidans Angajman Pwogram Alontèm yo

Fon Monetè Entènasyonal (FMI) 2014 4 paj
Rezime — Rapò FMI sa a egzamine ensidans angajman pwogram alontèm (LTPE) pami peyi manm yo, tankou Ayiti. Li jwenn plizyè peyi, tankou Ayiti, ki te gen aranjman finansye Fon an te sipòte pandan peryòd pwolonje, sa ki mande pou gen Evalyasyon Ex Post (EPA) pou evalye efikasite pwogram yo.
Dekouve Enpotan
Deskripsyon Konple

Rapò a evalye ensidans Angajman Pwogram Alontèm (LTPE), ki defini kòm yon manm ki anba aranjman finansye Fon an sipòte pandan omwen sèt nan 10 dènye ane yo. Li mete aksan sou ke apati 1e septanm 2014, katòz manm te satisfè definisyon LTPE a, tankou Afganistan ak Ayiti, ki te fèk ajoute nan lis la. Rapò a note ke yon Evalyasyon Ex Post (EPA) obligatwa pou manm ki satisfè definisyon LTPE a, epi yo espere ke Konsèy Egzekitif la pral diskite sou yon rapò EPA pou Ayiti ansanm ak dènye revizyon an anba aranjman ECF aktyèl la.

Sekte
Jewografi
Peryod Kouvri
2004 — 2014
Teks Konple Dokiman an

Teks ki soti nan dokiman orijinal la pou endeksasyon.

REPORT ON THE INCIDENCE OF LONGER-TERM PROGRAM ENGAGEMENT 1. Longer-term program engagement (LTPE) occurs when a member has spent at least seven of the past 10 years under Fund-supported financial arrangements. 1 In response to the Executive Board’s request for periodic updates on the incidence of LTPEs, this is the fifteenth such report and provides information through September 1, 2014. 2 2. An Ex Post Assessment (EPA) is required for members identified as meeting the LTPE definition, and for whom an EPA has not been prepared in the past five years. 3 As of September 1, 2014, the Executive Board had discussed EPAs for 54 members (Table 1). The Grenada EPA was the only one discussed in the past 12 months. 3. Fourteen members met the LTPE definition as of September 1, 2014 (Table 2). Since the time of the last report, Afghanistan and Haiti were added to the list of countries with LTPE, while Mauritania no longer meets the LTPE definition. 4. In the next twelve months, EPA reports for Afghanistan and Haiti are expected to be produced. The Haiti EPA report is expected to be discussed by the Executive Board together with the last review under the current ECF arrangement, recently extended through December 28, 2014. In the case of Afghanistan, should a successor arrangement be contemplated, an EPA report would be prepared for Board discussion prior to a request for such arrangement in line with the policy and the guideline. For all other countries meeting the LTPE definition EPA reports or updates have been issued within the last five years and therefore no assessments are required in the next twelve months. 1 Fund financial arrangements that qualify for the definition of LTPE are those drawing on upper credit tranche GRA or PRGF-ESF/PRGT resources, or any blend of the two. An outright purchase under the ESF, RAC, RCF, ENDA/EPCA, or RFI does not count towards LTPE. Further, time spent under the Policy Support Instrument (PSI), the precautionary use of the Flexible Credit Line (FCL), Precautionary and Liquidity Line (PLL), or the GRA or PRGT resources that remain undrawn throughout the arrangement does not count toward LTPE. For a complete definition of LTPE, see “Public Information Notice of Ex Post Assessments and Issues Related to the Policy on Longer-Term Program Engagement,” (PIN/06/96, 08/10/06); report entitled “Review of Ex Post Assessments and Issues Relating to the Policy on Longer-Term Engagement”; and “Ex Post Assessment of Members with Longer-Term Program Engagement—Revised Guidance Note”. 2 This report provides an update since the last report to the Executive Board from July 2013. 3 The Executive Board approved, on August 28, 2009, modifications to the procedures for EPAs in light of the Board discussion of Omnibus Paper on Easing Work Pressures. The changed procedures are discussed in detail in the Revised Guidance Note for Ex Post Assessment of Members with Longer-Term Program Engagement. Approved By Hugh Bredenkamp Prepared by Alexander Culiuc and Emmanuel Hife September 10, 2014 LONGER-TERM PROGRAM ENGAGEM ENT 2 INTERNATIONAL MONETARY FUND Table 1. Ex Post Assessments Considered by the Executive Board and Member’s LTPE Status (As of September 1, 2014) LONGER-TERM PROGRAM ENGAGEM ENT INTERNATIONAL MONETARY FUND 3 Table 1. Ex Post Assessments Considered by the Executive Board and Members’ LTPE Status (Concluded) (As of September 1, 2014) LONGER-TERM PROGRAM ENGAGEM ENT 4 INTERNATIONAL MONETARY FUND Table 2. Members with Longer-Term Program Engagement 1 (As of September 1, 2014)

Kijan pou site

Fon Monetè Entènasyonal (FMI), 2014, Rapò sou Ensidans Angajman Pwogram Alontèm yo, https://www.imf.org/external/np/pp/eng/2014/091014.pdf